AD status in 2012, foreseen consolidations at AD ADUC 20/11/2012T. Eriksson CERN BE/OP.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

ELENA and AD Status ELENA project status and plans Status of the AD target consolidation (M. Calviani) Consolidation project for AD. What is done in 2011.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD.
Status of the AD ADUC 13/6/2012T. Eriksson CERN BE/OP.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Status and Prospects for the AD and ELENA
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
AD start-up 2014 A rough and brief summary MSWG 16/01/2015T.Eriksson BE/OP1.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
ELENA Hardware Baseline Current Document Status T. Birtwistle EN-MEF-DC.
ATC/ABOC 2007T. Eriksson CERN AB/OP AD Machine and Experimental Areas – Operation and major problems in 2006, outlook for 2007.
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Antiproton Decelerator (AD) Consolidation ADUC 13/1/2015T. Eriksson CERN BE/OP1.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
T.Eriksson P.Belochitskii G.Tranquille CERN, BE department, 1211 Geneva 9 September 2011T. Eriksson CERN BE/OP.
Low Energy Antiproton Facility at CERN Christian Carli on behalf of the AD and ELENA team …. with special thanks to P.Beloshitskii, T.Eriksson and S. Maury.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Slide 1 Overview Introduction Stochastic Cooling History of the Antiproton machines at CERN The AD and ELENA Conclusion.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
Report Technical Director Storage-Ring-Installation Completed
Oleksiy Dolinskyy December 1st, 2014
Status of HESR 18th March Gießen Dieter Prasuhn.
Overview of Extra Low ENergy Antiproton ring (ELENA) and TE-EPC contribution to the project TE-EPC Group Meeting Michal Dudek 25th June 2015.
ELENA installation and commissioning status
Installations up to Start of Commissioning
AD consolidation activities in LS2
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
ELENA Beam Transfer Workpackage
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
ELENA Extra Low ENergy Antiproton Ring
ELENA beam commissioning
Presentation transcript:

AD status in 2012, foreseen consolidations at AD ADUC 20/11/2012T. Eriksson CERN BE/OP

First the good news…. Excellent beam stability/quality throughout 2012 and very few machine faults with several new records: –Beam availability for users: 90% (to date) =ALLTIME HIGH! –AD machine uptime: 95% (to date) =ALLTIME HIGH! –~5400 hrs of physics foreseen (4850 to date) =ALLTIME HIGH! End of physics 17/12/2012 at 08:00 ADUC 20/11/2012T. Eriksson CERN BE/OP

AD cycle/performance Good deceleration efficiency has been maintained during the run (~ 90%) Less tuning needed (no corrections at all at 300MeV/c f. ex.) Ejected beam: –~No transverse tails H/V –Bunch length = 100 – 170 ns –H/V emittances: 85/90 % of beam within 1 .mm.mrad ADUC 20/11/2012T. Eriksson CERN BE/OP

md At startup: careful setup of trajectories through e-cooler. Use of Schottky diagnostics for scans instead of scrapers => contributes to better stability over the year(?) Losses 2 => 0.3 GeV/c: some gain by optimising tunes before/during /after ramp. Remaining losses due to large transverse emittances, more pronounced at higher intensities. Reduced by increasing cooling duration at 2 GeV/c. Pickup/orbit system (in view of ELENA design): reproducibility starts to degrade at 2*10 6. GEM tests at 500 MeV/c: ok ! Measurements on ring BPM:s (in view of ELENA design) ADUC 20/11/2012T. Eriksson CERN BE/OP

md Bunched beam cooling at 100 MeV/c (to further reduce dp/p in view of ELENA transfer line design). –Increase duration of bunching process from 0.5 s. => cooling rate faster than dp/p increase. –Slow set-up –0.5s : dp/p = 4.1*10 -4 –2.0s : dp/p = 2.5*10 -4 –5.0s : dp/p = 1.3*10 -4 –Stability can be an issue –Next: check bunch length with bunch rotation ADUC 20/11/2012T. Eriksson CERN BE/OP

md Studies on ejection line optics mismatch (md): –Kick response measurements show(ed) incoherencies –Important for ASACUSA RFQD matching + ELENA transfer line design –Common part is validated up to DE0.GEM42 after shielding of BHZ8000 and including DE0.BHZ fringe fields in calculations –Dipole fringe fields included in MAD calculations for all the lines –ASACUSA: new (promising) optics available; need setting up downstream of RFQD –ATRAP1: new optics with Bh reduced from 1000 to 200m in use –ATRAP2: new optics to be validated –ALPHA: still discrepancies, probably due to solenoid fringefields. How to include this in MAD? –AEGIS: in operation ADUC 20/11/2012T. Eriksson CERN BE/OP

AD consolidation “Old” consolidation program since 2009, mostly completed Program is now revised and requests from all groups being collected taking ELENA lifespan into account More items might be added….. Cost for requested items (2013 – 2019) > ELENA project cost Budget request will be made ADUC 20/11/2012T. Eriksson CERN BE/OP

Preliminary consolidation items Magnets, ring and transfer lines –Ongoing: Ring BHN spare coils: order placed, delivery 2013 (to complete spare parts inventory) Orbit correctors 2904/2917: Installation of new magnets in LS1 –ELENA-era consolidation: Overhaul of ring main bending and quad magnets: removal/disassembly of one bending unit for assessment during LS1 => re-shimming?, build complete spare unit? 7020/7030 quads: new magnets, installation in LS1 ++ Power converters –Ongoing: DR.Q-TRIM2,4 and 5 upgrade in LS1 Main B/Q + BTI247 magnetic component spares: delivery in 2012 –ELENA-era consolidation: Study soon to be published by TE/EPC (tech + budget requests) Planned for ADUC 20/11/2012T. Eriksson CERN BE/OP

Beam cooling, stochastic –Ongoing: Electronics for system parameter control: replacement of obsolete equipment/controls interface with PLC-based system. Ready for use in 2014 u-wave amplifier power supplies: replace existing large units with 48 individual supplies + renewed PLC-based controls. Installation in LS1. N.B. support will change from TE/EPC to BE/RF Pickup/kicker movement: Update of obsolete system with modern digital servo motor controller. To be done during LS1 –ELENA-era consolidation: Renewal of u-wave amplifiers: needs evaluation, cost ~ 2 MCHF p/u & kicker vacuum tanks: returned from GSI in 2012 => To be used as test bench for new p/u & kicker movement system components and spares ADUC 20/11/2012T. Eriksson CERN BE/OP

Beam cooling, electron –ELENA-era consolidation: Build a completely new modern cooler ~ 2.5 MCHF Existing cooler: –Is >30 years old –We have no spare magnets; very long down time if failure, significant cost for new spares –Performance issues (?) –e- bpm:s not operational –Contains unused equipment Planned for ADUC 20/11/2012T. Eriksson CERN BE/OP

RF –Ongoing: C10: renewal of 1kW drivers. 2 units are delivered to CERN. 1 unit is operational and under evaluation/improvements due to initial problems –ELENA-era consolidation: C02 tuning system and HT-supply renewal: to be started. Equipment needs to be displaced for ELENA – has to be done in LS1 C10 final stage tubes: We do not have enough spares to operate the 2 systems. Market survey in progress => might need completely new power system. Cost > 1 MCHF C10 electronics/controls renewal C10 low-level upgrade C10 Beam control: migration to standard DSP-based system. C10 system to be done ~ 2017 Schottky analysis (longitudinal): integrate ageing DSP equipment into new LL beam control system ADUC 20/11/2012T. Eriksson CERN BE/OP

Beam transfer –ELENA-era consolidation: Kicker Vacuum tanks 55/56: Structural improvements (leaks) : LS1 Kicker Electronics/controls renewal: included in the ELENA planning since the platform needs to be displaced: 2015/16 Septa electronics/controls renewal: 2015 Magnetic Horn: –HV power supply: LS1 –Replace Mercury ignitrons with solid state switches: 2014 – 2016 –New horn test bench (B174 dismantled): Instrumentation –ELENA-era consolidation: Orbit system renewal:LS1 IPM system renovation: LS 1 BCT (TFA6006 and 5302) renewal, BCT (all) electronics/software update: 2015 Scraper spares: ADUC 20/11/2012T. Eriksson CERN BE/OP

Vacuum –ELENA-era consolidation: –Cryopumps (C10 cavities, s-cooling pickup tanks)LS1 –New bakeout equipmentLS1 –Ion pump feedthrough heaters (corrosion problems)LS1 –Ion pump replacement –Gas injection system renovation2016 –Injection line equipment renovation2016 –Turbo pumps HW + controlsLS1 & –Vacuum controls ADUC 20/11/2012T. Eriksson CERN BE/OP

Target area –ELENA-era consolidation: Target/Horn control system updateLS1 Transport system consolidationLS1 Remote survey system updateLS1 GSM network2014 Radioactive air release monitoring (RAMSES)2015 Cooling/ventilation controls update2015 – 2016 Building consolidation (RP contamination risk)2014 – 2018 Reassembly of spare horn/stripline2017 New target&horn chariot system2017 – 2018 Target area cooling system modification2018 – 2019 Spare target redesign/construction ADUC 20/11/2012T. Eriksson CERN BE/OP

Infrastructure & other ELENA-era consolidation: –General safety & exterior (guardrails, crinoline, parking..)2014 –Building; foundations inspection & consolidation2015 –Roof consolidation 2020 –Renovation of 2 50t cranes in AD hall2018 –Cooling & chiller plants2017 – 2018 –Cryo distribution for experimental areas2015 – 2016 ADUC 20/11/2012T. Eriksson CERN BE/OP

LS1 and AD Several interventions in the AD ring (ELENA preparation, maintenance, consolidation): –DR.BHN06 to be removed for dismantling and inspection = > will give an idea of the condition of the 24 ring dipoles –Several items in “zone C”: Replace SME5307 with spare (water leak) Replace QFO7020 and QDE7030 (new type) + re-arrange layout of line Remove KFI 5506/5606 for renovation (vacuum/welds) Remove BHZ8000 (ELENA transfer line space) –Remove s-cooling pickup tanks 32/33 for Cryo-renovation –Replace e-cooler correctors 2904/2917 with new type –New access door(s) MAD/PAD, –BIPM re-arrangement: both H and V systems to sector 42 ADUC 20/11/2012T. Eriksson CERN BE/OP

ADUC 20/11/2012T. Eriksson CERN BE/OP

LS1 and AD cont:d –Complete controls upgrade: Front-end (DSC:s) replacement (ACCOR) FESA migration (some GM classes will remain for while) mtg/timing: de-couple AD from the PS complex, ELENA timing TG8 and GFA replacement MIL1553 replacement. New hardware and software (industrial PC). InCA will be deployed in AD (required by new central timing). DPRAM and MPV908 samplers replaced by new hardware and software (integrated in OASIS).  Limited access possibilities in certain areas  “interesting” startup in 2014….. ADUC 20/11/2012T. Eriksson CERN BE/OP