DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.

Slides:



Advertisements
Similar presentations
Planning and Development Committee West Corridor Update May 10, 2007.
Advertisements

Metrolinx is an agency of the Government of Ontario Planning, Design and Engineering (PDE) Workplan February 20, 2009.
SEE-ERA.NET PLUS Joint Call Final Results + Planning Follow-up Martin Felix Gajdusek, Centre for Social Innovation – ZSI, Austria Meeting of the Steering.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
1 Fairfax County Base Realignment and Closure Mark Canale Fairfax County BRAC Coordinator April 5, 2011.
I-95/Route 630 Interchange, Alternative E FUNDING (Cumulative) SCHEDULE JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 JULY 2007.
The Implementation Structure DG AGRI, October 2005
XV-RA V/Doc. 5.2(2) Expected Result: 11 EFFECTIVE AND EFFICIENT MANAGEMENT PERFORMANCE AND OVERSIGHT OF THE ORGANIZATION Strategic Plan for the Enhancement.
Status Report on Administrative Response to December 11, 2006 Alleghany Co. School Board Resolution on Alleghany High School Presented by Dr. Robert P.
April 19, 2012 SBE Presentation on Performance Evaluations.
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
September 18, 2008 I-35 South Environmental Assessment North End of I-35 SH 9W Interchange Ramps North to ½ Mile North of Main Street in Norman Public.
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee October 3, 2007 Workshop.
HOC-664 Hocking Hills Study Stakeholder Meeting August 15, 2008 Hocking Hills State Park.
MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
Fleurieu Regional Aquatic Centre Project summary October 2013 council meetings.
Overview of the Green Infrastructure Section of PWSAs Feasibility Study Presentation Charrette No. 3: April 19, 2013 Presenter: Ross Gordon, PE, CFM, LEED.
1 Item 11, Presentation to the TPB, September 15, 2010.
Planning Commission April 14, 2010
Green Building Ordinance Transportation and Environment Committee
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Great Western Corridor Feasibility Study
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
TRAC Request: Maintain Tier II Status Maintain $5 million for further investigation / Use toward ODOT portion TRAC Request: Maintain Tier II Status Maintain.
Name ____________________ Date ___________ Period ____.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
I-66 Corridor Improvements Outside the Beltway CTB Briefing
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
Environmental Assessment Public Meeting
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Designated by US DOT Publication of Draft PFN for Comments - Spring 2013 Initial Designation of the PFN – Fall 2013 National Freight Network Primary Freight.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
The PDP and Decision-Making
BOP Regional Walking & Cycling Strategy Implementation meeting 29 October 2009.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Developing a Purpose & Need Statement. Objectives  Understand when the P&N is developed in the PDP  Understand the importance of a well- written/well-justified.
Metro Highway Program Presentation to CMAA Abdollah Ansari
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Visit Our Website at: Click to edit Master title style.
Local Plan Options Parish Coffee Time Friday 31 July 2015.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
Alternative Alignments Public Meeting
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Public Workshop #1 August 18, 2010.
Issaquah-Fall City Road
Revised engagement approach for draft GTAC
White Flint North Entrance Feasibility Study
I Street Bridge Replacement Project
Presentation transcript:

DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager Wednesday, March 23, 2011

Project History ms consultants begin initial Safety Study and Design - Fall 2001 Existing Interchange Studies by Gresham Smith & Partners – 2004 Safety Studies by LJB Inc. - 2004 – 2006 Traffic Impact Study submitted by Northstar - 2005 Wilson Road Constructed – 2006 Permit to Connect Wilson Road to US 36/SR 37 – Sept. 2006 Public Meeting held for Safety Project – Sept. 2007

Project History Short Term Solution - No Build Condition for the Long Term Interchange Project Construction Cost Estimate (Stage 2) - $4.33M

Project History Early Meetings with Developers on Interchange – August 2008 Connective Roadway Network Established – October 2008 Traffic Modeling & Certified Traffic Developed – Dec. 2008 – Aug. 2009 Feasibility Studies Provided by Each Developer – 2009/2010 2009 TRAC Application Submission – November 2009 Combined Feasibility Study – June 2010 Updated Certified Traffic – August 2010 2010 TRAC Application Request – August 2010 Additional Modeling Completed – October 2010 & March 2011 Safety Project Construction (No Build Condition) – Summer 2012

Interchange Project Area

Transportation Review Advisory Council (TRAC) DEL-71 project part of the 2011-2015 Draft list Tier II Status $5M toward Preliminary Engineering Final List to be provided by April 2011 Schedule/Funding Current Construction Schedule: Unknown until a preferred alternative is determined Order of Magnitude estimate by EMH&T and ms consultants *Includes right of way to be donated. Interchange – Possible Future TRAC Request - % To Be Determined Local Road Network – Funded by Local/Developer Partnership   TRAC Request (PE) Detailed Design Right of Way* Construction Interchange $5 M $4 M $1 M $40-50 M Local Road Network $22 M $40-60 M Total $8 M $23 M $80-110 M

Task Order/NEPA Office of Environmental Services (OES) created task order with LJB Inc. Develop a Purpose and Need Statement Determine Logical Termini Create the Existing and Future Conditions Report Portions of the above Information submitted; Task Order not finalized NEPA process determines the Preferred Alternative as the project fits the Purpose and Need Statement

Project Development Process (PDP) New PDP designed to help projects like this move faster into Construction. PDP will focus on established criteria for narrowing alternatives quicker. PDP works to ensure design is completed concurrent with detailed NEPA work.

ODOT’s PDP

ODOT’s PDP- Next Steps Develop Concepts/Alternatives Evaluate options to criteria (impacts, P&N, ROW, Utilities, cost, etc.) Public/Stakeholder involvement. Conduct Detailed NEPA studies/design. IMS/IJS study part of above work.

Interchange Modification Study (IMS) Process Interchange Feasibility Studies have examined access points on Interstate 71 both north and south of US 36/ SR 37. The studies also examined with and with out Big Walnut interchange as not to prevent it being part of the corridor in the future. IMS submitted by ms consultants on behalf of NorthGate Development for a Southern Concept Interchange – September 2010 Much of the work for the traffic analyses has been performed and can be used in future analyses. ODOT agrees the Southern Concept has merit but will not provide further review until the environmental process can identify a preferred alternative. The southern concept provides more traffic relief to the US 36/SR 37 corridor. The NEPA (PDP) process might find another viable solution or determine different termini for the project which will need to be evaluated.