MICE collaboration meeting Alain Blondel 27 – 10 - 2004 1 Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.

Slides:



Advertisements
Similar presentations
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
Advertisements

1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
24 Nov 2009PC Analysis PC Schedule 2009 Tuesdays fortnightly Proposed dates: 13 October  27 October  CM25 4 – 6 November  24 November 8 December.
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
1 Effect of staging on module connection and support arrangement Yury Ivanyushenkov RAL.
Alain Blondel MICE Funding Agency Committee MICE status report Most of the technical progress has been covered in the open session except the.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE CM39 Alain Blondel CB report 1 Report from the MICE collaboration board.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
CM37 Alain Blondel step IV physics success 1 « STEP IV operations : Physics »
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
MICE CM at OSAKA Alain Blondel, August MICE collaboration meeting at OSAKA (thanks to Mike Zisman, Makoto Yoshida, and Koji Yoshimura)Mike ZismanMakoto.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
MICE magnetic measurements: AFC considerations Alain Blondel see a previous discussion for reference in CM35 (Feb 2013 slides by V. Blackmore, A. Blondel.
1 Forces Yury Ivanyushenkov RAL. 2 Goal: find maximal (static and dynamical) possible forces in MICE magnetic system. Method: calculation of axial magnetic.
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
1 Search for Worst-Case Forces MICE Video Conference, September 8, 2004 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department,
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
1 OPTICS OF MICE STEP V.0 Ulisse Bravar University of New Hampshire 26 June 2005.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
(one of the) Request from MPB
MICE S TEP IV P HYSICS ‘D ELIVERABLES ’ V. Blackmore MAP 2014 Spring Meeting 30 th May, /15 AKA “What will we learn from Step IV?”
S TATUS OF THE P HYSICS A NALYSIS V. Blackmore MICE Project Board 29 th April, /30.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
MICE CM41 – CB summary Alain Blondel 1 Collaboration Board at CM41 Summary Alain Blondel.
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
Status of the MICE Construction Project
MICE CM31 Schedule summary
Presentation transcript:

MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible intermediate steps towards full MICE 3.Aims of this meeting 4.Assignments

MICE collaboration meeting Alain Blondel 27 – Nufact04 That is us (AB slides in SPSC Villars meeting)

MICE collaboration meeting Alain Blondel 27 –

4 The executive board submitted the following to the collaboration board

MICE collaboration meeting Alain Blondel 27 –  - STEP I: spring 2006 STEP II: summer 2006 STEP III: winter 2007 STEP IV: spring 2007 STEP V: fall 2007 STEP VI: 2008

MICE collaboration meeting Alain Blondel 27 –  Critical path items at the start are clearly a) the beam and b) the spectrometer solenoid (2->2.5 years after order)  Funding to get the spectrometer solenoids is difficult and causes delay. (~2 M€ a pair of rather standard technology) WE ARE STUCK!  the MICE management proposes to deal with this potential stumbling block, while remaining committed to ultimately achieving the full goals of MICE (“Step VI” above) by proceeding with additional intermediate steps  boundary condition: additional intermediate steps use mainly items that are part of the final MICE configuration.  The soonest we *may* be able to get the first spectrometer is from US funding  This leads to the consideration of step II.V (2.5)

MICE collaboration meeting Alain Blondel 27 –  - STEP I STEP II STEP II.V Insert absorber (solid) between the two halves and measure Pt & E distribution and emittance growth  Publishable result! STEP II.VI Split tracker in two parts and measure against each other (systematics) Establish beam match andwether we have all knobsnecessary to drawEmittance vs transmissioncurve. Measure emittance These are mostly questions for beam design and matching to and within solenoid.

MICE collaboration meeting Alain Blondel 27 –  the MICE collaboration is confident that it has enough resources to go ahead with practical measurements and achieve a first worthwhile goal.  justify our request to proceed with the implementation of the muon beam line. U.S. decision on Step 2.5 funding might be possible in about six months. Meanwhile we are actively pursuing the following alleys that should get us further 1. letter of intent submitted to Italian funding agency to proceed towards a full proposal to INFN; (under review now) (spectrometer solenoids!) 2. Investigations on use of MRI magnets that could be borrowed or leased from company to be used temporarily as spectrometer Magnets 3. We are exploring a request to the EU funding programmes for MICE under the heading “NEST” (New and Emerging Science and Technology). If any of this materializes soon enough US funding could be redirected towards RFCC Module, maybe in a reduced version (MICE step V.0 ?) well along full MICE, since AFCC module funding (UK &Japan) is earmarked (though not released)

MICE collaboration meeting Alain Blondel 27 –  - STEP I STEP II STEP III STEP IV STEP V This may be too expensive…Although we do have good prospectto secure 8 MW of RF power.

MICE collaboration meeting Alain Blondel 27 – STEP V STEP V.0 Should get 5-10 MV RF acceleration (limited by dark current) Shorter, less expensive, no coupling coil, (very limited optics flexibility) does this work in flip, RFoFo, non flip modes? These are mostly optics questions

MICE collaboration meeting Alain Blondel 27 – Upcoming UK gateway steps -- the foreseen cost and schedule review is foreseen on November 12th Essential ingredient for this : our beautiful Technical Design Report -- gateway 2/3 revue will take place late december (?) and will be focused on Beam Line and MICE design and development The discussion of step 2.5 above is quite relevant for this! Congratulations Paul!

MICE collaboration meeting Alain Blondel 27 – Aims for this meeting Decisions: According to follow up of Osaka CM, we need to achieve this time: 1 cryocooler decision remaining issue was Liq. He use for absorbers should be possible at least occasionally (not routine operation) 2 tracker validation remaining issues were mostly on performance (P L resolution?)  rms resolution should be <10% of rms of distribution at eq. emittance. without and with RF background. MICE note has been drafted and given to referrees (Gregoire + Summers) 3 decision on magnetic shielding for detectors upstream and downstream Also: 4 agree on policy towards step 2.5 & request for spectrometer solenoids (CB) There are difficulties in funding but there are good hopes that situation will unlock progressively. We dont want to be caught sleeping! Lets go ahead.

MICE collaboration meeting Alain Blondel 27 – Watch Progress (and enjoy if possible) 5 end to end simulation of MICE with G4MICE (RF background) 6. controls and monitoring of physics parameters (are we going anywhere here?) 7. finish matching all steps of MICE (essentially done, Bravo Ulisse) There remain many studies to be made to assess precision of predictions taking into account imperfections etc….  a lot of work for the optics group! (Welcome back Cristina) + construction of first RF cavity shipping of RF components to RAL MUCOOL test area first results from TPG Tracker analysis Beam design and simulations, and more.

MICE collaboration meeting Alain Blondel 27 – Assignments: Define path ahead and understand how to get there Example AFC working group: will define steps ahead to validate Hydrogen system, and delineate raodmap leading to first AFC module. This may include: -- prototyping of hydrogen system or critical parts thereof, incl. monitors -- safety review Similar road maps should be drawn for simulations, optics, RF tests, detector prototyping and beam test, etc..

MICE collaboration meeting Alain Blondel 27 – Assignments (Ctd) PAC2005: could all working group conveners discuss and prepare abstracts to be submitted to this big accelerator conference? Lets take advantage of this meeting to get this done.