GridPP Status David Britton, 3/Sep/08.. 2 31/03/2014 Switching on the LHC The LHC was fully cold by mid August. This is being followed by continued powering.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Advertisements

Symantec 2010 Windows 7 Migration Global Results.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
London Tier2 Status O.van der Aa. Slide 2 LT 2 21/03/2007 London Tier2 Status Current Resource Status 7 GOC Sites using sge, pbs, pbspro –UCL: Central,
GridPP22 – Service Resilience and Disaster Planning David Britton, 1/Apr/09.
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
1 ALICE Grid Status David Evans The University of Birmingham GridPP 14 th Collaboration Meeting Birmingham 6-7 Sept 2005.
GridPP July 2003Stefan StonjekSlide 1 SAM middleware components Stefan Stonjek University of Oxford 7 th GridPP Meeting 02 nd July 2003 Oxford.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Oversight Committee Meeting.
S.L.LloydGrid Steering Committee 8 March 2002 Slide 1 Status of GridPP Overview Financial Summary Recruitment Status EU DataGrid UK Grid Status GridPP.
Deployment metrics and planning (aka Potentially the most boring talk this week) GridPP16 Jeremy Coles 27 th June 2006.
GridPP4 – Revised Plan Implementing the PPAN recommendations.
1 ALICE Grid Status David Evans The University of Birmingham GridPP 16 th Collaboration Meeting QMUL June 2006.
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
Storage Review David Britton,21/Nov/ /03/2014 One Year Ago Time Line Apr-09 Jan-09 Oct-08 Jul-08 Apr-08 Jan-08 Oct-07 OC Data? Oversight.
Southgrid Status Pete Gronbech: 21 st March 2007 GridPP 18 Glasgow.
LondonGrid Site Status and Resilience Issues Duncan Rand GridPP22.
Project Status David Britton,15/Dec/ Outline Programmatic Review Outcome CCRC08 LHC Schedule Changes Service Resilience CASTOR Current Status Project.
RAL Tier1 Operations Andrew Sansum 18 th April 2012.
RAL Tier1: 2001 to 2011 James Thorne GridPP th August 2007.
Partner Logo Tier1/A and Tier2 in GridPP2 John Gordon GridPP6 31 January 2003.
B A B AR and the GRID Roger Barlow for Fergus Wilson GridPP 13 5 th July 2005, Durham.
LondonGrid Status Duncan Rand. Slide 2 GridPP 21 Swansea LondonGrid Status LondonGrid Five Universities with seven GOC sites –Brunel University –Imperial.
S.L.LloydGridPP Collaboration Meeting IC Sept 2002Slide 1 Introduction Welcome to the 5 th GridPP Collaboration Meeting Steve Lloyd, Chair of GridPP.
GridPP4 Project Management Pete Gronbech April 2012 GridPP28 Manchester.
Slide 1 of 24 Steve Lloyd NW Grid Seminar - 11 May 2006 GridPP and the Grid for Particle Physics Steve Lloyd Queen Mary, University of London NW Grid Seminar.
GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Oversight Committee Meeting.
UK Agency for the support of: High Energy Physics - the nature of matter and mass Particle Astrophysics - laws from natural phenomena Astronomy - the.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP24 Collaboration Meeting.
Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
ZMQS ZMQS
/1 Transparency Challenge Panel March / Welcome & Introductions Suzanne Wise Strategy Consultation Overview of responses and next steps.
VOORBLAD.
GridPP From Prototype to Production David Britton 21/Sep/06 1.Context – Introduction to GridPP 2.Performance of the GridPP/EGEE/wLCG Grid 3.Some Successes.
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
Addition 1’s to 20.
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
Provincial Budget Analysis Intergovernmental Relations
S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
London Tier 2 Status Report GridPP 13, Durham, 4 th July 2005 Owen Maroney, David Colling.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Vendor Day 30 th April.
Southgrid Status Report Pete Gronbech: February 2005 GridPP 12 - Brunel.
GridPP Status Report David Britton, 15/Sep/09. 2 Introduction Since the last Oversight: The UK has continued to be a major contributor to wLCG A focus.
GridPP23 – Final Steps to Data David Britton, 8/Sep/09.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
1 st EGEE Conference – April UK and Ireland Partner Dave Kant Deputy ROC Manager.
GridPP3 project status Sarah Pearce 14 April 2010 GridPP24 RHUL.
Project Management Sarah Pearce 3 September GridPP21.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
11 March 2008 GridPP20 Collaboration meeting David Britton - University of Glasgow GridPP Status GridPP20 Collaboration Meeting, Dublin David Britton,
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
GridPP3 project status Sarah Pearce 24 April 2010 GridPP25 Ambleside.
CERN IT Department CH-1211 Genève 23 Switzerland t Frédéric Hemmer IT Department Head - CERN 23 rd August 2010 Status of LHC Computing from.
Tier-1 Andrew Sansum Deployment Board 12 July 2007.
J Jensen/J Gordon RAL Storage Storage at RAL Service Challenge Meeting 27 Jan 2005.
Slide § David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP delivering The UK Grid.
UK Status and Plans Catalin Condurache – STFC RAL ALICE Tier-1/Tier-2 Workshop University of Torino, February 2015.
Presentation transcript:

GridPP Status David Britton, 3/Sep/08.

2 31/03/2014 Switching on the LHC The LHC was fully cold by mid August. This is being followed by continued powering tests, consolidation and machine checkout in preparation for beam. Two short injection tests took place 9/10 August and 23/34 August. During the 2 nd of these tests, Low intensity pilot bunches were injected at point 8, through LHCb, sector 78 and to the collimators at point 7. It all went very well! Remarkable performance from a huge number of systems. The third test is planned for 5th - 8th September during which beam will be taken from point 8 to the beam dump at point 6, and a the same time perform a dry run of the totality of the LHC in preparation for the start of beam commissioning proper on the 10th Sep.

3 Switching on the Experiments 31/03/2014

4 Switching on the Grid 31/03/2014 CCRC08 in March and May

5 CCRC08 Conclusions (Jamie Shiers) 31/03/2014

6 WLCG Growth 31/03/2014 March 2008September 2008

7 GridMap 31/03/2014 Most sites appear to be "ready" for September with storage tokens in place and reasonable SAM test availability. However, GridMap continues to show many sites as degraded. RAL-LCG2 (Tier-1) due to CASTOR; QMUL has a clock problem (also bringing a SToRM instance online); ECDF unknown; Brunel's cluster is undergoing maintenance ; IC-HEP failed over the weekend possibly due to network outage (manpower shortage); Bristol (CMS filled storage) and BHAM network related problems. Other sites with recent problems include RHUL as a disk pool failed, Oxford after a torque server directory filled up, Lancaster after certificate problems. Glasgow saw problems with its CE overnight which required a globus-gatekeeper restart.

8 UK Contribution 31/03/2014 UKI 2006: 27% 2007: 18% 2008: 15%? UKI

9 Tier Centre Contributions 31/03/2014 London NorthGrid ScotGrid Tier1 SouthGrid GridIreland LondonNorthGrid ScotGrid Tier1 SouthGrid GridIreland 2007 NorthGrid: 34% London: 28% ScotGrid: 18% Tier-1: 13% SouthGrid: 7%

10 Storage (doh!) 31/03/2014

11 CPU (in)efficiency 31/03/2014

12 Availability and Reliability 31/03/2014 Last 6 months: RAL Reliability = 97% Target reliability for best 8 sites raised From 95% to 97% in June July-08: RAL Reliability = 99% (Target 97%) July-08: RAL Availability = 98% (Target 97%)

13 UK Reliability (Steves Tests) 31/03/2014

14 Outcome of Funding Crisis As anticipated at the time of GridPP20, the programmatic review recommended a 5% cut to GridPP: 31/03/2014 Although ALICE and LHCb ultimately rescued, the cut was still imposed. However, there was a silver lining:

15 Funding Cut Bottom line was that GridPP had to return £1.2m which was achieved by: –Planned and unplanned late starts to a number of GridPP3 posts. –Reduction in Tier-1 hardware to reflect changes imposed by the programmatic review (LHCb and BaBar). –Recosting of hardware based on the 2007 procurement. –A reduction in the budget line for the second tranche of Tier-2 hardware, consistent with the reduction in Tier-1 hardware. –Reduction in travel and miscellaneous spending. 31/03/2014

16 Tier-1 Hardware The FY2007 hardware procurement was brought in to production at the end of April: –182 Disk servers added 1439 TB of disk to the existing 922 TB –113 CPU systems added 3000 KSI2K to the existing 1450 KSI2K –3030 tapes (0.45TB each) were added to the existing ~4000. –12 T10K Tape drives added to the existing 3 (TK10) + 6(9940). This was a major increase in hardware in preparation for data FY2008 hardware procurement is now well underway (£2m). 31/03/2014

17 Current Issues: Castor At the last Oversight Committee meeting in Oct 2007 CASTOR was a flagged as a key concern. Subsequently, various deployments of CASTOR culminating in version 2.1.6, deployed as separate instances for each experiment, established a successful service for CCRC08. Unfortunately, various issues and missing functionality required one further upgrade to Although this was tested, once deployed it fails under heavy load. Unfortunately, it is a different subversion than CERN (due to site differences). Unfortunately, it is not possible to roll-back to Fortunately, the problem is only a corruption of requests and not of files. CASTOR team has worked extremely hard and this is an undeserved bookend to mark 12 months of work! 31/03/2014

18 Current Issues: CA Another current issue is the Certificate Authority. Spun-off from GridPP to NGS a few years ago, we have come to rely on this service. A Series of Unfortunate Events beset the CA, including the loss of a copy of the root certificate private key and then the Debian security problem which required a new root key. The NGS has responded decisively and have implemented management changes designed to try head off future unfortunate events, or handle them with greater agility. This is a timely move to try and ensure the highest level of service, which GridPP welcomes and thanks the NGS. GridPP should take note – we need to ensure all are services aspire to the highest levels. 31/03/2014

19 The Three Rs Reduce, Re-use, and Recycle (motto for the 21 st Century?) Robust, Resilient and Reliable (motto for Grid Services?) 31/03/2014 Robust: Strongly built or constructed. Resilient: Able to deal readily with unexpected difficulties. Reliable: To be certain of it working as expected.....well, if I were going there, I wouldnt start from here...

20 The Elephant in the Room Our tidy little world of expert users running well honed production jobs on tidy data sets is about to be trampled under foot. We must anticipate working with a large number of less expert users, who are likely to want to run a more diverse range of applications in a whole variety of ways. 31/03/2014

21 Red Button Day September 10 th is the official LHC start. All day Radio-4 coverage Events in Westminster and the Scottish Parliament. Anticipate local interest (and ensure your site is visible!) 31/03/2014

22 The end: The Beginning After 7 years of preparation, this is the moment weve been working towards. There are challenges ahead. Some things will go wrong. Communication is vital. 31/03/2014