Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project 6 DS 413: Design Studio 413 May 9, 2012.

Similar presentations


Presentation on theme: "Project 6 DS 413: Design Studio 413 May 9, 2012."— Presentation transcript:

1 Project 6 DS 413: Design Studio 413 May 9, 2012

2

3

4

5

6

7  1A: Avoid development of inappropriate sites  1B: Site within ¼ mile of 2 bus stops  1C: Water kept on site that falls there  1D: Roof materials supply high solar reflective index  1E: Rain garden

8  2A: Planting species native to the area  2B: Rainwater used for landscaping needs  2C: Water conserving toilet  2D: Low flow faucets  2E: High-efficiency fixtures

9  3A: Properly designed window layout to maximize sunlight  3B: Environmentally friendly HVAC system  3C: Shades to block out unwanted sunlight  3D: Utilize rain water  3E: Most windows are not placed on the west wall in order to keep the morning sun out

10  4A: Bamboo flooring  4B: 20% total value of materials originate regionally  4C: Recycling  4D: Materials made with recycled content  4E: 50% of all wood products are FSC certified

11  5A: Low emitting VOC paints used  5B: Carpet that is part of the Green Label Plus program  5C: Wood used without ureaformaldehyde resins  5D: Workers have access to daylight and views  5E: Monitoring system installed

12  6A: Solar electric computers  6B: 75% of roof surface has a solar reflective index of 78  6C: 50% reduction in potable water consumption - faucets  6D: 50% reduction in potable water consumption - shower  6E: 50% reduction in potable water consumption – high efficiency fixtures


Download ppt "Project 6 DS 413: Design Studio 413 May 9, 2012."

Similar presentations


Ads by Google