Document Tracking and the Related Process Andria Roney Rob Mead Andy Fry Andrew Onken.

Slides:



Advertisements
Similar presentations
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Advertisements

NAS Requirements Services Update for the V&V Summit Kimberly Gill, ANG-B1 Division Manager October 10, 2012.
IBM Software Group ® Traceability From Need To Solution What, Why and How Tammy Lavi Alon Bar-Ner.
Federal Aviation Administration S1P1/P2 Production System: DCL Route Rules DCIT#32 16 April 2014.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 En Route Route Clearances Draft Use Case Introduction Boeing –
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved SECTION 12.1 PROJECT MANAGEMENT.
SE 555 Software Requirements & Specification Requirements Management.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
Federal Aviation Administration Data Communications Program Data Comm Trials and Production Requirements: High Level Impact Presented To: DCIT #23 Plenary.
Developing Enterprise Architecture
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
1 Configuration Management “The Cookbook Approach”
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
Data Communications Implementation Team (DCIT)
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Refined ECSS Software Process Model Elements SD-TN-AI-0570, Issue 5 APPENDIX D.
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #21 Plenary 02/01/2013 To: DCIT By: Gregg Anderson.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Meeting 08/24/2011.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #15 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
| 1 harris.com Matt Maki DCL Trials Lead DCL Trials Decommissioning Plan 29 Sep 2015.
Federal Aviation Administration Data Communications Program Final Investment Decision (FID) – Update on May 30, 2012 Presented to:SC-214/WG-78 Plenary.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #16 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
Presented by: Roger Sultan, FAA, AFS-430 Date: October 11, 2011 Federal Aviation Administration FPAW 2011 AC Rewrite Plan.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #12 Plenary 01/12/2011 To: DCIT By: Gregg Anderson.
International Civil Aviation Organization
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
Data Communications Implementation Team (DCIT)
Data Communications Implementation Team (DCIT)
Flight Standards Update
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
International Civil Aviation Organization
Data Communications Implementation Team (DCIT)
Data Communications Program
Data Communications Implementation Team (DCIT)
Data Communications Implementation Team (DCIT)
Trace requirements. What do we mean by the term “Trace”? Why should we trace? 2 Requirements Life Cycle Management Trace Requirements.
HO DOC Team Site – How to subscribe?
Configuration Management
Project Name - Project Kickoff
Presentation transcript:

Document Tracking and the Related Process Andria Roney Rob Mead Andy Fry Andrew Onken

Document Tracking Objective Recommend an effective approach to provide linking between documents to ensure alignment Recommend a process to maintain the alignment

Document Linking Strategy Add linking in DOORS for: E2E documents Use Cases Standards Documents (only applicable sections)

FPR ESSD WSSD SSSD DCNSD ERAM-DCNS IRD ERAM-TDLS IRD TDLS-SDB-WAS WSRD TDLS-CSP IRD DCNSM-SMS- WSRD RMS-RMLS IRD Routes E2E (Contains most loadable msgs) Initial and Full Services Use Cases CONOPS [includes Tower CONUSE En Route CONUSE) Avionics Test Procedures S1P2 Op Scenario Doc Scenarios System Models Mappings Gap Analysis DCL E2E for Production Satisfies System Requirements Interface Requirements SSSs SRSs Satisfies System Implementation Requirements Interface Implementation Requirements ERAM TDLS ICD ERAM- DCNS ICD ARINC 618 ARINC 620 DO-258A Conform. Stmt. DO-350 Conform. Stmt. ARINC 622 ARINC 631 DO-352 Conform. Stmt. Standards Documents DOORS Stakeholder Requirements Satisfies Implements S1P2 Session and Frequency Mgmt E2E Descrip STDDS TDLS IRD ERAM TIMS ICD TDLS CSP ICD DCNSM JMSDD ICD RLMS CMHP ICD TDLS RMLS ICD ** ** These docs are in DOORS but not yet linked Tests SI&T SSSD VRTM OT&E Test Requirements Tests ESSD VRTM WSSD VRTM DCNS VRTM requirements/design verified indirectly at ICD level Tests IRD VRTMs Tests S1P1 Integration Gap Analysis Report RTCA Standards Subscriber Database IRD Subscriber Database ICD Flight Deck Guidance Flight Deck Local Procedures AOC Local Procedures Tower Local Procedures GOLD (Global Operational Data Link Document) By reference Direct linking Tests Related To Key (up/toward) Maps to/Satisfies; Derived from

Document Change Process Origin of Changes The field - Sites/WJHTC Testing Addition of new capabilities DCIT recommendations OPRs Domestic OPRs International Current process in place to manage change within FAA realm Need to add DCIT stakeholders into current process Impact analysis Document updates to maintain consistency

FPR ESSD WSSD SSSD DCNSD ERAM-DCNS IRD ERAM-TDLS IRD TDLS-SDB-WAS WSRD TDLS-CSP IRD DCNSM-SMS- WSRD RMS-RMLS IRD Routes E2E (Contains most loadable msgs) Initial and Full Services Use Cases CONOPS [includes Tower CONUSE En Route CONUSE) Avionics Test Procedures S1P2 Op Scenario Doc Scenarios System Models Mappings Gap Analysis DCL E2E for Production Satisfies System Requirements Interface Requirements SSSs SRSs Satisfies System Implementation Requirements Interface Implementation Requirements ERAM TDLS ICD ERAM- DCNS ICD ARINC 618 ARINC 620 DO-258A Conform. Stmt. DO-350 Conform. Stmt. ARINC 622 ARINC 631 DO-352 Conform. Stmt. Standards Documents DOORS Stakeholder Requirements Satisfies Implements S1P2 Session and Frequency Mgmt E2E Descrip STDDS TDLS IRD ERAM TIMS ICD TDLS CSP ICD DCNSM JMSDD ICD RLMS CMHP ICD TDLS RMLS ICD ** ** These docs are in DOORS but not yet linked Tests SI&T SSSD VRTM OT&E Test Requirements Tests ESSD VRTM WSSD VRTM DCNS VRTM requirements/design verified indirectly at ICD level Tests IRD VRTMs Tests S1P1 Integration Gap Analysis Report RTCA Standards Subscriber Database IRD Subscriber Database ICD Flight Deck Guidance Flight Deck Local Procedures AOC Local Procedures Tower Local Procedures GOLD (Global Operational Data Link Document) By reference Direct linking Tests Related To Key (up/toward) Maps to/Satisfies; Derived from

Change -The field -Testing -Addition of new capabilities -DCIT -OPRs -Domestic -International ER Board Change reviewed. For considered changes Impact Analysis requested. In addition to current items should include: DCIT document impacts DCIT Operational Impacts Change Tracking Process ER Board Impacts reviewed – decision made. If any changes are made to initial change or how it should be implemented then DCIT is notified of results including any changes. DCIT Add Change and impacted documents to SharePoint Document Issue List for update tracking. FAA Documents (Req, design, etc.), SW, Test artifacts, etc. are updated DCIT Documents are reviewed by DCIT stakeholders AND FAA for consistency with FAA documents/implementation FAA Documents (Req, design, etc.), SW, Test artifacts, etc. are reviewed per process. FAA - CCB Approval per process. DCIT Final updated documents approved by Plenary FAA/DCIT Approved documents are baselined. A B A B Recommend DCIT Leads added to ER Board

Going Forward Leverage DCIT to identify links between DCIT documents to current DOORS documents/modules Leverage Use Case team/NUT/FAA Engineering to identify links between Use Cases to current DOORS documents/modules Leverage SE to identify links between CONOPS and Standards to current DOORS documents/modules Recommend linking to either SSSD OR SSD level and not both. Use DOORS to show relationship between SSSD and SSD levels. i.e., CONOPS currently shown as linking to both ESSD, WSSD and SSSD