2 2 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Deliverabl e/ Milestone No Deliverable/Milesto ne Name Workpacka ge/Subt ask No Lead Contractor( s) Planned (in months) Achieved (in months) DS5-1Completion of system requirements DS5-T1166 DS5-2Design review of first tile DS5-T11811 DS5-3Delivery of first manufactured tile DS5-T111213 DS5-4Completion of 10 tile system DS5-T112025 DS5-5Completion of first 100 tiles DS5-T2135(41) DS5-6Completion of all remaining tiles DS5-T2142(45) DS5 top level deliverables

3 3 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Deliverable / Milestone No Deliverable/Milestone Name Workpacka ge/Subtask No Lead Contractor(s ) Planned (in months) Achieved (in months) DS5.T1.1System Design and Test reports on first tile DS5-T111416 DS5.T1.2Final Design and Test Report on 10 tile system results DS5-T1123(40) DS5.T2.1Delivery of first 100 tiles to Westerbork and Nancay DS5-T2135(42) DS5.T2.2Manufacturing report and Test report of complete stations at Westerbork and Nancay DS5-T2/T31,546(46) DS5 top level deliverables

4 4 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Deliverabl e/ Milestone No Deliverable/Milesto ne Name Workpacka ge/Subtask No Lead Contractor( s) Planned (in months) Achieved (in months) DS5.T3.1Final report with conclusions and recommendations for the SKA technology review DS5- T1/T2/T3 1,548(48) DS5 top level deliverables

5 5 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Task number Deliver able No Deliverable Name Workpac kage /SubTask No Delivered by Contract or(s) Planned (in months) Achieved (in months) T11Design of the first tile finished WP1188 T12Design ten tile system finished WP111920 T13System requirements frozen WP112730 T14Design final station finished WP1130 DS5 T1 deliverables

6 6 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Task number Deliver able No Deliverable Name Workpac kage /SubTask No Delivered by Contract or(s) Planned (in months) Achieved (in months) T21Manufacture and integration of the first tile WP1112 T22Manufacture and integrate a 10 tile system WP1/WP312124 DS5 T2 deliverables

7 7 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Task number Deliver able No Deliverable Name Workpac kage /SubTask No Delivered by Contract or(s) Planned (in months) Achieved (in months) T23Manufacture and integrate first 100 tiles of the final station WP1/WP 3 135(40) T24Finalize production and integration of the final station at Westerbork and Nancay WP1/WP 3 1,541(45) DS5 T2 deliverables

8 8 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Task number Deliver able No Deliverable Name Workpac kage /SubTask No Delivered by Contract or(s) Planned (in months) Achieved (in months) DS5-T31Engineering Testplan WP1ASTRON28Not yet delivered (see text) DS5-T32Astronomical Testplan WP1OPAR32 DS5-T33Initial Engineering Test Report WP1ASTRON45Not due DS5-T34Final Engineering and Astronomical Test Report WP1OPAR48Not due DS5 T3 deliverables