Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS 1543164.

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Space reservation and crane limitations linked to refrigeration cold box in TX46 13th HL-LHC Parameter and Layout Committee Meeting C. Bertone, S. Claudet,
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Construction and Installation of the CLIC Experimental Area
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Transport and handling at CERN for FAIR
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
Additional Lift to Access ECA5 Etienne Carlier, Jean-Louis Grenard, Damien Lafarge SPS Dump Upgrade Meeting 09/07/2015.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Transport and Handling (T&H) considerations for HL-LHC
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
Essential Consolidation Items for LIU-PSB Collection from LIU-PSB WP holders.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
PSB Reference Magnet (for the 2.0 GeV upgrade) A.Newborough 16 th October 2014.
PSB DUMP REPLACEMENT: STRATEGY & STATUS LIU-PSB Meeting 90 A. Sarrió, F. Loprete, A. Perillo-Marcone 22 th November 2012 LIU-PSB.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
MSC Technical Meeting 29 August 2013 Overheated QBBI.A21L6 F. Savary with contributions from N. Dalexandro, H. Prin, C. Scheuerlein, P. Voisin.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Decommissioning of CTF3 Nothing has been studied on the cost, manpower needed, environmental impact (RP) etc. This is just to raise some points that may.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
YETS & LS2 Works EN-EL / Power distribution
Linac4-PSB 160 MeV connection readiness review
CLIC Handling Engineering Update
East Hall under construction
AD consolidation activities in LS2
EN/HE activities for LIU
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Renovation of the 45-year old PS magnets
EHN1 Neutrino Installation Plans
SPS activities during LS2 TE-EPC (Power Converter Group)
EN-HE L2 – PS – PSB – TT2 works during YETS
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
Proposal for the modification of building 151 in view of the LS2 PS main magnet and TT2 consolidaiton projects Dominique Bodart TE-MSC-MNC 29/09/2017.
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Experimental Areas – LS2 planning
Presentation transcript:

Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS

Topics Handling of extraction line magnets (oversize) Handling of Injection and Transfer lines magnets (standard) Spreader for triplets Handling of reference magnet Consolidation of handling equipment in PSB

overview of the magnets BHZ10 TBH BTY.BVT

Actual magnets: BTM.BHZ10 BTM.BHZ10: actual weight is 18t: cannot be removed as such (underground crane 10t). Operational spare exists. Possibilities: Develop a special structure to unload this down (and strengthen the transfer table to bring it down the shaft) Bring it in a safe area at the same level and cut it in pieces

Replacement of BHZ10 It will weight 17t but it is foreseen to be composed by 2 halves of <9t each. It will be possible to assemble to 2 parts with the crane beside his final position and then transfer to destination. Some tooling is needed It is possible to change the coils in situ if breakdown, A. Newborough agreed that nothing heavier could potentially fail so to require the replacement of it. To work on coils, the magnet can be moved into the corridor to work on it

Actual magnets: TBH TBH: actual weight is 7,8t: can be extracted with the same technique that has been used to install it there, but some light tooling is needed to remove it from the concrete block

Replacement of TBH A new optimised design is under study that would allow to keep the magnet mass ~8,5t. It could increase up to 9,7t. In any case, the crane could take up to 11t that looks coherent. Some tooling is needed.

Actual magnets: BTY.BVT101 BTY.BVT101: actual weight is 8,5t: can be extracted with the same technique that has been used to install it there. Replacement non foreseen at present stage. If needed, the new one >10t

Other magnets in injection and transfer lines Analysis of need under completion. All <10t Tooling is in house and some is needed (light)

Conclusion injection and transfer lines Under conditions that the BTY.BTV101 magnet does not need to be replaced (with a heavier one) RP gives the green light to move the actual BHZ10 into a quiet zone, cut this in pieces (projection protections will be put in place) and evacuated after by the existing handling means, Then there is no need to develop a special handling gantry with increased capacity (up to 20t) and upgrade the transfer tables (20t each instead of 10t, actual). The study of the gantry is then in stand-by up something will change.

Handling tool for spreader Old spreader has been repaired and is ready New one is upon ordering and will be delivered in 2 months

Already presented on 4/12/2015 (LIU-PSB n. 139) Not possible to rapidly remove the present magnet (false floor insufficiently dimensioned and full of cables) Works locally on the magnet are possible (acting on coils for example) but need deeper studies to be confirmed Handling od reference magnet

Consolidation of handling machines in PSB Surface crane has been replaced: working status. Installation of the underground infrared receptor is foreseen in YETS Transfer tables are under consolidation: first will be renewed now and reinstalled in YETS , second will be renewed during same YETS Underground cranes on ring (3 identical): electrical consolidation finished during LS1 Underground crane on TL: replaced during LS1 New crane for b. 245: installed December 2015  the handling equipment for PBS will be completely new or renovated by February 2016

Conclusions After discussion with A. Newborough, the provision of a system to remove and reinstall a BTM.BHZ10 or similar magnet in TL is not necessary anymore since the old one can be cut in pieces and removed while the new one has a modular design to allow lighter parts. In case of rapid intervention during run (failure), the heaviest parts that risk to fails are the coils and A.N. confirmed that they can be replaced in place with the help of transport. The gantry would not be a proper solution in this case since his installation in situ takes 2-3 weeks Triplet old spreader is ready (in case of urgency) and new one is being ordered All HE machine park will be new or completely refurbished by February 2016