FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague, 17.6.111.

Slides:



Advertisements
Similar presentations
Progress Report Günther RosnerNuPECC, Milano, 9/3/121.
Advertisements

FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther RosnerNuPECC Meeting, Bergen, 11/6/101.
Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
The Facility for Antiproton and Ion Research Günther RosnerNuPECC, FZ Jülich, 15/3/131.
The Physics of Nuclei, Nuclear Matter and Nucleosynthesis Report of the Nuclear Physics Advisory Panel.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt EU FP7 FAIR pp - 1st Reporting meeting March 6, 2009 J. Eschke, GSI EU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Status of the FAIR Project Boris Sharkov FAIR Scientific Director GSI AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia.
FAIR – Facility for Antiproton and Ion Research
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
European Strategy Forum on Research Infrastructures Dr.- Ing. Beatrix VIERKORN-RUDOLPH ESFRI Chair NuPECC Long Range Plan 2010, 9 th December 2010.
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
FAIR/SFRS meeting at HIPHeikki Penttila Oct 6, 2008 Facility for Antiproton and Ion Research FAIR is An international accelerator facility of the ”next.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
exchangeswith AnPHA AnPHA NSAC NSAC + ALAFNA Review status of the fieldReview status of the field Issue recommendations to advance t to advance the science.
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
International FAIR Boris Sharkov FAIR / MEPhI Scientific Managing Director, Lomonosov MSU 2015 Sweden FranceIndia Finland GermanyPoland UK Romania Russia.
NuPECC Mapping Studies FINUPHY/EURONS I3 EURONSFINUPHY/FP5 EURONS/FINUPHY Meeting, Funchal (Portugal), 7-9 February 2005 NuPECC Report 2002 “Impact, Applications,
Status of QUACO project
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
Status and Perspectives for the NuSTAR collaboration Reiner Krücken Physik Department E12 Technische Universität München.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
Chinese Contributions to FAIR Hushan Xu Institute of Modern Physics, CAS, Lanzhou
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
Strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland Spain.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
O. Kester, NuSTAR annual meeting, 27/02/2013
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt The Facility for Antiproton and Ion Research Peter Malzacher, GSI EGEE'09,
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany PANDA Collaboration, Giessen – 18 March 2014 Status and News from FAIR.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
ESR Slow highly charged ions and antiprotons
Perspectives for Heavy-Ion Collisions at Future Facilities
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
Ways to industry participation in CLIC 24th October, 2017
Introduction to the Workshop
Ladies and Gentlemen, Let me give you a short outlook to the operating of the new facility at this point. My colleague has just shown you, how we operate.
FAIR – the Universe in the labororatory
and collaboration with France
Presentation transcript:

FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,

PANDA FAIR Guenther RosnerNuPECC, Prague, Nuclear Structure & Astrophysics (Rare-isotope beams) Nuclear Structure & Astrophysics (Rare-isotope beams) QCD-Phase Diagram (HI beams 2 to 45 GeV/u) QCD-Phase Diagram (HI beams 2 to 45 GeV/u) Hadron Physics (Stored and cooled anti-protons) Hadron Physics (Stored and cooled anti-protons) Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Materials Science & Radiation Biology (Ion & antiproton beams) Materials Science & Radiation Biology (Ion & antiproton beams) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Accelerator Physics

Parallel Operation Guenther RosnerNuPECC, Prague,

Experiments Guenther RosnerNuPECC, Prague, NuSTAR PANDA APPA CBM

Guenther RosnerNuPECC, Prague,

Hadron Spectrocopy Guenther RosnerNuPECC, Prague, FAIR

Phases of Strongly Interacting Matter Guenther RosnerNuPECC, Prague, LHC FAIR

Staging Guenther RosnerNuPECC, Prague, Start Version Phase A (SIS100) Phase B (SIS300) Modularised Start Version Module 0Module 1Module 2Module 3Module 4Module 5 SIS100Exp. halls for CBM & APPA Super-FRS for NuSTAR Antiproton Facility for PANDA & options for NuSTAR LEB, NESR, FLAIR for NuSTAR or APPA RESR for PANDA, NuSTAR & APPA

Modularised Start Version Guenther RosnerNuPECC, Prague, APPA CBM/HADES NuSTAR PANDA Experiments M1: APPA M1: CBM/HADES M2: NuSTAR M3: PANDA M0 M1 M2 M3

MSV Timelines Guenther RosnerNuPECC, Prague, Submission of pre-planning documents to HBM Clarification of user requirements Modularised Start Version (MSV) Start revised pre-planning for MSV Expected approval of revised planning for MSV Preparation of documents for building permit Expected approval for (partial) building permit Start site preparation (clearing trees) Award contracts on civil construction work lot 1-4 Completion of civil construction work lot 1-4 Start installation of accelerators and detectors

MSV Costs Guenther RosnerNuPECC, Prague, Total accelerator and personnel Modules M€ Total civil construction Modules M€ FAIR contribution to MSV experiments costs*78 M€ FAIR GmbH personnel and running costs47 M€ Grand Total Modules M€ in 2005 € * Total MSV experiments costs ca. 170 M€ in 2011 €

Funding of FAIR Modules 0-3 Guenther RosnerNuPECC, Prague, Spain expected to join soon (11.87 M€) China and UK will contribute to experiments (6.6 M€)

FAIR Organigram Guenther RosnerNuPECC, Prague, Council Managing Directors B. Sharkov (Chairman), S. Richter Directors‘ Office Council Matters Office Legal Advisor 3 rd Party Funding Officer Technical Division Director: D. Kraemer Project Office Acc. Liaison Technical Follow-up In-kind Coordination Research Division Director: G. Rosner Exp. Coordination APPA CBM NuSTAR PANDA Site & Buildings Division (D. Kraemer, G. Rosner) Administrative Division Director: S. Richter Controlling & Resource Planning Finances

FAIR MSV Experiments APPA SPARC HEDgeHOBWDMBIOMAT CBMNuSTAR LEB Super- FRS HISPEC/ DESPEC MATSLASPECR3BR3BILIMA PANDA Guenther RosnerNuPECC, Prague,

Timelines Experiments Finish R&D phase2011 – Deliver prototypes of all essential parts Submit complete sets of TDRs2011 – Take decisions on alternative technical solutions Co-ordinate with2011 – Civil construction requirements – Accelerator setup schedule Identify critical pathways2011 – Milestones, timelines, deliverables Submit risk management plan2011 Secure funding2011/12 Negotiate MoU with FAIR2011/12 (Europe-wide) tendering2012 Build detector Commission detector2017 Initial period of data taking Guenther RosnerNuPECC, Prague,

Commissioning & Operation Commissioning MSV, Modules 0-3 – Top priority: Module 0 – SIS100 – Sequence of experiments depends on Civil construction Progress in – Prototyping & building of accelerators (storage rings) – Prototyping & building of production targets (RIB & anti-proton targets) – Prototyping & setting up of large-scale experimental equipment Funding (majority from outwith FAIR MSV budget) Operation MSV, Modules 0-3 – Signing of agreement on financing the FAIR operation budget three years after project has started Development of model for fair share of costs for operating FAIR Explore – Contributions from countries that are not shareholders, but participate in exploiting the facility scientifically – Set up common collaboration funds for running the experiments (cf. DESY & CERN) Modules 4 & 5, Phase B – Secure funding for civil construction, accelerators and experiments of Modules 4 & 5 – Continue R&D, in particular for SIS300, HESR Electron Cooler and NESR Electron Ring Guenther RosnerNuPECC, Prague,

Thank you very much Guenther RosnerNuPECC, Prague,