Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Contemporary Home Collection. green construction process includes:  Recycled program and was te elimination programs used in the plant  High efficienc.

Similar presentations


Presentation on theme: "The Contemporary Home Collection. green construction process includes:  Recycled program and was te elimination programs used in the plant  High efficienc."— Presentation transcript:

1 The Contemporary Home Collection

2 green construction process includes:  Recycled program and was te elimination programs used in the plant  High efficienc y plumbing fixtures  Efficient water distribution designs  Indoor fabrication of modular units  No tropical woods  Environmentally preferable products  Enhanc ed framing techniques used in plant construction  Installation of ERV system  Zoned, not-ducted HVAC s ystems  High efficienc y wat er heat ers  Energy Star labeled exhaust fans  Rough-in radon protection  No added urea f ormaldehyde OSB and casework components  Low or no VOC adhesives, paints and caulks  Energy efficient thermal envelope  Carbon monoxide monitors each floor  Energy Star lighting package  High performance Energy Star rat ed windows  Dramatically reduced on-site waste and minimal plant waste.

3 http://www.guerdonmodularbuildings.com/video/green_video.html

4 Harbour Landing Apartments

5 Project Experience Highlights:  Installation of the modular units is managed onsite by Guerdon and Guerdon’s on-site installation contractors.  Site work and plant construction began in 4th Quarter 2010. By the end of January 2011, the first of 6 buildings were dried-in. The target date for the first building’s Certificate of Occupancy is April 2011.  Working with extremely cold climate conditions, the team’s in-depth knowledge of modular construction and its diligent work ethic were clearly demonstrated with this project.  Guerdon’s scope of work included the installation and structural connections of the building, close-up for weather protection, framing and decking of the drop-in corridor floors,

6 http://www.guerdonmodularbuildings.com/video/harbour_video.ht ml


Download ppt "The Contemporary Home Collection. green construction process includes:  Recycled program and was te elimination programs used in the plant  High efficienc."

Similar presentations


Ads by Google