Update on new alignment kit update 20/3/12 1. 2 Complete table based on a standard table (2400 x 1200 x 150) and a half table (2400 x 600 x 150).

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
SCT BARREL PAR - RAL May 2003 Status of Barrel Mechanical Structures - Cylinder manufacture - Bracket and small components manufacture - Dry assembly.
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Resistant Materials GCSE Tracking Booklet
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
Cryo Capture Cavity II Progress Mike McGee April 13, 2005.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
MICE Target Mechanical Design l Contents »Status of modelling and drawing »Work being undertaken at RAL on shaft and bearing prototypes »Procedure for.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
TABLE SAW SAFETY Pre-TEST. Ripping stock to width is accomplished by using a guide called the fence. TRUE.
Problem Statement There are over 25 million children under the age of 5 in the United States, many of these children are taken out to restaurants to eat.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
I Wilmut CCLRC1 End-cap Engineering 8 September 2004 Ian Wilmut, RAL.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
Kimberley Wilson.  The reason I am going to make a bedside table is because I would like to put something on it beside my bed.  I have lots of c.d’s.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
PASI OsC meeting 12th July 2012
SC Project Review of NCSX, April 8-10, 2008 Plant Design Integration, General Arrangement Drawings E. D. Perry.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
The Blockheads Status Presentation I. Week 1 Changes were made to our timeline and program based on the meeting held with Dr. Snell on Thursday, January.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
Nathanael O’Hara. IDEAS I Researched Games Tables I liked these designs in part I decided to mesh the designs into something I liked and also could work.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
1 IST development status  Seattle  Composite Design.
Stator Plan & Schedule Chris Booth 2nd March 2009
Teleconference ACS – FREIA 31th May 2017
Update on Module Mounting on Staves and Stavelets and a description of how the new system will work 11/7/11.
Update on module mounting on staves and stavelets 15/3/11
MICE Target Mechanical Design
Teleconference ACS – FREIA 10th May 2017
Equipment for Assembly – UK Experiences
10/month is the present production rate 2 FTE + sporadic contributions
X-ray Pump-Probe Instrument
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
AIDA Asic Heatsinks Prototype received, and approved.
Installation of Photon Beam Transport to FEH
Presentation transcript:

Update on new alignment kit update 20/3/12 1

2 Complete table based on a standard table (2400 x 1200 x 150) and a half table (2400 x 600 x 150).

Two granite tables to go to two different establishments. 3 RAL’s table x 1100 x Holes for stages Liverpool table x 600 x 150

Add picture of items in R56 4

Granite Status Granite (+2 sets of legs) delivered to RAL on the 19 th... yesterday! The smaller piece delivered to Liverpool yesterday too. Installation in the R12 clean rooms expected Thursday 29 th (first day heavy gang is free and I am at RAL) To set up the granite level will take about half a day. It will then take a further 2 weeks (my weeks) to reinstate the frame, interlocks and cabling so April 19 th we should be back where we were but on a granite table 5

6 Top view of placement jig Y adjustment X and Theta adjustment

Drawings/production Real drawings are now in exsistnace (rather than a model) We have had round 1 where Ian and I have commented on some features. We are now waiting for a second iteration. We are concentrating on the ‘bridge ‘ structure first and the associated walls. The cantilever we will tackle second. The plan is to construct 4 bridge structures but all the wall positions. There will be no prototypes just the 4 items that we will alter as appropreate. No fancy finishes for these ‘prototype’ items Waiting for the Ok to buy the bought in items such as dowels and bearings 7

Timescale to aim for activityEnd dateTime to complete Note to self.. Last round of drawings23rd MarchOrder up commercial items granite installed29 th March Refit frames safety cables5 th April2 weeks Restart software development Sp stavelet to populate, also several pipes to pressure test. Unspecified start time but schedule says end March 2 weeks Install vacuum system3rd May1 week Install fume extraction10 th May1 weekNeed to buy suitable pipes etc Install storage17 th May1 weekCheck drawings and get items ordered Expected delivery of manufactured items Mid May1 month from start Fit and make work ???? Adhesive tests to perform2 weeks 8