1 Project Management Sarah Pearce 3 September GridPP21

2 2 GridPP21 Swansea 2/9/08 Reporting – GridPP2

3 3 GridPP21 Swansea 2/9/08 Reporting – GridPP3 metrics

4 4 GridPP21 Swansea 2/9/08 Reporting – GridPP3 milestones

5 5 GridPP21 Swansea 2/9/08 Reporting – GridPP3 manpower

6 6 GridPP21 Swansea 2/9/08 GridPP 3 reporting - narrative

7 7 GridPP21 Swansea 2/9/08 GridPP3 reporting – Tier2s

8 8 GridPP21 Swansea 2/9/08 Project Map GridPP2

9 9 GridPP21 Swansea 2/9/08 Project Map GridPP3

10 10 GridPP21 Swansea 2/9/08 Experiments red metrics ATLAS 1.1.4 – Tier 1- Job success rate in batch system 1.1.8 - Tier 1 - Data availability in storage system. 1.1.12 - Tier 2 - Data acceptance from Tier 1 1.1.15 - Tier 2 - Job success rates in batch system LHCb 1.2.2 - MC production (generation) efficiency 1.2.11 - LHCb SAM tests uptime T1 CMS 1.3.6 - Time between Data arriving at RAL and being processed 1.3.13 - Failed analysis jobs 1.3.15 - Provide an appropriate level of resources to CMS Other experiments 1.4.3 - % of jobs reported by any experiment as failing due to Grid (MINOS – 45%)

11 11 GridPP21 Swansea 2/9/08 Grid services Operations red metrics 2.1.1 - Fraction of UK sites in Production (UCL) 2.1.3 - Proportion of available jobslots used 2.1.10 - GridPP deployment web-pages up-to- date 2.1.13 - Number of sites on VO blacklists Network red metrics 2.3.5 - Maintenance of Gridmon nodes and associated software Data and storage orange metrics 2.4.1 - Correctly defined space tokens as per experiments' requirements

12 12 GridPP21 Swansea 2/9/08 Tier-1 Front end systems – red metrics 3.1.5 - Availability of LHCb, ALICE and CMS VO boxes Resource delivery – red metrics/ milestones 3.2.9 - % met of normalised UB allocation for CPU 3.2.10 - Job Efficiency (CPU/Wall) 3.2.11 - Farm Occupancy 3.2.12 - Percentage of GRIDPP3 Staff in Post 3.2.16 - Disaster and Business Continuity Plan Available 3.2.21 - Recruitment of additional GridPP3 posts complete Storage systems – red metrics 3.3.4 - % met of UB Allocation for Disk 3.4.8 - CASTOR SAM tests: LHC VOs

13 13 GridPP21 Swansea 2/9/08 Tier-2s Red/orange metrics 4.x.1 - % of promised disk available to GridPP (red for ScotGrid 49% and NorthGrid 86%) 4.x.3 - Average SAM (SLL page) availability performance over the last quarter (70-93%, all Tier-2s) 4.x.4 - Average SAM (SLL page) reliability performance over the last quarter (81-93%, all Tier2-s) 4.x.5 – Average SLL untargeted ATLAS test performance (UK test) (86-94%, all Tier-2s) 4.x.6 - Average SLL SE test performance (70%) 4.x.7/8 - CPU utilisation (wall clock time/ CPU time) (London, SouthGrid and NorthGrid, 23-45%) 4.x.9 - % of disk used (21-39%, all Tier-2s) 4.x.10 – number of technical meetings held (ScotGrid, NorthGrid) 4.x.11 – number of management meetings held (London, SouthGrid)

14 14 GridPP21 Swansea 2/9/08 Management and external Project execution 5.2.1 – GridPP staff in post 5.2.4 - 100% of quarterly reports received by Project Manager within 2 months of quarter end Outreach Number of GridPP publications

15 15 GridPP21 Swansea 2/9/08 ProjectMap figures

16 16 GridPP21 Swansea 2/9/08 Next steps Finalise Q2 (April – June) quarterly reports and ProjectMap Revise quarterly report template and some metrics Q3 quarterly reports –Request at start of October –First version middle of October –Final version end of October Oversight Committee?

17 17 GridPP21 Swansea 2/9/08 Conclusion