401 Burrard Street Vancouver John De Jong, Canada Lands Company Terry Tetreault, Public Works Government Services Canada.

Slides:



Advertisements
Similar presentations
Federal Energy and Environmental Regulation Agencies and Laws
Advertisements

Sustainable Construction
CBA Real Estate Law Section May 6, 2010 Denver, Colorado Green Leasing: Essential Considerations For Sustainable Development Neil B. Oberfeld ISAACSON.
Sustainability Is… Recycling Waste Prevention Integrated Pest Management Green Cleaning Indoor Air Quality Green Procurement/Purchasing Building Operations.
MUNICH REINSURANCE AMERICA, INC. NOVEMBER 5, 2014.
Ellen Beckmann, DCHC MPO/City of Durham David Stancil, Orange County January 8, 2008 Sustainability Initiatives in the Durham-Chapel Hill- Carrboro Metropolitan.
Quantifying Dublin City Enterprise Board’s carbon footprint & Developing a footprint reduction plan CarbonDecisions Update January 16, 2009.
Presented by: Jane Briggs and Karen Mitchell October 11, 2007 The New LEED Building at Shady Grove.
Buildings and Renewable Energy Haico Schepers Design Leader Sustainable Technologies Group.
Green Rating for Integrated Habitat Assessment (GRIHA) Ar. Partha Ranjan Das.
Sustainable Design Energy Sciences Building. 2 Sustainability Regulations DOE final rule [10 CFR part 433] (30% better than ASHRAE) DOE Order 430.2b:
Energizing Brownfield Projects Terri Smith Environmental Liability Management, Inc.
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
BECOMING GREEN Santa Margarita High School Academic Building.
Federal Energy and Environmental Regulation Agencies and Laws
Project 3 DS 413: Design Studio 413 May 9, 2010.
Project 6 DS 413: Design Studio 413 May 9, 2012.
A Sustainable Residential Design Project Project 16 DS 413: Design Studio 413 May 9, 2012.
PRISHA PROPERTIES INDIA PVT LTD.
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
SECRET Green Procurement Office of Greening Government Operations May 4, 2006.
Chapter 2 Environmental Policy and Programs  Terms and Concepts  External Programs: Sustainable Slopes Golden Eagle awards EPA and state leadership.
The Monsanto Center LEED EB: Operations & Maintenance Silver Certification.
330 North Wabash EPA’S ENERGY STAR RATING ACHIEVED December, 2009  330’s Energy Performance is in the top 25% nationwide accomplished through:  No Cost.
SUSTAINABLE FLORIDA TECH Presented by the Green Campus Group.
Steve Horseman – Grainger Industrial Supply, District Sales Manager for the State of Kansas The Four Corners of Sustainability.
A Sustainable Residential Design Project Project 2 DS 413: Design Studio 413 May 9,2012.
By: Akum Deol, Jimmy Parmar, Wyatt Berry, and Cody Clark K ent E nergy S aving S chool.
Project 5 DS 413: Design Studio May 9, A: 1A: Site is near a residential area. 1B: 1B: Existing trees were considered when planning heating,
Green Star – Campus Group Work. Rating tool framework Management Indoor Environment Quality Energy Transport Water Materials Land Use and Ecology Emissions.
Sustainability at Sears. November 17th, 2009 Climate Change will define the 21 st century.
Understanding Green Procurement Initiatives Workshop University of Illinois Making the Connection Conference Cynthia Klein-Banai Associate Chancellor for.
African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP.
ISA – BRITISH COUNCIL. What is Green School Project?How do we go about it ?Forming an eco-committeeDesigning an environmental vision statement Preparing.
Phoenix Convention Center Phoenix, Arizona Scope 3 GHG Reduction: Trends and Opportunities Sustainability Jed Ela GSA Office of Government-wide Policy.
Why Sustainable Construction?  Social progress, which recognises the needs of everyone  Effective protection of the environment  Prudent use of natural.
The Contemporary Home Collection. green construction process includes:  Recycled program and was te elimination programs used in the plant  High efficienc.
Evan McNamara Penn Valley Elementary School Construction Management Narberth, Pennsylvania Presentation Outline: Project Background LEED-EB Analysis Finish.
3.00 Understand employment, agency, environmental, energy, and intellectual property law environmental and energy law.
5 EXISTING BUILDINGS. Slide header copy In This Chapter >Sustainable existing buildings >Planning green projects for existing buildings >Measures to improve.
Sustainable Port of San Diego Michelle White Green Port Program Manager.
Board of Trustees Presentation Sustainability Plans Board Meeting February 2, 2009.
Conservation and Climate Action Plan. Outline History and background The Conservation & Climate Action Plan Plan to succeed Steps to adoption.
The American Recovery and Reinvestment Act: A NIH Overview.
A R C H I T E C T S E M I N A R WEBER+THOMPSON Founded-1987 B.Arch: University of Hawaii Studied under Jorn Utzon and Arata Isozaki Chairman of Washington.
Issues on the Horizon in Green Building For NCSU’s Campus Environmental Sustainability Team August 3, 2010 Traci Rose Rider, PhD, LEED AP BD+C ProcessTargets.
The Christman Company - Green MSU’s Greening the Supply Chain Conference April 21, 2014.
Sustainability and Facilities Management John Sullivan Energy & Sustainability Office Facilities & Services Division.
CITY LOGISTICS STRATEGIES AND POLICIES
 14:00 LEED Presentation  14:30 Teamwork time ST1  Compare your individual result  Prepare the presentation and save it to Moodle  Get the computer.
Bring It Home! Using Data Measurement Santa Fe Benchmarks Report What Gets Measured, Gets Managed! ●A ‘progress report’ to show us where we are ●Guides.
Sustainability: A Worthwhile Investment Steve Leeds Senior Counselor to the Administrator and Agency Senior Sustainability Officer March 15, 2011 IRMCO.
A SUSTAINABLE RESIDENTIAL DESIGN PROJECT PROJECT 10/DS 413/MAY 9, 2012.
Campus Energy Use Intelligent Infrastructure for Energy Efficiency May 25, 2007 Peter Cooper Dept of Facilities, Manager of Sustainable Engineering and.
3 R’s of Sustainability SESSION 1: The What, Why and How of Sustainability PREVIEW ONLY.
Jeremy Curry, Jeffrey Williams, Gary McCleod, Matt Gorecki, Drew Lattuca.
Do you know? By 2015, an estimated 40-48% of new non-residential construction by value will be green, equating to a $ billion.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
Greening Your Company in 2014: Opportunities to Improve Cash Flow and Maximize Environmental Benefits June 18, 2014.
Identifying Environmental Aspects EPA Regions 9 & 10 and The Federal Network for Sustainability.
Storage and Warehousing Techniques
COSCDA Program Managers Training Conference, Housing
Federal Energy and Environmental Regulation Agencies and Laws
Bruce May Alyssa Schindler Jennings Strouss & Salmon, P.L.C.
Objectives of a Green Building
Environmental Performance Prepared for CFOA, London, 28th January 2010 By Matt Farnsworth: Environment & Sustainability Manager, Nottinghamshire.
Fun Facts: James M. Bennett High School
Going Green in a Sea of Orange Clemson’s Experience with Implementation Environmentally Preferred Purchasing Policy.
‘Sustainability Matters – it’s the future of your business’
Green Cleaning to Meet LEED (Leadership in Energy and Environmental Design) Existing (Green) Building Operations and Maintenance Requirements.
Presentation transcript:

401 Burrard Street Vancouver John De Jong, Canada Lands Company Terry Tetreault, Public Works Government Services Canada

PWGSC Sustainable Development Background:  World Commission on Environment & Development (Brundtland)  Kyoto Accord (Greenhouse Gas Targets)  2001 PWGSC Sustainable Development Strategy  PWGSC Goals

PWGSC Goals PWGSC will green its:  Operations  Services  Internal Operations

PWGSC Goals Operations:  Reduce greenhouse gas emissions;  Reduce energy consumption;  Implement environmental management systems;  Responsible management of hazardous waste;

PWGSC Goals Operations (continued):  Implement integrated pest management;  Responsible management of ozone- depleting substances;  Reduce water consumption; and,  Responsible management of tenant office waste.

PWGSC Goals Services:  Increase capacity to deliver Real Property projects in an environmentally responsible manner;  Facilitate green procurement in government; and,  Provide tools to green federal government travel.

401 Burrard Owner  PWGSC Developer  Canada Lands Company Project Background:  The “History”  The “Deal”  The “Timeline”  The “Players”

401 Burrard Base Building:  Site  Construction Material  HVAC  Plumbing  Lighting

401 Burrard Greening Themes:  Energy  Transportation  Green Materials  “Green Living”

401 Burrard Energy Efficiency:  Efficient Lighting  Individual and Automated Controls  Motion Sensors  Task Lighting  Data Tracking

401 Burrard Transportation:  Proximity to major public transportation arteries including:  Bus and ALRT  SeaBus  Westcoast Express (Commuter Rail)  Helijet & Seaplane terminals  Bicycle racks/shower facilities

401 Burrard Water Conservation:  Reduced water flow plumbing fixtures;  Leak inspection; and,  Ongoing metering, tracking and monitoring of consumption.

401 Burrard Green Materials:  Carpet  Wallpaper (not fibre nor adhesive)  Exposed concrete  Bamboo/cork flooring  Low VOC paint

401 Burrard Green Materials (Continued):  High reflection panels  Recycled vertical screens  Recycled and recyclable carpet tiles  No premium for materials/good payback

401 Burrard Green Living:  Green Initiatives Committee (PWGSC and tenant departments);  Suppliers take back packaging;  Storage areas for collection and handling of recyclables;

401 Burrard Green Living (continued):  Composting;  Reusable supplies and materials;  Shared spaces and facilities;

401 Burrard Green Living (continued):  Carpooling and public transit programs;  Gym Facility (wellness); and  Green Cleaning  Products  Guidelines