Additional Design Considerations 2011 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.

Slides:



Advertisements
Similar presentations
2009 PDCA Professor Pile Institute
Advertisements

Educational Resource Library
PILE FOUNDATION.
8. Axial Capacity of Single Piles
Chp12- Footings.
SHALLOW FOUNDATION NAME: INDRAJIT MITRA
DRIVEN PILE SPECIFICATIONS
Wave Equation Applications 2011 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.
Course : S0705 – Soil Mechanic
SOFT SOIL (PROBLEMS & STABILISATION METHOD) Session 2 - 7
INTRODUCTION Session 1 – 2
Pile Driving Equipment
Materials used for pipes: Sewers are made from: 1- Concrete 2- Reinforced concrete 3- Vitrified clay 4- Asbestos cement 5- Cast iron (lined with cement).
Special Design and Construction Considerations
Chapter (1) Geotechnical Properties of Soil
Large Diameter Open-End Pipe Piles for Transportation Structures Dan Brown, PhD., P.E., D.GE.
Session 25 – 26 DRILLED SHAFT And CAISSON FOUNDATION
AASHTO LRFD Section and 10
Using HECRAS TO Evaluate Scour At Bridges County of Orange Presented to the Flood Division August 13, 2001 by Nadeem Majaj.
STUDENT EXERCISE #2 Use the α-Method described in Section a and the Nordlund Method described in Section c to calculate the ultimate pile.
Foundations. Feature common to bridge and building structures Deep vs. shallow Safely transfer dead and live loads with acceptable levels of settlement.
  AN-najah National University Faculty of Engineering Civil engineering Department Prepared by: Eng. Imad A. F. Jarara’h. Submitted.
Pile Testing and Evaluation for the Sand Creek Byway, Sandpoint, Idaho Presented by Dean E. Harris, P.E., CH2M HILL.
SHALLOW FOUNDATIONS Spread footings Mat (Raft) foundations Square
CE 486 DEEP COMPACTION Name : Ali Hamood Al-teeb. ID :
Classification, Engineering Properties & Consolidation Methods.
Bearing Capacity Theory
Pile Foundations پي هاي شمعي.
Session 17 – 18 PILE FOUNDATIONS
Footings.
Commercial Foundations
ECGD 4122 – Foundation Engineering
Reference Manual Chapter 9
Subsurface drainage – Investigations
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Timothy Reeves: Presenter Marisa Orr, Sherrill Biggers Evaluation of the Holistic Method to Size a 3-D Wheel/Soil Model.
Presented by: 1. A measure of how easily a fluid (e.g., water) can pass through a porous medium (e.g., soils) 2 Loose soil - easy to flow - high permeability.
LIQUEFACTION FAILURE OF FOUNDATION - STRUCTURE COLLAPSE.
An-Najah Nationa Unuversity Faculty Of Engineering Civil Engineering Department Nablus-Palestine Foundation Design of Multy story building Suprevisors:
1 Driven Pile Foundation Support- Cost Components Wagner Komurka Geotechnical Group, Inc PDCA Professors’ Driven Pile Institute June 15-16, 2009.
OMAE 2009 Honolulu, HI - May 31 to June
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
Properties, Handling and Mixing of Particulate Solids By Sidra Jabeen Department of Chemical Engineering, University of Engineering & Technology Lahore.
Bearing Capacity from SPT and PLT
Wave Equation Applications 2009 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.
Session 19 – 20 PILE FOUNDATIONS
4. Properties of Materials Sediment (size) Physical States of Soil Concepts of Stress and Strain Normal and Shear Stress Additional Resistance Components.
BEARING CAPACITY OF SOIL Session 3 – 4
Bearing capacity of Piles in group By: Alka Shah Assistant professor Civil Department Nirma University.
Midwest Geotechnical Conference Implementation of the AASHTO LRFD Geotechnical Strength Limit State for Bearing Resistance of a Single Driven Pile.
PILE FOUNDATIONS UNIT IV.
GLE/CEE 330: Soil Mechanics Bearing Capacity of Shallow Footings
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Chapter 15 Soil-Bearing Capacity for Shallow Foundations
Pile Foundation Reason for Piles Types of Piles
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Deep Replacement Presented by: M. Taromi
Soil mechanics and foundation engineering-III (CE-434)
Prepared by:- Barham Jalal
The Engineering of Foundations
SHALLOW FOUNDATIONS BY, Babariya Ashish Gondaliya Ronak Gondaliya akshay Javiya hardik
BRIDGES MOST IMPORTANT GEOTECHNICAL EFFECT- LIQUEFACTION
Pile Group
S S SUBMITTED BY:- CHARU BHARDWAJ civil engineering
Foundations.
Arch205 Materials and building construction 1 foundation
Structure II Course Code: ARCH 209 Dr. Aeid A. Abdulrazeg.
Classification, Engineering Properties & Consolidation Methods
lectures Notes on: Soil Mechanics
Presentation transcript:

Additional Design Considerations 2011 PDCA Professor Pile Institute Patrick Hannigan GRL Engineers, Inc.

Additional Design Considerations Time Effects Time Effects Scour Scour Densification Densification Plugging Plugging Drivability Drivability

Time Effects on Pile Capacity Time dependent changes in pile capacity occur with time. Soil Setup Relaxation

Vesic’ (1977) – NCHRP 42 Design of Pile Foundations Time Effects on Pile Capacity

Soil Setup End of Initial Driving Restrike 8 Days Later Shaft = 3 x EOID

Relaxation Restrike 24 Hours Later End of Initial Driving Toe = ½ EOID

Soil setupincrease Soil setup is a time dependent increase in the static pile capacity. In clay soils, setup is attributed to increases in effective stress as large excess positive pore pressures generated during driving dissipate as well as due to thixotropic effects. Soil Setup In sands, setup is attributed primarily to aging effects and / or release of arching effects with time.

saturated claysloose to medium dense silts and fine sands Soil setup frequently occurs for piles driven in saturated clays as well as loose to medium dense silts and fine sands as the excess pore pressures dissipate. The magnitude of soil setup depends on soil characteristics as well as the pile material and type. Soil Setup

Multiple Static Load Tests (time, $$) How to Quantify Time Effects Dynamic Restrike tests - inexpensive, cost-effective -check for setup or relaxation -short-term restrikes establish setup trend -long-term restrikes provide confidence in capacity estimates Dynamic Restrike tests - inexpensive, cost-effective -check for setup or relaxation -short-term restrikes establish setup trend -long-term restrikes provide confidence in capacity estimates Non-instrumented Restrike Tests - uncertain if blow count change due to change in hammer performance or soil strength Non-instrumented Restrike Tests - uncertain if blow count change due to change in hammer performance or soil strength

1 day 10 days 100 days 1000 days log time pile capacity Technically desirable Economically desirable Restrike testing generally performed 1 to 10 days after installation Quantification of Time Effects When to restrike? Semilog-linear process

Efforts to Predict Setup Khan (2011) – Prediction of Pile Set-up for Ohio Soils Bullock et al (2005) – Side Shear Setup: Results from Florida Test Piles Skov and Denver (1988) – Time-Dependence of Bearing Capacity of Piles Q = Q o (1 + A log [ t / t o ]) Q = Q o t 0.087

where: A= Dimensionless setup factor Q S = Side shear capacity at time t Q S0 = Side shear capacity at reference time t 0 f S = Unit side shear capacity at time t f S0 = Unit side shear capacity at reference time t 0 t= Time elapsed since EOD, days t 0 = Reference time, recommended to use 1 day m S = Semilog-linear slope of Q S vs. log t Efforts to Predict Setup Bullock et al (2005) – Side Shear Setup: Results from Florida Test Piles

18” PSC with O-Cell at bottom Bullock et al (2005) – Side Shear Setup: Results from Florida Test Piles

For Closed-end Pipe Piles in Ohio Soils Q = Q o t Q = pile capacity (kips) at time t (hours) since EOID Q o = pile capacity (kips) at EOID Khan (2011) – Prediction of Pile Set-up for Ohio Soils ( Q includes shaft + toe)

EOID, t = Days Rs = 453, Rt = 1846, Ru = 2299 kN BOR #2, t = 0.69 Days Rs = 1046, Rt = 2077, Ru = 3123 kN BOR #3, t = Days Rs = 1530, Rt = 2113, Ru = 3643 kN BOR #4 t = Days Rs = 2121, Rt = 2092, Ru = 4213 kN BOR #1, t = Days Rs = 818, Rt = 2047, Ru = 2865 kN

Time (log) Capacity(kN) Total Shaft

Soil Setup Factor The soil setup factor is defined as failure load determined from a static load test divided by the ultimate capacity at the end of driving.

TABLE 9-20 SOIL SETUP FACTORS (after Rausche et al., 1996) Predominant Soil Type Along Pile Shaft Range in Soil Set-up Factor Recommended Soil Set-up Factors* Number of Sites and (Percentage of Data Base) Clay (15%) Silt - Clay (22%) Silt (4%) Sand - Clay (28%) Sand - Silt (18%) Fine Sand (4%) Sand (7%) Sand - Gravel (2%) * - Confirmation with Local Experience Recommended

Relaxationdecrease Relaxation is a time dependent decrease in the static pile capacity. During pile driving, dense soils may dilate thereby generating negative pore pressures and temporarily higher soil resistance. dense, saturated non-cohesive silts, fine sands, and some shales Relaxation has been observed for piles driven in dense, saturated non-cohesive silts, fine sands, and some shales. Relaxation

The relaxation factor is defined as failure load determined from a static load test divided by the ultimate capacity at the end of driving. Relaxation factors of 0.5 to 0.9 have been reported in case histories of piles in shales. Relaxation factors of 0.5 and 0.8 have been observed in dense sands and extremely dense silts, respectively. Relaxation Factor

Time Effects on Pile Drivability and Pile Capacity Time dependent soil strength changes should be considered during the design stage. SPT – torque and vane shear tests CPTu with dissipation tests Model piles Soil setup / relaxation factors Tools that have been used include:

Piles Subject to Scour Aggradation / Degradation Scour Types of Scour Local Scour Contraction and General Scour - Long-term stream bed elevation changes - Removal of material from immediate vicinity of foundation - Erosion across all or most of channel width

Piles Subject to Scour

Pile Design Recommendations in Soils Subject to Scour 1. Reevaluate foundation design relative to pile length, number, size and type 2. Design piles for additional lateral restraint and column action due to increase in unsupported length 3. Local scour holes may overlap, in which case scour depth is indeterminate and may be deeper.

Pile Design Recommendations in Soils Subject to Scour 4. Perform design assuming all material above scour line has been removed. 5. Place top of footing or cap below long-term scour depth to minimize flood flow obstruction. 6. Piles supporting stub abutments in embankments should be driven below the thalweg elevation.

Densification Effects on Pile Capacity

Densification can result in the pile capacity as well as the pile penetration resistance to driving being significantly greater than that calculated for a single pile. Added confinement from cofferdams or the sequence of pile installation can further aggravate a densification problem.

Densification Effects on Pile Capacity Potential densification effects should be considered in the design stage. Studies indicate an increase in soil friction angle of up to 4˚ would not be uncommon for piles in loose to medium dense sands. A lesser increase in friction angle would be expected in dense sands or cohesionless soils with a significant fine content.

Plugging of Open Pile Sections

Plugging of Open Pile Sections Open end sections include open end pipe piles and H-piles. It is generally desired that the open sections remain unplugged during driving and behave plugged under static loading conditions. Why ?

Plugging of Open Pile Sections Factors influencing plug development include hammer size and penetration to pile diameter ratio (D/b)

Plugging of Open Pile Sections During driving: Large hammer  plug slippage Large hammer  plug slippage Small hammer  plug formation Small hammer  plug formation Therefore size pile for larger hammer. See Reference Manual Page 9-185

Plugging of Open Pile Sections Under static conditions: Dense sand & clay  D/b ≥ 20 = plug Medium dense sand  D/b ≥ = plug H-piles are usually assumed to be plugged under static loading conditions due to the smaller section size.

PILE DRIVABILITY

Pile drivability refers to the ability of a pile to be driven to the desired depth and / or capacity at a reasonable driving resistance without exceeding the material driving stress limits.

FACTORS AFFECTING PILE DRIVABILITY Driving system characteristics Driving system characteristics Pile material strength Pile material strength Pile impedance, EA/C Pile impedance, EA/C Dynamic soil response Dynamic soil response Primary factor controlling drivability

PILE DRIVABILITY design stage Pile drivability should be checked during the design stage for all driven piles. Pile drivability is particularly critical for closed end pipe piles.

PILE DRIVABILITY EVALUATION DURING DESIGN STAGE 1. Wave Equation Analysis Computer analysis that does not require a pile to be driven. 2. Dynamic Testing and Analysis Requires a pile to be driven and dynamically tested. 3. Static Load Tests Requires a pile to be driven and statically load tested.

Effects of Predrilling and Jetting on Pile Capacity

Predrilling in cohesive soils and jetting in cohesionless soils are sometimes used to achieve minimum penetration requirements. Both predrilling and jetting will effect the axial, lateral, and uplift capacity that can be developed.

Effects of Predrilling and Jetting on Pile Capacity Depending upon the predrilled hole diameter, the shaft resistance in the predrilled zone may be reduced to between 50 and 85% of the shaft resistance without predrilling. In jetted zones, shaft resistance reductions of up to 50% have been reported.

Effects of Predrilling and Jetting on Pile Capacity It is important that the effect of predrilling or jetting be evaluated by design personnel whenever it is proposed.

Questions ? ? ?