Mu2e WGM 6/16/2010 R. Ray Mu2e Project manager. L2 Systems and Managers R. Ray - Mu2e WGM2 1.2 Accelerator M. Syphers FNAL 1.3 Conventional Construction.

Slides:



Advertisements
Similar presentations
Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
Advertisements

Mu2e WGM 2/22/2011 R. Ray Mu2e Project manager. CD-1 Our sole focus is on CD-1 and in particular, the Director’s Review scheduled for April 3-5. To be.
Mu2e WGM 4/21/2010 R. Ray Mu2e Project manager. Project Team We have a L2 manager for the tracker!  Aseet Mukherjee has assumed this role  Experience.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
Mu2e Project Overview Mu2e WGM R. Ray 3/17/ /17/ Mu2e WGM.
Beamline Takashi Kobayashi 1 Global Analysis Meeting Nov. 29, 2007.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Tracker Software MECO/Mu2e Experience Yury Kolomensky UC Berkeley/LBNL January 24, 2008.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Mu2e WGM 7/27/2011 R. Ray Mu2e Project manager. Director’s Review We have settled on date for the Director’s CD-1 Review; Oct Focus of review will.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Mu2e WGM 9/15/2010 R. Ray Mu2e Project manager. L2 Systems and Managers R. Ray - Mu2e WGM2 1.2 Accelerator S. Werkema FNAL 1.3 Conventional Construction.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
Mu2e Mu2e Status Andy Hocker, Technical Division All-Experimenters Meeting 8-JUN-2015.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
NOvA Project Status April 3, 2007 John Cooper Ron Ray Nancy Grossman.
NuMI Lessons Learned DOE Perspective Who am I? Steve Webster – a DOE Federal Project Director at the Fermi Site Office Role during NuMI – was the Deputy.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
7/26/2006 Wyatt Merritt 1 DECam Preparations for Critical Decision 2/3a Preparations for CD2 Preparations for CD3a DECam MOUs.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Mu2e Experiment and Issues Rick Coleman, Fermilab RESMM’12, February 2012.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Project Overview Ron Ray Mu2e Project Manager Fermilab Sept. 26, 2008 Preliminary Director’s Review of mu2e Fermilab.
Mu2e WGM 10/20/2010 R. Ray Mu2e Project manager. Why does the building have to go in the middle of a road? R. Ray - Mu2e WGM2.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Mu2e WGM R. Ray Mu2e Project Manager Sept. 14, 2012.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
Mu2e Cost and Schedule Ron Ray Mu2e Project manager Fermilab PAC Meeting November 3-4, 2008.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Work required to have a proposal in June (for discussion) RA, CPM, 15/4/03.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
The CMS Simulation Software Julia Yarba, Fermilab on behalf of CMS Collaboration 22 m long, 15 m in diameter Over a million geometrical volumes Many complex.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
M. Ellis - MICE Collaboration Meeting - Thursday 28th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
Giovanni Onorato Fermilab University of Rome “Guglielmo Marconi” INFN Lecce Mu2e general presentation.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Forward Tagger Simulations Implementation in GEMC Moller Shield Tracking Studies R. De Vita INFN –Genova Forward Tagger Meeting, CLAS12 Workshop, June.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
Eunil Won/Korea U1 A study of configuration for silicon based Intermediate Trackers (IT) July Eunil Won Korea University.
Mu2e Mu2e Backgrounds and Computing Robert Bernstein 5 March 2015 Mu2e-docdb 5223.
KA11 Contributions to Mu2e R. Ray Mu2e Project Manager 8/16/2010 1R. Ray.
MCS meeting 20/11/2015 S. Guiducci. Introduction Yesterday meeting has shown an interest in a large physics community to incremental development of muon.
Amelia Smith Anne Heavey Document Managers Jan. 28, 2010.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Mu2e Ron Ray Mu2e Project Manager Jan. 11, Scope of Mu2e Project R. Ray - Mu2e Overview 2 Design, construct, and install the Mu2e detector, modify.
Straw Tracker Crystal Calorimeter Stopping Target Robert K. Kutschke [1], Fermilab The Mu2e experiment at Fermilab is in the midst of its R&D and approval.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
Head, Office of Project Management Oversight (OPMO)
Roberto Calabrese Ferrara University and INFN
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Trigger, DAQ, & Online: Perspectives on Electronics
Preparations for a Lehman Review
SVT detector electronics
Presentation transcript:

Mu2e WGM 6/16/2010 R. Ray Mu2e Project manager

L2 Systems and Managers R. Ray - Mu2e WGM2 1.2 Accelerator M. Syphers FNAL 1.3 Conventional Construction T. Lackowski FNAL 1.4 Solenoids M. Lamm FNAL 1.5 Muon Channel S. Feher FNAL 1.6 Tracker A.Mukherjee FNAL 1.7 Calorimeter INFN 1.8 Cosmic Ray Veto C. Dukes UVa. 1.9 Trigger and DAQ M. Bowden FNAL 1.1 Project Management R. Ray FNAL Mark Bowden from CD added as new L2 Manager for Trigger/DAQ. Still working on Calorimeter.

Accelerator Update Continued progress on most fronts. Mike Syphers is leaving the Lab in about a month.  Critical that we identify a replacement before then so there can be some overlap. o Discussions ongoing. Pat Hurh has put us in touch with engineers from the high power target group at RAL.  They will be visiting next week to discuss possible contributions to LBNE and Mu2e  We are interested in having them work on the conceptual design of the production target, remote handling equipment and possible the heat shield. R. Ray - Mu2e WGM3

Solenoid Update Planning on a local review with some people outside of Mu2e at the end of June.  Chance to get some input on the direction we are heading. Planning on design review with world recognized magnet experts in late summer/early fall. Continued design progress on all fronts Working on detailed quench calculations to understand the impact of increasing resistance in aluminum stabilizer as the result of radiation damage.  May not be as bad as originally thought, but still a work in progress.  Need an adequate safety factor. R. Ray - Mu2e WGM4

Building Location Update R. Ray - Mu2e WGM5 We have chopped about 30 m off the length of the beamline. Length is driven by beam optics into extinction channel. Would still like to get East of Kautz Rd.

Simulations update Dave Brown from LBNL has adopted the SuperB fastsim Monte Carlo to Mu2e and has implemented the T-Tracker geometry. Dave has simulated the intrinsic resolution of the T-Tracker (energy loss and multiple scattering) and found it to be sufficient (~ 110 KeV).  Some cross checks still needed.  Pattern recognition errors and other more subtle effects can add non-Gaussian tails to the momentum function. These will be studied later with G4 and full pattern recognition and fitting algorithums. Not needed for CD-1. Looking to make this tool generally available.  Can use this to answer many questions related to the detector at the CD-1 level.  Buy us some time to get full hit level G4 simulation in place for CD-2. Still struggling with muon channel simulations  G4 implementation not ready  G4beamline (Muons Inc. product) not very flexible and author is busy on other things o Trying to buy some time from Muons Inc. R. Ray - Mu2e WGM6

Tracker Update After significant discussion at the Collaboration meeting we have settled on a baseline configuration for CD-1  T-Tracker (decided several months ago)  Electronics in vacuum. o Preamp, updated BaBar Elefant chip, TDC implemented in FPGA, ADC. o From MTBF for BaBar Elefant chip we estimate about one failure every 5 years. o Looking for data on FPGAs. o Will eventually assess our threshold for missing channels/ groups of channels with simulation. o Could decide to move electronics out of vacuum if electronics failure rate too high or tolerance to missing channels too low. R. Ray - Mu2e WGM7

DAQ Update Mark Bowden is now the L2 Manager. Our baseline concept is a streaming architecture that allows maximum flexibility while recording the same volume of data as in the standard triggered configuration.  Similar to other modern DAQ architectures o CMS, NOvA, NA62, LHCb R. Ray - Mu2e WGM8

Project Controls R. Ray - Mu2e WGM9 Our Project Controls person is no longer at the lab. He was not a very good fit for what we are doing at this stage of the process. We have 2 new people doing Project Controls for Mu2e  Larry Kirkpatrick  David Leeb Still getting up to speed. Reconstructing existing files. Will begin meeting with L2 managers by next week. Eventually will need 4 people doing Project Controls and EVMS  1 for Solenoids and Muon Beamline  1 for Accelerator  1 for Conventional Construction and Project Management  1 for Tracker, Calorimeter, CRV, DAQ A mix of permanent Fermilab employees and contractors

Project Controls LBNE has a req on the street for a Project Controls person to set up their overall system and to lay the groundwork for hiring in several more over the next year.  3 interviews scheduled.  I am on the interview team. If the 2d best person is good, I may consider hiring him/her to augment the existing staff. R. Ray - Mu2e WGM10

ES&H Working on Project Information Form (PIF) for ES&H. Will continue our discussion at IPT meeting tomorrow about the path to a CX for Mu2e.  PIF will be important input. Started work on Preliminary HA (required for CD-1).  I could use some help from someone with ES&H background.  Significant input needed from L2 managers about potential hazards associated with their systems. R. Ray - Mu2e WGM11

CDR Started writing CDR. LBNE has 2 technical writers working on their CDR. They could roll off in the Fall, so I may try to pick up some of their time to help with the Mu2e CDR. R. Ray - Mu2e WGM12

CD-1 R. Ray - Mu2e WGM13 Lehman CD-1 ReviewMarch 1, 2011 Director’s ReviewFeb. 1, 2011 CDR completeJan. 15, 2011 Final cost & schedule and associated documentation. Jan. 15, 2011 L2 CDR contributions submittedDec. 1, 2010 Director’s Design ReviewNov. 1, 2010 L2 Design ReviewsOctober, 2010 Time

Schedule R. Ray - Mu2e WGM14 CD-1CD-2/ 3a CD-3

Requirements R. Ray - Mu2e WGM15 At June Collaboration meeting we filled in the table.

Action Items Get L2 Manager for calorimeter in place – R. Ray  Still working on this. Get resources required for CD-1 activities into P6. Begin adding relationships and developing BOEs – L2s/Walter Davis  Still a work in progress Understand and document the magnitude of the heat shield problem – Coleman/Mokhov  Still looking at potential solutions. More optimistic this month than last. Get moving on Electronics – Ron Ray  Nothing done in the last month. Meeting scheduled with PPD EE on Friday. Complete set of requirements documents – Miller/Bernstein  Got commitments at collaboration meeting. Now have to get people to follow through. R. Ray - Mu2e WGM16