Global Development in Humanitarian Action Information Management Updates 1 4 th Pacific Humanitarian Team Annual Meeting 17-21 October Holiday Inn, Suva,

Slides:



Advertisements
Similar presentations
To improve the lives of vulnerable people by mobilizing the power of humanity Dr. Patrick Fox SEA DM Coordinator.
Advertisements

Tips and Resources IASC Cluster/Sector Leadership Training
WASH Cluster – Emergency Training S WASH STRATEGY Session 2 Planning in Context S2 1.
CP Sub-Cluster Coordinator Training CP Sub-Cluster Coordinator Training 2010 The Role of the Coordinator in Information and Knowledge Management.
CP Sub-Cluster Coordinator Training CP Sub-Cluster Coordinator Training 2010 The Child Protection Sub-Cluster.
ASSESSMENT & PLANNING FOR POST-DISASTER RECOVERY OF COMMUNITY INFRASTRUCTURE United Nations Development Programme Bureau for Crisis Prevention & Recovery.
Core Commitments for Children in Humanitarian Action
Humanitarian Reform and the Cluster Approach: a Stronger More Predictable Humanitarian Response System.
Humanitarian Programme Cycle Updates
Session 4 Responding to an Emergency. Objectives At the end of this session, you will: Be familiar with the RC/HC Handbook and the Emergency Checklist.
Addressing Gender based Violence (GBV) in Humanitarian Situations in the Asia and the Pacific Region Ms Devanna de la Puente Inter-agency Regional Emergency.
COORDINATED ASSESSMENTS: FROM POLICY TO PRACTICE June 2012.
The IASC Transformative Agenda. Floods inFloods inPakistan 2010 Earthquakes In HaitiIn Haiti UN Photo/Logan AbassiUN Photo/Evan Schneider.
Pillar 4a Information management
UN Roundtable on Older Persons in the 2004 Tsunami February 13-14, 2006 Recommendations.
UNITED NATIONS OFFICE FOR THE COORDINATION OF HUMANITARIAN AFFAIRS (OCHA) - Preparedness - Increase effectiveness of Disaster Response NATF/ACAPS Training.
Management Consulting Team (MCT) UNDP/BCPR DISASTER-RELATED INTERVENTIONS Disaster Risk Reduction Early Recovery SURGE capacity 0.
FUNCTION 6 – CONTINGENCY PLAN, PREPAREDNESS AND CAPACITY BUILDING
The Process of Conducting a Post Disaster Needs Assessment (PDNA) United Nations Development Programme Bureau for Crisis Prevention and Recovery Bangkok,
1Office for the Coordination of Humanitarian Affairs (OCHA) CAP (Consolidated Appeal Process) Section The Consolidated Appeal Process Rome, 9-10 May 2012.
Inter-Cluster Information Management Initiative. Main themes Website harmonisation (global and country level) IM toolkit and guidance (support package)
Global Framework of Humanitarian Information Management (session 4) Information in Disasters Workshop Tanoa Plaza Hotel, Suva, Fiji June
SIMA COORDINATED ASSESSMENT JOINT HUMANITARIAN ASSESSMENT (JHA)
GLOBAL SHELTER CLUSTER Update May GLOBAL SHELTER CLUSTER IASC members & standing invitees GSC active participants UNHCR, IFRC – co leads/conveners.
POST DISASTER NEEDS ASSESSMENT I n t e r n a t I o n a l R e c o v e r y P l a t f o r m.
Multicluster Rapid Needs Assessment 10-Step Process 1.Initiation and Engagement 2.Design and Planning 3.Establishment of Coordination 4.Methods determination.
CP Sub-Cluster Coordinator Training CP Sub-Cluster Coordinator Training 2010 The Role of the Coordinator in Situational Assessments.
Needs Assessment Overview Assessment and Classification of Emergencies (ACE) Project IASC Weekly Meeting 28 January 2009.
Orientation on Coordinated Assessments The IASC Needs Assessment Task Force.
1. IASC Operational Guidance on Coordinated Assessments (session 05) Information in Disasters Workshop Tanoa Plaza Hotel, Suva, Fiji June
Coordination and Net Working on DRR Rapid Emergency Assessment and Coordination Team (REACT) Bishkek November, 2009.
The IASC Humanitarian Cluster Approach Angelika Planitz UNDP BCPR Developing Surge Capacity for Early Recovery March 2006.
Community Coping Skills PAHO Leaders Course November 2006 Jamaica Lois Hue Lois Hue.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
1 Pacific Logistics Cluster. 2 What is Logistics ? Several Definitions… Getting the right thing at the right time in the right place at the right cost…
Sphere India: Genesis and Milestones Sphere India: Present Status Sphere India Management Structure Sphere India: Future Plans Sphere India.
Needs Assessment Task Force The story of MIR(N?)A IASC Needs Assessment Task Force Geneva, 18 March 2011.
ACCOUNTABILITY TO AFFECTED POPULATIONS Transformative Agenda.
UNFPA-UNICEF Joint Programme on Female Genital Mutilation/Cutting: Accelerating Change Management Response and Key Actions.
Assessments. Assessment in the Project Cycle DESIGN IMPLEMENTATION MONITORING EVALUATION ASSESSMENT.
A UNHCR Perspective on IDP Profiling Interagency Workshop Brussels 22 – 23 March 2007.
McRAM Pakistan A Lesson in Assessment Preparedness.
Shelter Meeting 09b is hosted by UNHCR Safer Homes, Stronger Communities: Rebuilding After Disaster Update of “Safer Homes, Stronger Communities: Rebuilding.
Population Data and Disaster Preparedness UNFPA. Population and Development: Data in Humanitarian settings UNFPA is committed to providing reliable population.
IASC Needs Assessment Task Force IASC Needs Assessment Task Force NATF Training on Coordinated Assessments Revinge, Sweden October 28, 2010.
Food Security Cluster Inception Meeting, Rome May The Role of the FSC partners at the global level in supporting country response Tuesday.
Friday Information in Disasters Workshop Tanoa Plaza Hotel, Suva, Fiji June
12/12/2005 IASC IASC Principals Slide 1 Cluster Working Groups Progress Reports and Emerging Issues from the 63rd WG Meeting Yvette Stevens Chairperson,
What APEC Task Force for Emergency Preparedness (TFEP) has progressed in the implementation of HFA Presented by Vincent Liu Program Director APEC Secretariat.
4th Pacific Humanitarian Team Annual Meeting, October 2011, Suva, Fiji.
Core Cluster IM Products & Humanitarian Datasets IMWG Meeting 21 December 2015.
R ESPONDING TO MAJOR EMERGENCIES Is the system ready? Is UNICEF ready? REAs meeting Geneva 3 October 2012.
Flash Appeals NATF/ACAPS Training Revinge When is a Flash appeal issued? Part of the Consolidated Appeals Process, the FA is considered as the humanitarian.
IASC Task Force on Meeting Humanitarian Challenges in Urban Areas (MHCUA) Draft Strategic Framework TF meeting GVA Roger Zetter.
1.1.Recovery strategic planning capacities are strengthened. 1.2.Local capacity for ER planning and implementation strengthened in areas of expertise where.
17 OCT PHT MEETING – SUVA, FIJI Early Recovery Cluster Lead agency: UNDP.
Early Recovery and Resilience Bureau for Policy and Programme Support Livelihoods and Economic Recovery Group Leontine Specker DRC ER Resilience workshop.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
Common Needs Assessments Context: Sudden onset humanitarian emergencies: Can and should logistics play a stronger role in rapid assessments?
Cluster Coordinator for Early Recovery Training Review of Key Readings.
Assessments ASSESSMENTS. Assessments The Rationale and Purpose for Assessments.
Coordinated assessment Joint humanitarian assessment (JHA)
Wednesday, 9 May 15h00 – 17h00 (Geneva time)
Online Session 3.1: Planning for Needs Assessment and Analysis
Humanitarian Response Review (HRR) & IASC Emergency Shelter Working Group Process Graham Saunders, CRS, on behalf of Sphere/ICVA/SCHR/InterAction.
CCPM (Cluster coordination performance monitoring) results
Why Humanitarian Reform?
Information Management for Effective Emergency Response
Joint Inter-Agency Profiling Service
Online Session 2.1: Approaches, guidance and setting‐up coordination
Presentation transcript:

Global Development in Humanitarian Action Information Management Updates 1 4 th Pacific Humanitarian Team Annual Meeting October Holiday Inn, Suva, Fiji

Milestones Inter Agency Standing Committee: IASC Operational Guidance on Responsibilities of Cluster/Sector Leads and OCHA in Information Management IASC Guidelines on Common Operational Datasets (CODs) in Disaster Preparedness and Response IASC Operational Guidance for Coordinated Assessments in Humanitarian Crises Gender Marker is now mandatory for international humanitarian appeals UNFPA: Guidelines on Data Issues in Humanitarian Crisis Situations Volunteer and Technical Community: Formalization of the Standby Task Force USHAHIDI deployment in Libya, Syria, USA, (soon to come: Samoa) Disaster Relief 2.0 : The Future of Information Sharing in Emergencies Logistics Cluster: Global Mapping of Emergency Stockpiles 2

Operational Guidance on Responsibilities of Cluster/Sector Leads and OCHA in Information Management Important Extracts Cluster/Sector lead agencies shall allocate the necessary human and financial resources for IM. Cluster/Sector Leads: Should ensure all information is age and sex disaggregated where appropriate. Are responsible for generating and sharing up-to-date cluster specific information to support inter-cluster coordination. If needed, are responsible for establishing a data confidentiality and privacy policy within their cluster, which ensures that sensitive, personally identifiable datasets are suitably anonymized. Shall appoint an IM focal point, who should have sufficient expertise and an ability to work with different partners. Cluster/Sector IM focal points: Should contribute to inter-cluster IM coordination Are responsible for ensuring adherence to IM norms, policies and standards. Will work with OCHA to establish the systems and processes needed for effective information sharing with cluster partners. Humanitarian partners are encouraged to share IM resources and capacities within and across clusters at the country level where appropriate to promote harmonization and economies of scale. 3

IASC Guidelines on Common Operational Datasets (CODs) in Disaster Preparedness and Response Common operational datasets are predictable, core sets of data needed to support operations and decision-making for all actors in a humanitarian response. 4 DatasetMandatory Data Characteristics Humanitarian Profile (disaggregated by admin level and populated place) -Internally Displaced -Non-displaced affected -Host family/resident community affected -Refugee -Dead -Injured -Missing Population Statistics -Total population by admin level (Individuals) -Total population by admin level (Number of Households) –- - Age -Sex -Average family size by admin level -Unique identifier Administrative Boundaries (Geographic) admin level 1, 2, 3, 4 -Unique identifier (P-Code) -Name Populated Places (Geographic) -Unique identifier (P-Code) -Names -Size classification -Population statistics -Status if capital of administrative division -Type (Village, spontaneous settlement, collective center, planned settlement)

IASC Guidelines on Common Operational Datasets (CODs) in Disaster Preparedness and Response 5 DatasetMandatory Data Characteristics Transportation Network (Geographic) -Roads (Classified by size) -Railways -Airports/helipads -Seaports Hydrology (Geographic) -Rivers (Classified by size) -Water bodies Hypsography (Geographic) -Elevation -Resolution

6

HPN (Humanitarian Partnership Network) Common Needs Assessments and Humanitarian Action 7

IASC (Inter-Agency Standing Committee) Operational Guidance for Coordinated Assessments in Humanitarian Crises 8

Promotes a 7 step approach Recommended Steps for Joint Assessments 1.Form a ‘joint assessment working group’ with suggested Terms Of Reference, including analysis of cross cutting issues 2.Use a consistent set of agreed sectoral indicators 3.Use a consistent set of common operational datasets 4.Ensure clarity in timing and coverage of assessments 5.Establish a process for aggregating assessments over time 6.Establish a process for conducting a shared analysis of data. 7.Generate a joint understanding of the situation, the issues and the main priorities 9

A continuous process over time, in 5 phases 0) Preparedness : identification of the Assessment Working Group, identify key sectoral indicators affected by disasters, their baselines and best possible way of measuring them during the 5 assessment phases 1)Initial estimates of damage / needs / consequences : Preliminary Scenario Definition, based on existing information, and contextualized with baselines from phase 0 2)Multi-Cluster Initial Rapid Assessment (MIRA) : Highlights priority actions, identifies focus for follow up, establishes a post-disaster baseline for key indicators 3)In-depth Assessments : analyze the situation and trends, adjust and inform detailed planning, establish basis for performance monitoring and evaluation 4)In-depth Assessments : identify strategy towards recovery, performance monitoring, feed in Post Disaster Needs Analysis (PDNA) 10

11

12

UNFPA Guidelines on Data Issues in Humanitarian Crisis Situations 13

14 IASC (Inter-Agency Standing Committee) Gender Marker

15 Sex and Age Matter

16

17 Disaster Relief 2.0: The Future of Information Sharing in Humanitarian Emergencies

18

19

20

21

22