April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.

Slides:



Advertisements
Similar presentations
eQuest Quick Energy Simulation Tool
Advertisements

PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
Sustainability and Energy ServicesSustainability and Energy Services.
ASSESS TARGET DELIVER MEASURE Understanding Building Energy Audits Joe Hofstetter P.E., CEM, LEED AP Karpinski Engineering.
Process & Benefits of Monitoring Based Commissioning David Jump, Ph.D., P.E. Principal Quantum Energy Services & Technologies, Inc.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Energy Performance Analysis with RETScreen
+ Impact Evaluations and Measurement and Verification First we will focus on ‘Gross Savings’ Determination - savings determined irrespective of why 1 Kentucky.
December 10, 2007 Multi-family Residential Unit Audits - Garden Apts and Smaller housing stocks1 Multi-Family Residential Unit Audits Garden Apartments.
MEASUREMENT & VERIFICATION
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
The Bottom Line In Energy Cost Reduction Energy Automation Systems, Inc. EASI.
There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.
Motivating Facilities Staff Towards Improved Operational Efficiency Motivating Facilities Staff Towards Improved Operating Efficiency Peter H. Herzog,
Building Commissioning
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
Environmental System Science November 18, 2009 Identifying Energy Conservation Measures. Tailoring Retro-commissioning to meet your needs.
1 State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Deep retrofits: You get what you pay for Leslie Kramer, Stanford University and Jonathan Schoenfeld, kW Engineering June 17, 2014.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Rachel Weaver Program Manager Maryland Energy Administration
Genesis Solar Module Brochure ™
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Commissioning: A University Perspective May 3, 2006 Rebuild Michigan Workshop Advanced Energy Technologies for Commercial Buildings.
From Research Prototype to Production
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
2 of 45 WELCOME TO BUILDING COMMISSIONING 101 Building Commissioning Association.
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
M&V Part 2: Risk Assessment & Responsibility Allocation.
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
Building Commissioning/Energy Performance Contracting.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
M&V Part 4: M&V Plan Review. 4-2 M&V Plan Review Ø FEMP Documents F M&V Overview Checklist (Phase 2) F Final M&V Plan Checklist (Phase 3) Ø Risk & Responsibility.
Center for Energy and Environment Cost Effectiveness Determination & Benefits and Resources Russ Landry, PE, LEED® AP Center for Energy and Environment.
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
Electric / Gas / Water MAESTRO Evaluation Showcase July 26-27, 2006 Project Manager: Pierre Landry, SCE Lead Consultants: Mike Rufo, Itron; Keith Rothenburg,
PG&E Automated Demand Response Program: IDSM Lessons Learned
Introduction to Energy Management Doty, Steve & Turner, Wayne. (2009). Energy Management Handbook. Lilburn, GA: The Fairmount Press. Jacobsen, J. (2011).
Energy Project M&V: Reports that Add Value October 27, 2015.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Energy Efficiency Forum State of California/Investor Owned Utility Partnership Program Date: September 27, Partnership. A Unique Opportunity.
Energy Efficiency Update Before the Senate Energy, Utilities & Communications Committee Part 2 May 17, 2011 – State Capitol Robin Smutny-Jones Assistant.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
1 Potomac Electric Power Company Case 9155 & Delmarva Power & Light Case 9156 EmPOWER MARYLAND DRAFT NON-RESIDENTIAL ENERGY EFFICIENCY AND.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Energy Savings Performance Contracts & Energy Service Companies
Seminar On Energy Audit Submitted To: Submitted By:
NEEA Products Council Meeting Air Saving Unit Investigation
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
NEEA Products Council Meeting Air Saving Unit Investigation
2018 Retro-Commissioning (RCx) Program
Presentation transcript:

April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing Skills

April, 2002Energy Audits2 Overview of energy audits Billing analysis Reviewing plans, specifications, submittals Preparing for the site visit Retrofit cost analysis Developing a baselining plan Discussion of field measurement Agenda

April, 2002Energy Audits3 Identify energy savings potential –improve efficiency –conservation Improve building performance Address comfort problems Pursue utility incentives Prepare for commissioning Why perform an audit?

April, 2002Energy Audits4 Analysis –Billing data –Building documentation and drawings Facility walk through –During typical operation –After hours Final Report –Recommended Energy Conservation Measures –Energy/$ savings analysis –Other facility improvements Components of an Energy Audit

April, 2002Energy Audits5 Preliminary/Walk though audit Detailed/Investment-Grade audit Focused audit (process loads) Commissioning Types of Energy Assessments

April, 2002Energy Audits6 Preliminary Energy Audit Intention: identify in rough terms, cost-effective retrofits Focus: standard retrofit technologies Walk-though, Quick Cost $0.01 to $ 0.05/sf. Minimal instrumentation required Reporting –Recommended ECMs –Some cost analysis (simple pay-back) No computer simulation

April, 2002Energy Audits7 Intention: develop complete energy assessment Focus: thorough assessment of facility costs and operation Will require multiple site visits Cost $0.10 to $ 0.30/sf. Advanced tools required Reporting –Recommended ECMs –Estimates of energy savings, installation costs… (life-cycle analysis) –M&V plan Computer simulation Detailed Energy Audit

April, 2002Energy Audits8 Commissioning is done to “verify and ensure that building elements and systems are designed, installed, and calibrated to operate as intended.” (LEED definition) Building Commissioning Overall Cost Reductions from Cx Data from”What Building Owners Should Know About Building Commissioning”, Wolpert & Deall,

April, 2002Energy Audits9 Why Commissioning? Assures building are fully functional at completion of construction Limits building performance problems Complexity and specialization of modern buildings require Cx Limits change orders and increased costs during construction Limits occupant comfort complaints Provides complete documentation of building project produced Energy savings realized Equipment realizes a longer life Incentives may be available Encourages an integrated design approach Introduces owner advocate/neutral party Building Commissioning

April, 2002Energy Audits10 Document design intent Assist with specifications for bid documents Develop Commissioning plan Develop pre-functional and functional test procedures for all equipment Oversee testing (at post-occupancy not just post-construction) Review training and manuals for operations & maintenance staff Provide a complete final commissioning report The Commissioning Process

April, 2002Energy Audits11 Billing Data Analysis

April, 2002Energy Audits12 Flat rate (fixed $/kWh) Time of use rates –Rates ($/kWh) vary by demand periods –PG&E rates: A6, E7 Demand rates –$/kWh –$/kW –Power factor adjustment –Rates may vary by demand periods –PG&E rates: A10, E19, E20 Real time pricing –$/kWh rate changes based on real cost of generation –PG&E rates: Experimental A-RTP Types of Electric Utility Rates For all rates go to:

April, 2002Energy Audits13 E-20S Rate