André van Es 2 nd SKADS Workshop 10-11 October 2007 Review on Deliverables and forward look André van Es.

Slides:



Advertisements
Similar presentations
Formulation, planning, budget information provided by Department of Planning & Evaluation Analysis and Preparation of Funding Resolution Approval of the.
Advertisements

SKADSMTAvA A. van Ardenne SKADS Coördinator ASTRON, P.O. Box 2, 7990 AA Dwingeloo The Netherlands SKADS; The.
SKAMP Square Kilometre Array Molonglo Prototype. Supporting Institutions  University of Sydney  Argus Technologies  ATNF  ICT Centre.
Security Education and Awareness Workshop January 15-16, 2004 Baltimore, MD.
Portable and Predictable Performance on Heterogeneous Embedded Manycores (ARTEMIS ) ARTEMIS Project Review October 2014 WP1 “Management and IPR”
C3 Goals Students will: 1.acquire teamwork competencies 2.acquire knowledge, values and beliefs of health professions different from their own profession.
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Jan Geralt Bij de Vaate DS4-T4 Wideband Integrated Antennas DS4-T4 Jan Geralt Bij de Vaate ASTRON.
/ department of mathematics and computer science TU/e eindhoven university of technology CEDEFOP workshop: Policy, Practice, Partnership: Getting to Work.
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
Name1 title 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Progress in Active Antenna Design and Developement - FIDA3 Timothy Finn FG-IGN
Georgina Harris1 2-PAD 4 th SKADS Workshop, Lisbon, 2-3 October Polarisations All Digital Dr Georgina Harris / Prof Tony Brown SKADS System Design.
AA-Low Technical Progress Meeting, October 2012, Medicina, Italy AAVS0 & AAVS0.5: System Design and Test Plan Nima Razavi-Ghods Eloy de Lera Acedo.
Steve Torchinsky SKADS Science Overview Lisbon 2007 Jan 12 SKADS Science Overview.
SKADS1WorkshopAvA Coordinators report First SKADS Workshop Paris 04 September 2006 Arnold van Ardenne SKADS Coordinator SKADS Project Office ASTRON,
Eloy de Lera Acedo 2 nd SKADS Workshop October 2007 DS4T4 Differential Dual Polarized Antenna Array Design - Eloy de Lera Acedo - Research Associate.
SKA Introduction Jan Geralt Bij de Vaate Andrew Faulkner, Andre Gunst, Peter Hall.
S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
Arnold van Ardenne SKADS Status 4 th SKADS Workshop, Lisbon, 2-3 October th SKADS WORKSHOP October 2008 in Instituto Superior Técnico, Lisbon.
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
Rosie Bolton1 SKADS Costing work 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS Costing work: Spreadsheets to scalable designs Rosie Bolton Dominic.
Andrew Faulkner1 SKADS and SKA 4 th SKADS Workshop, Lisbon SKADS and SKA Andrew Faulkner.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
Background Management Council (MC) was briefed on approach in early Feb 2003 and approved it Agreed that every Service Group (SG) will participate in.
Council Presidents’ Seminar General Session April 10, 2014.
Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 S.Montebgnoli IRA -INAF- Bologna –Italy- 4 th SKADS Workshop, Lisbon, 2-3 October.
1 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 EMBRACE Deliverable Status overview G.W. Kant ASTRON, The Netherlands.
AAs in PEP Jan Geralt Bij de Vaate. PEP Project Execution Plan for the pre construction phase of the SKA Consortium to be formed AA-low ready for construction.
CASS, Marsfield Phil Diamond 4 October 2011 SKA Pre-Construction Phase: Where we are, and what we’re trying to achieve ?
Andrew Faulkner 2 nd SKADS Workshop October 2007 SKADS Benchmark Scenario Andrew Faulkner.
Peter Wilkinson1 Conclusions 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS aims to –Demonstrate SKA Scientific Viability and Readiness –Demonstrate.
DS3-T1 Network Infrastructure & Data Transmission Simon Garrington JBO/Manchester UK Feasibility study of the optical fibre network required to support.
2 nd SKADS Workshop October 2007P. Colom & A.J. Boonstra 1 Outline -progress in RFI mitigation (methods inventory) -system design & RFI mitigation:
H Philip Diamond RadioNet Coordinator University of Manchester Jodrell Bank Observatory Implementation Plan for next 18 months MTR: 12 April 2007 Grenoble.
Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Band-2 Prototype Cartridge Project – Summary for ASAC meeting Optical design was completed, implemented and characterized. MMIC CLNA designs complete,
Overview and status of the project EuroVO-AIDA – Final review – 5 October 2010 Françoise Genova, Project Coordinator, 1 Overview and status of the project.
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) SKA AA-Mid Progress Meeting Johan.
A.O. Henrik Olofsson1 EMBRACE Solar Scans 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Sun observations with prototype tile Test carried out at ASTRON.
Philippe Picard 2 nd SKADS Workshop October 2007 Station Processing Philippe Picard Observatoire de Paris Meudon, 11th October 2007.
Steve Rawlings1 DS2-T1 Overview 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Science Simulations (DS2-T1) Overview With thanks to Hans-Rainer Klöckner.
Paul Alexander 2 nd SKADS Workshop October 2007 SKA and SKADS Costing The Future Paul Alexander Andrew Faulkner, Rosie Bolton.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris 2-PAD Infrastructure Georgina Harris SKADS System Design and Team Leader.
Dr Danielle Kettle1 LNA progress 4 th SKADS Workshop, Lisbon, 2-3 October 2008 LNA progress.
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,
JGBdV RadioNet Westerbork Nov PHAROS PHased Arrays for Reflector Observing Systems THE UNIVERSITY OF BIRMINGHAM.
UNIT 12 STRATEGY EVALUATION AND CONTROL
Mid Frequency Aperture Arrays
ITI Portfolio Plan Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Current Date Visibility of ITI Projects ITI Projects.
IRA – INAF Bologna (I) DS-6 16 September 2018 SKADS Workshop 2006
Milestones & Deliverables BENE III period Jan 06 - Jun07
SKADS Controller’s Meeting Timeline Annual Financial Report
HUIT is mission-driven, goal-oriented, and values-based
WP 3 – Investment Planning and Asset Management
VLA to EVLA Transition Plan
Technical Foundations & Enabling Technologies – DS4
District Office, Room 200 October 28, :30 PM
CEOS & Work Plan Status Steven Hosford WGISS-46 22nd October 2018
DS4-T1 FRONT-END TECHNOLOGIES
Jan-Geralt Bij de Vaate
PHAROS PHased Arrays for Reflector Observing Systems
A High Intensity Neutrino Oscillation Facility in Europe
SKADS Controller Meeting
Ctclink executive leadership committee May 31, 2018
ASTRON EMBRACE Project status G.W. Kant.
Presentation transcript:

André van Es 2 nd SKADS Workshop October 2007 Review on Deliverables and forward look André van Es

André van Es 2 nd SKADS Workshop October 2007 Review of deliverables Three levels of deliverables: Level 3: Deliverable at Tasks Level 2: Deliverable at Design Study Level 1: Deliverable at Project Level 0: Deliverable at Board Level We present progress in terms of the Level 0 deliverables

André van Es 2 nd SKADS Workshop October 2007 DS-1ASTRON University of Manchester Observatoire de Paris DS-2 Rijks Universiteit Groningen ASTRONINAF-IRAMPIfR Universidad de Valencia CSIROSwinburne Leiden Observatory ChalmersOxford University of Manchester Observatoire de Paris Cambridge University of Melbourne Natal University PRAO-LPI University of Leeds University of Glasgow University of Adelaide DS-3 University of Cambridge ASTRON University of Manchester CSIROINAF-IRA University of Oxford Cambridge University Observatoire de Paris National Research Foundation DS-4 University of Manchester ASTRON Observatoire de Paris INAF-IRAFG-IGN University of Oxford CSIRO National Research Council University of Cambridge University of Orléans CNRSOMMIR DS-5ASTRON University of Manchester Observatoire de Paris JIVEINAF-IRAMPIfR Oxford University CSIRO National Research Foundation UMK University of Cambridge OMMIC DS-6INAF-IRAASTRONJIVECSIRO Univ. Sydney DS-7: University of Manchester, Observatoire de Paris

André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-1

André van Es 2 nd SKADS Workshop October 2007

André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-2

André van Es 2 nd SKADS Workshop October 2007 A Report and Proceedings...

André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-3

André van Es 2 nd SKADS Workshop October 2007 SKADS Design & Costing Paper (SKA Memo 93)

André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-4 Nominal Completion Date Planned Completion Milestone DS dec-06 done SiGe band pass filter using PIC technology prototype DS dec dec-08 ADC performance evaluation DS4 3 1-jul-07 1-jul-08 Hybrid LNA first devices DS4 4 1-jul-06 1-jul-08 Inventory of RFI mitigation techniques and applicability to SKA DS4 5 1-jul-07 1-jul-08 Evaluation of impact of moving interference sources on SKA DS okt-07 1-mrt-08 Characterised antenna element DS4 7 1-mrt-08 1-jul-08 antenna element with integrated MMIC prototype DS4 8 1-jul-07 1-mrt-08 Simulated Digital beamformer for 2-PAD DS dec-06 done Prototype low cost SiGe analogue beamformer DS dec-08 2-feb-09 Prototype complete 2-PAD digital tile DS jun jun-09 Final reports on semiconductor technologies, RFI mitigation strategies, antenna element design, digital beamformer design 2-PAD performance (T1-T6)

André van Es 2 nd SKADS Workshop October 2007 Prototype of Low Cost SiGe Beamformer

André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-5

André van Es 2 nd SKADS Workshop October 2007 EMBRACE 10 tile prototype

André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-5

André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-6

André van Es 2 nd SKADS Workshop October 2007 BEST Report on optical links

André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS-7 Task number Deliverable No Deliverable Name Planned (in months) Achieved (in months) DS7-T1 1 SKADS Quarterly Report Q4/ DS7-T1 2 SKADS Quarterly Report Q1/ DS7-T1 3 SKADS Quarterly Report Q3/ DS7-T1 4 SKADS Quarterly Report Q4/ DS7-T1 5 SKADS Quarterly Report Q1/ DS7-T1 6 SKADS Quarterly Report Q3/ DS7-T1 7 SKADS Quarterly Report Q4/ DS7-T1 8 SKADS Quarterly Report Q1/ DS7-T Annual Report to International SKA Project Office DS7-T Annual Report to International SKA Project Office DS7-T Annual Report to International SKA Project Office 24 25

André van Es 2 nd SKADS Workshop October 2007 A Quarterly Report...

André van Es 2 nd SKADS Workshop October 2007 Updated Plan Prior to 2 nd Annual Report project planning was updated All Design Studies submitted new milestone/deliverable table New milestone dates were discussed and agreed with DS leaders SKADS on track to finish on 30 th June 2009

André van Es 2 nd SKADS Workshop October 2007 Deliverables/Milestones planned (update 2 nd annual report)

André van Es 2 nd SKADS Workshop October 2007 Next 18 months (major milestone for each DS) DS2: Final Report on SKA configurations DS 3: –Implementation of Cost and Functional simulator tool –Selection of networking and computing technologies DS 4: Completion of 2-PAD design DS 5: Build and first testing of EMBRACE at Westerbork and Nancay (100 tiles) DS 6: BEST demonstrating beamforming and Hl sensitivity astronomical tests DS 8 : First iteration of Overall System Design and Project plan

André van Es 2 nd SKADS Workshop October 2007 Review on deliverables: DS 8 Design Study 8 produces the major deliverables of the project (the focal and cohering point of SKADS): 1.Overall System Design 2.Preliminary SKA Plan 3.White Paper for the ISSC It is the collection of all activities and will show and establish the direction towards the SKA