Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.

Slides:



Advertisements
Similar presentations
North Texas Municipal Water District Water Treatment Process.
Advertisements

DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
QUOTE FOR THE DAY Whoever gossips to you will gossip about you. - Spanish Proverb - You are what you think. You are what you go for. You are what you do!
Southwest Treatment Area The Coliseum Boulevard Plume (CBP) is a groundwater plume that contains trichloroethylene (TCE). TCE is a common solvent that.
A World of Water Part 2 Today’s Goal:
Zelienople Water Department Sources and Treatment.
Why Does the Lake Community Need a Sewer Septic tanks are failing. The life expectancy of a septic tank in “ideal” conditions is 20 years. In many cases.
WATER SUPPLY Murray Biedler July 09, WATER NEEDS Drinking Food Prep Hygiene / Washing Agric / Stock.
1 CE 548 Analysis and Selection of Wastewater Flowrates and Constituent Loading.
Quantity of Water and Wastewater CE 547. Probability Quantity of Water Types of Wastewater Sources of Wastewater Population Projection Deriving Design.
Surface Water Treatment Plant
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
City of Dayton Water Supply and Treatment Division.
Water and Wastewater Treatment Processes Crystal Penton, E.I. Will Larsen, E.I.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
History In 1932 Plymouth constructed its first wastewater treatment plant In 1959 they transferred the sewage utilities over to Plymouth Utilities.
City of Atlanta Department of Watershed Management Bureau of Drinking Water.
Wastewater generation
Chapter6 6-2 comparing functions.
What makes water dirty? How do we clean it. Can dirty water be cleaned? If you are like most people, you have not given ten seconds of thought to how.
Water Treatment Processes. Why do we need to treat our drinking water?  Industrial runoff  Agricultural runoff  Road runoff  Residential runoff.
Water Treatment & Distribution System Overview.
Water treatment Lilly Corradi.
Marina Coast Water District: A California Special District ORD COMMUNITY WATER AUGMENTATION DIRECTORS Dr. THOMAS P. MOORE President JAN SHRINER Vice President.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Processing, distribution and use of water.
City of West Linn Bolton Reservoir Replacement Planning Commission Hearing July 1, 2015 Presented by: Thomas P. Boland, P.E. Murray, Smith & Associates,
 Our Drinking Water Where is it coming from??. Where Chicago Gets its Water  Lake Michigan supplies our water  The city takes up to 2.1 billion gallons.
ENCE 667 Project Performance Measurement Patuxent Water Treatment Plant Upgrade schedule analysis Presented by: Luis Rubio Isobo Tariah.
5.2 Freshwater Pollution. Water Pollution Is the introduction of chemical, physical, or biological agents into water that degrades the quality of the.
Water in the Community: From Lake Ontario to us Thursday, March 25 th.
Southeast Energy/Water Interdependence Exercise Basic Drinking Water Treatment EPA-R4 Drinking Water Section April 25, 2007.
Portland’s Drinking Water Safe Drinking Water Act (SDWA) 1974 EPA standard for public drinking water 1986: Act amended to increase requirements for safety.
Generally speaking, water is a colorless, transparent, odorless, tasteless liquid that forms the seas, lakes, rivers, and rain and is the basis of the.
SANITARY ENGINEERING 1 COURSE OUTLINE
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Water Usage and Treatment. Where does the water that we use come from? Fresh water – lakes, rivers, streams, ground water Most water on the planet is.
Portland Drinking Water. Bull RunBull Run--Source primary drinking water supply for Portland Located 26 miles from downtown Portland in Sandy River basin,
Community Water Supply Efficiency Improvements Preliminary Potential Estimates for the 7 th Power Plan November 18, 2014.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Filtration. Why filter? Emitter Plugging Emitter Wear.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
 Watch the Peel Water Treatment Tours › Water Treatment Plant Tours Water Treatment Plant Tours  Complete the reading on Peel’s Water Treatment Process.
Considerations and operational challenges in choosing Membrane Filtration for a Water Treatment Plant Upgrade Ed Cross Division Manager, Water Supply and.
Water Treatment Plant Austin and Alison.
Community Water Supply Efficiency Improvements Preliminary Potential Estimates for the Seventh Power Plan October 14,
Date: Monday, May 11 th 2015 Topic: Water Purification Objective: To recognize the stages of it.
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Assignment You need to draw and label each step of the water treatment process Under each label explain what is happening in that step.
WITH SPECIAL THANKS TO. TOWN OF CALMAR LNEDA PRESENTATION Brought to You By: ED MELESKO Director of Public Works & Land Development.
ENVIRONMENTAL SCIENCE 5.4 The Waterworks. At the Waterworks When reservoirs or rivers are the source of drinking water, the water must be treated to remove.
The Waterworks Section 5.4. How does fresh water reach you? Ancient Romans built aqueducts – canals to carry water from the mountains to the city… some.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Safe, Clean and Drinkable
Water Supply Municipal Water Demand Civil Engineering Department Faculty of Engineering and Technology The University of Jordan Instructor: Ghada Kassab,
Water & Wastewater Capacity Charge Work Shop
Chapter 10 Groundwater.
Project Location.
Lecture # 11 Water treatment:.
Water treatment Potable water…water that is drinkable; safe for consumption Drinking water treatment is widespread in developed countries today However,
Natural Sciences and Technology Grade 6
Southwest Section AWWA 2018 – Baton Rouge, LA
City of Sunrise Wastewater Reuse Program
Skid Mounted Water Treatment Plant
Presentation transcript:

Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006

Objectives  Build water treatment plant to serve the water park and surrounding communities (expand the city limits)  Build small water treatment plant just for the park with only a sand filter and chlorine disinfection involved  The location of the larger treatment plant will not be on the park site  It will be on the nearest strip mine (brownfields)

Treatment Plant Proposed Location

The strip mine is owned by the Gulf State Paper Corporation. This is the brownfields that the city could pursue for development opportunities. Mr. Warner (owner) has been very generous in providing properties in the past for city projects. City needs ADEM and EPA approval and help with funding for cleaning. City may have funding to help clean and renovate the brownfields. Plan for Treatment Plant Location

Lake Nichol Built in 1954 and used as a water supply for city of Tuscaloosa. 380 acres and has a water capacity of 3.3 billion gallons. Originally designed for approximately 50,000 people. Use existing pipes and the pump station for our water plant in order to save cost.

Treatment Plant Based on Water Consumption Domestic usage: gal/cap-day Public usage: 5-20 gal/cap-day Commercial/Industrial usage: gal/cap-day Maximum usage: between 6-8 am and 6-8 pm. Minimum usage: –between 1 and 5 am. Park water rides water usage

Typical Water Treatment Plant 1.Chemical mixing basin 2.Flocculation Basin 3.Settling Tank 4.Rapid Sand Filter 5.Disinfection with Chlorine 6.Storage basin 7.Pump

Water Usage (from literature) Class of UsageQuantity (gal/cap-day) Average Quantity Domestic Commercial/ Industrial Public Leakage Total150 Ed Love Plant Water Storage Capacity: 25.4 mil. Gal Water Treatment Capacity: 45.7 mil. Gal/ day Population Served: 133,000 people

Predicted Water Usage for Tuscaloosa Consumption = (Water Treatment Capacity-Water Storage Capacity)/Population Consumption = (45.7 mil-25.4 mil)gal- day/133,000people Consumption = 153 gal/day-person

Population Prediction General population for the Lake Nichol area is about 2,400 people We used the arithmetic method to predict the population growth dP/ dt = K where dP/dt = growth rate K = constant Final population = Initial population + Kdt We estimate the final population to be 10,000 people.

Conceptual Design Period: 25 years Population: 10,000 Flow: 100 gallons/cap-day Area: –Watermelon Rd. –Yellow Creek Rd. –Old Lock 15 Rd.

Cost 1)Building the water treatment plant –$3/gallon of treated water –$25/linear foot of pipe 2)Cleaning the brownfields –Money from ADEM and EPA –City of Tuscaloosa funds

So In Review… We are providing a conceptual design for consideration. We plan to create a separate treatment system for the area due to population increases. The property and design we use would need approval from ADEM and the EPA. We hope the city will use some of its funds to renovate the brownfields.

Any Questions?