UNIVERSITY OF NAIROBI PHYSICAL RESOURCES. 1. Land University of Nairobi owns 118 parcels both on leasehold and freehold interest basis. Forty nine (49.

Slides:



Advertisements
Similar presentations
Achieving the MDGs: RBA Training Workshop Module 6: Urban Development Investment Cluster May 9-12, 2005.
Advertisements

UNDP RBA MDG-Based National Development Planning Workshop MDG-Based Urban Development Strategy Gonzalo Pizarro UN Millennium Project February 27-March.
Health Science Technology Building a Pipeline of Future Healthcare Workers South Carolina Department of Education Office of Career and Technology Education.
EMERGENCY PLANNING FOR LONG TERM CARE FACILITIES Joseph B. Phillips Director Division of Emergency Medical Services.
Construction Technologies. The study and application of building or assembling a structure. All people are affected in one way or another by construction.
INSPECTION OF RISK AND ANALYSIS OF INSPECTION REPORT A PRACTICAL APPROACH PRESENTED BY AJAY K. JAIN.
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
RELIABLE SUPPLIERS Supply Chain Management and Procurement policies in place Supply Chain Management and Procurement policies in place Register all suppliers.
Utility Management Providence Health System - Oregon Environment of Care.
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Fleet Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental.
FIRST REFERRAL UNIT.
LUGULU HOSPITAL A VIRTUAL TOUR APRIL PURPOSE THE GOAL OF THIS SLIDE SHOW IS TO GIVE YOU A VISUAL PRESENTATION OF LUGULU HOSPITAL AFTER A VISIT/TOUR.
Mine Construction. Start of Barge Landing area. A trailer, excavator and generator. Early Barge Landing June 2007 with one trailer to start construction.
Click here to go back to the beginning Click here to go back a slide. Click here to go to the next slide. Now move onto the next slide. Welcome to SU training.
Facilities and Infrastructure December 10, Barletta Construction: Parent Organization In 1914, Vincenzo Barletta, a recent immigrant from Italy,
Customer Service Training Program Presented by the Excellence in Customer Service Task Force Plant Operations Office of Student Affairs
Health and Safety Information Turitea and Hokowhitu Campuses, Manawatu.
Contractor Induction Program Gippsland Southern Health Service is committed to a safe and healthy work environment.
Capital RAC NC RACs: An EM Partner in Disaster Response Dale Hill, EMT-P CapRAC Coordinator Manager, Emergency Services Institute WakeMed Health & Hospitals.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
2004 SUMMER UNIVERSITY WELCOME !. AGENDA Overview Granger Center Tour Central Heating & Power Plant Tour Grounds Tour Optional - General Services Bldg.
FIRE DEPARTMENT ORGANIZATION State of Georgia BASIC FIRE FIGHTER TRAINING COURSE.
City of Lynden Ambulance Utility Cost of Service and Rate Study Fire Chief Gary Baar Presented by.
University of Architecture, Civil Engineering and Geodesy Faculty of Hudrotechnics Speciality: Hydraulic Engineering (German language teaching course)
Engineering and Technical Plans Description, process and standards Dh 2005.
Civil engineering branches & scopes
Welcome to College of Engineering February 2015 Health and Safety Briefing.
Property Risks – The Surveyor’s Perspective Stuart Blackie UK Risk Engineering - Property Snakes & Ladders Managing Risk in Higher Education 23 April 2008.
Luxury Homes FROM separate entry exits D L F B A Y V I E W.
Fact Training - Water and Sanitation, Geneva April ‘meeting basic water and sanitation (WatSan) needs in post-disaster situations is crucial to.
(CAREC) PAHO/WHO Serving 21 Member Countries in the English and Dutch Speaking Caribbean Preparations for the Next Pandemic (or Epidemic or Outbreak) Leslie.
HRSA SURGE CAPACITY DATA SURVEY TECHNICAL ASSISTANCE California Department of Health Services Emergency Preparedness Office.
Northern Sunrise County Overview August 25, 2015.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
Presentation of workshops on environmental sanitation for the 6th year semester.
Financial Issues in Solid Waste Management Expenditures -capital investment -operational investment Revenues.
 Net Student Revenues  2384 undergraduate students  Comprehensive Fee - $57,900  90% receive institutional aid –average aid $25,300.
The Future of Sludge Disposal: A Fresh Perspective after Sandy Jim Meehan – Executive Director Rahway Valley Sewerage Authority.
Sustainable Development “Meeting needs of the present without compromising the ability of future generations to meet their needs.” World Commission on.
Presentation to the California Recreation Resource Advisory Council (RRAC) November 5, 2007 Roxie C. Trost –Field Manager.
21 st Sep Election Process July & August
Business Operations Semi-Annual Meeting Presentation: West Campus Janet Lindner Associate Vice President for Administration November 15, 2007.
Achieving the MDGs: RBA Training Workshop Module 5: Rural Development Investment Cluster 9-12 May 2005.
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
Easter Bush Update December The New Teaching Building 12,500 square meters on three floor providing accommodation for up to 850 students and 200.
PRESENTATION ON REAL ESTATE PORTFOLIO OF THE UNIVERSITY OF NAIROBI PRESENTER: T.M.THUITA ESTATES MANAGER University of Nairobi ISO 9001: Certified.
AIA Guidelines for Design and Construction of Hospital and Healthcare Facilities Presented By: Michael A. Rogers, PE
N.P.D.E.S. PHASE II Virginia Beach. Local Condition AREA 312 SQUARE MILES CHESAPEAKE BAY 98 SQUARE MILES WATERSHED SOUTHERN 209 SQUARE MILES WATERSHED.
Bangalore Medical College Bangalore Medical College, now renamed Bangalore Medical College and Research Institute, popularly known as BMC, is a medical.
The city of the future Kotova Olga Form 11b School # 62 Lipetsk 2011 – 2012 school year.
Dr. Soren Otieno MBChB., Mmed Ortho Medical Superintendent National Spinal injury Hospital.
EveNT PRODUCTION: Operations, Equipment, Facilities, Health & Safety
MAPPING OF VULNERABILITIES AND COPING MECHANISMS. PRESENTED BY: SADIQUE BILAL –SPORTS OFFICER KI ELIZABETH -INTERN STUDENT UNIVERSITY OF NAIROBI Copyright.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
EXPO – 2017 ASTANA Malika Bekturova population is ASTANA INFO PEOPLE total area is HECTARS average temperature (in summer) - 25C (77F) ASTANA.
Reuben E. Lee Restaurant (now removed) Island Prime Restaurant.
PAS Project 1 Performance Measurement For water and sanitation- indicators CEPT UNIVERSITY.
September 11, 2012 Water Resources Statistics of the Republic of Kazakhstan A. Yepbayeva, Director of Production Statistics and Environment Department.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Planning and Implementation of Sewerage Schemes. Sewerage The waste water collection, transportation through conveyance & Disposal system.
Explore Alaska’s physical environment and specific health and safety issues. Use AKCIS to explore healthcare careers in Alaska. Design products or processes.
Ian Bell Tyne and Wear Fire and Rescue Service
Master Plan of School of Health Science
uacn property development company plc
City of Lynden Ambulance Utility Cost of Service and Rate Study
Strategic Budget & Planning Council Capital Improvements Plan
FEE INCREASES Public Work Shop June 2, 2018.
Continuing challenges regarding previous “findings” :
Presentation transcript:

UNIVERSITY OF NAIROBI PHYSICAL RESOURCES

1. Land University of Nairobi owns 118 parcels both on leasehold and freehold interest basis. Forty nine (49 No) parcels for academic/research user Sixty nine (69No) residential user. Total acreage 13,425 acres, 13,316 acres academic/research, 109 acres residential. The University owns adequate land for current and future expansion. Compounds are landscaped with well laid ground lawns ornamented trees and storm water drain tunnels.

2. Buildings Constructed/development on the above parcels are over 400 buildings used for teaching and research facilities, accommodation for both students and members of staff. The buildings are located in various Campuses situated in several counties within the country. Teaching and learning facilities measures 105,801 sqm, while the office space is 36,398 sqm. To increase available space for teaching facilities, office accommodation the University is constructing a tower in Kisumu Campus and University Towers in the Main Campus. The University has 85 hostels and axially facilities for accommodation of students.

Teaching and Learning Rooms Lecture Theatres:306 Science Labs: 213 Computer Labs: 80 Workshops: 31 Studios: 13 Seminar Rooms: 47 Etc.

3. Transport The University owns a fleet of motor vehicles to support academic/research, administrative and assentials. Has 187 serviceable motor vehicles and 12 motorbikes.

4. Plant and Capital Equipment University has various teaching and research equipment in its laboratories and workshops. University has fully equipped printing presses.

5.Fire Safety Preparedness University is adequately and appropriately prepared for fire emergency. Provision of fire fighting equipment which are regularly serviced. Sensitization of members of staff Fire assembly points clearly marked in all colleges. Provision of first aid kits in all buildings.

6. Utility Services I. Water Water is supplied from conventional water supply companies. On average the University pays a monthly bill of Kshs. 7 million. Water for irrigation and Kibwezi is pumped from dams and Kibwezi River respectively. To supplement the supply from the above sources, the University has sunk boreholes 16 No with daily output of m³. University has water storage capacity of m³.

II. Sewerage and Waste Water Disposal Systems Waste water is by trunk sewer for campuses connected to main sewer and septic tanks and sewerage treatment ponds to the rest.

III. Power Electricity supply is from the main national grid. Back-up supply from 25 generators located in all Campus.

7. Health Services University has a 24 hour medical service to both members of staff and students. Has 11 Clinics located in all Campuses including those outside Nairobi County. Has a modern fully equipped surgical theatre, a sick bay, specialized clinics including counseling services, laboratory and wait pharmacy. Ambulance services are available in all campuses. For specialized services not available patients are refereed to Kenya National Hospital and private hospitals.

8. Access Roads All access roads to University premises are tarmac/cabro paved driveways, with cabro paved walkways and parking spaces.