SCHOOL DISTRICT PALM BEACH COUNTY District Design Criteria DDC.

Slides:



Advertisements
Similar presentations
1 Solicitations/Advertisements Solicitations/Advertisements
Advertisements

Linking Program Review Data to Reports 1.Accessing & Using the Program Review Data Warehouse 2.Creating Hyperlinks in your Report 3.Exporting Colleague.
East Hampton High School July 2013 – July 2014 Design Phases.
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
NOTICE SUBMISSIONS Requirements and Procedures 1.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
What to look for, What to correct, How it should look,
How to Get Started eDMR Reporting System Florida Department of Environmental Protection (FDEP)
Lessons Learned An Architectural Perspective April 21, 2005 René Tercilla, AIA, REFP Tercilla Courtemanche Architects, Inc.
Measure C Board of Trustees Update January 18, 2005.
Heating, Ventilating, and Air-Conditioning
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
MasterFormat™ April 7, 2005 Kevin R. Miller.
Construction Materials MasterFormat Divisions.  A standard for organizing specifications  Used in the U.S. and Canada  Product of Construction Specifications.
Objectives To become familiar with a set of Construction Specifications; 1)Their layout and format. 2)The terms and definitions used and their legal ramifications.
MasterFormat™ March 17, 2004 Kevin Miller.
Study of Top 500 Design Firms’ Plans to Adopt MasterFormat™ 2004 Kevin R. Miller, Ph.D. D. Mark Hutchings, Ph.D. Brigham Young University.
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
Engineering Document Repository & Electronic Signature (E-Sign) Tutorial 1 DCG- Revision C 7/25/2014.
Construction Contract Documents
Title IX Information Navigating your way through Title IX.
FE Exam Application Procedures. Are you eligible to take the FE on campus? 1.Are you an undergraduate senior? – Graduate students must sit for the FE.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
Start the slide show by clicking on the "Slide Show" option in the above menu and choose "View Show”. or – hit the F5 Key.
Request for Waiver from Accessibility Requirements of Chapter 553, Florida Statutes Picerne Storage Building Annex.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Business Owners and Managers and the Fire Code
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
Construction Specifications Foreman’s Development Series
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
Crystal Mountain Club Association Architectural Committee
1 State-Adopted Textbook Requests Procedures and Policies.
SAISD Federal Programs Department. Stage 4 of the Organization and Development Process Link Plan to Federal, State, and Local Funding Sources 4 2.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Online Training for TEXAS TECH UNIVERSITY and TEXAS TECH HSC Hiring Managers Employment Office April 2003.
Construction Drawing Occupational Safety and Fundamentals
Specification & Quantities Estimating
Windows Internet Explorer 7 Chapter 1 Introduction to Windows Internet Explorer.
1 School District of Osceola County Facilities, Planning, Maintenance & Construction Monthly Update – April 2007 Construction Workshop 24 April 2007.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
Once the designer has decided to use and selected the correct Magna 3 pump in a specific application they must communicate these decisions to the contractor.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
ETP 1138C Week #2 Advanced print reading basics (Types of Engineering documentation) This week we will cover the following topics in class: We will introduce.
CEE 578 Senior Capstone Design Types of Construction Drawings
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
Introduction to CMIS, an Electronic Design Change Process Presented by: Mark Gillis (FirstEnergy) and Brad Diggans (Rolls-Royce)
Energy Huntsville Opportunity Report and Government Collaboration June 2016.
What is MasterFormat?. “MasterFormat is a master list of numbers and subject titles classified by work results or construction practices for organizing.
Facilities Management
White Pigeon Community Schools
April 2016 Bond / Facilities Update Presentation
Submission Deadline: Friday, November 17, 2017
How Completed Interiors Are Achieved: Designing & Building
Construction Documents
(Refer to Chapter 2 of the textbook)
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
MIRACOSTA COMMUNITY COLLEGE DISTRICT
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
How to use PSCEZPRINT Web site address: prairiestate.edu/ezprint
Improving Your Use of NARFE.ORG & NARFEWA.NET
Presentation transcript:

SCHOOL DISTRICT PALM BEACH COUNTY District Design Criteria DDC

Presented By Thomas Hogarth Victor Chodora

History Pre-June 1, 2004: there existed design criteria for mechanical (HVAC & plumbing), electrical (power & systems), and civil. All three documents where in a different format. June 1, 2004: the current DDC documents where issued, including architectural, civil, electrical, mechanical, plumbing, and structural. All documents in the same format with and index.

History SUMMER 2005: Planned released of updated DDC, so get your request in now.

Purpose Of Document The document is designed to express the district requirements in construction of new schools, modernizations, additions, and renovations. These requirements are based on past experiences but also contain incorporation of new technologies, products, and design concepts.

Sample DDC Text 12. Golf Cart Storage/Charging Area a. Locate Golf Cart Storage/Charging Area in a location near the Central Receiving Area. b. Provide proper electrical connections for charging of carts, coordinate with Electrical Engineer. c. Provide the required ventilation for the charging of carts and or storage of flammable material, coordinate with Mechanical. Engineer. d. Locate in an area convenient to exterior and roads or sidewalks. e. Check Educational Specifications for number of charging stations and storage capacity.

Use the Index Each document has an index. The index is linked to the document. If you left click with your mouse, the program will take you to that spot in the text. file/bd/html/Criteria.htm

Documents Architectural Building Requirements Outdoor Athletic and Play Fields Site Requirements Covered walks, signage, site design, etc Casework/Cabinets Materials, entry, circulation, etc Thermal and Moisture Protection

Documents Civil Site Surveys and Geotechnical Reports Site Access Storm Water Management Pavement Requirements Curbs and Sidewalks Play and Sports fields Water Utilities

Documents Electrical Power Distribution System Lighting Switching Receptacles General Requirements Electrical Systems

Documents Mechanical HVAC Design Criteria What HVAC Calculations are required Balancing and VAV Box selection requirements Forms for Calculations, balancing, and VAV selection procedure

Documents Plumbing Piping Systems Components Specific Room Requirements Relationship to Mechanical equipment Fire Sprinkler System

Documents Structural General Structural Requirements Threshold Buildings Load Requirements Concrete, Masonry, and Metals

Where to Find Documents These documents are located on our web site along with the District Master Specifications. Look under Building Department of Facilities Managements home page.

Where to Find Documents

How to Request a Change Follow instruction in procedure for Proposed Changes to District Master Specifications. Complete form and submit to Victor in the Building Department. Prefer request be attached to ,

How to Request a Change Submit request at any time, if substantial will issue addendum, otherwise change becomes effective next addition. Plan is for annual updates.

DDC Change Request Form

Other Documents Used With Design Criteria Educational Specifications District Master Specifications Building and Fire Codes

Recently Revised Procedure Shop drawings procedure recently revised to include required product approval list. Shop drawing matrix expanded to include additional shop drawings as well as the required product approval information. Matrix indicates if A/E is to review and sign prior to Building Department review. Matrix indicts which plans require signed and sealed drawings.

Shop Drawing Matrix

Other Useful Documents Other useful Information on our web page: Check list Interpretations Procedures

Home Page Bldg. Dept. Home Page

TCO Procedure Just a reminder with summer coming and the need to open schools, we have a process for TCO along with a check list. Copy of the check list is available on our web site. file/bd/bin/pdf/TCOchecklist.pdf

QUESTIONS ?