S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013.

Slides:



Advertisements
Similar presentations
Bexar County Infrastructure Services Flood Control Bexar County Infrastructure Services Flood Control Proposed 2007 Flood Control Projects BRWM Pre-Proposal.
Advertisements

Bexar Regional Watershed Management Program Bexar Regional Watershed Management Partnership Pre-Proposal Meeting for Bexar County Program Management of.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
District 4 Sign Assessment and Replacement Design- Build Project Request for Qualifications Information Meeting April 17 th, 2007.
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
TH 5 Mississippi River Bridge Design-Build Project S.P
1 Consultant Contract Program Collaboration Project ACEC-Mn/DOT Annual Conference March 2, 2010.
St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, :00 PM.
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
RFP AND CONTRACT PHASE Jeff Wassenaar, P.E., HQ Project Development Benjamin Acimovic, P.E., Region 1.
DBE Uniform Reporting: Understanding and Avoiding Common Errors Office of Civil Rights January 2014.
Module IV: CMGC Pre-Construction Phase Joe Elsen, Region 3 Benjamin Acimovic, Region 1.
WORLD BANK Overview of Procurement Opportunities Peter R. Easley, Esq.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Successful Proposal Writing.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
TH 13/101 Design-Build Project S.P October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
TH 169 & I-494 Interchange Design-Build Project S.P January 27, 2010 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Best Value Procurement MnDOT State Aid for Local Transportation Minnesota Local Road Research Board MnDOT Office of Construction and Innovative Contracting.
TH 610 Design-Build Project S.P February 25, 2009 Dan W. Penn, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING Looking TH 169.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
TH 55 Mill and Overlay Design-Build Project S.P
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
New York State Department of Transportation
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
New York State Department of Transportation
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
1. Project Team  Susan Barry, Project Director  Brian Burger, Deputy Project Director  James Martin  Mike Landvik  Kevin Irving, FHWA 2.
1 Doing Business with the University of North Texas System September 2015.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
ARRA Design-Build in Minnesota Jay Hietpas - Mn/DOT.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
Design-Build in Minnesota Minnesota Department of Transportation.
Construction Management At Risk Process
December 2,  Introductions  Disclaimers  Ground Rules  Project Overview  CMGC RFP Overview  CMGC Process  ICE/EE Procurement  Design Consultant.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
PRE-PROPOSAL CONFERENCE Welcome! Conference Room A/B NYSDOT 50 Wolf Rd, Albany NY Monday July 15, :00 to 12:00 Noon NEW YORK STATE DEPARTMENT.
PRE-PROPOSAL CONFERENCE Welcome! American Air Power Museum 1230 New Highway, East Farmingdale, New York November 14, 2012 Management, Business Development.
The University of Texas Medical Branch Business Operations and Facilities Consulting ServicesPre-Proposal Meeting Terrie Beasley, CTP UTMB Health, Purchasing.
I P M 1 City of Fort Worth City Council Presented by Doug Rademaker, Deputy Director, PMO Ken Hall, IPM Program Manager, CH2M HILL October 6, 2009 I n.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
RFP Health Education center furnishings
Project Purpose and Objective
RFP EMISSIONS SOURCE VALIDATION
Designers’ Manual Overview and Chapter Contents
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
January 14, 2015 Industry Briefing
Design-Build Process Utilizing Negotiated Selection
PROJECT DELIVERY METHODS
Pre-Submittal Meeting As Needed Environmental Services RFQ
SP TH 169 Redefine Informational Meeting July 25, 2019
Q2 Updates on 2019 Board Priorities
Q2 Updates on 2019 Board Priorities
Presentation transcript:

S.P. 8503-46 (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013

Outline Introductions Disclaimers Ground Rules CMGC Program Project Background CMGC RFQ / RFP CMGC Processes Consultant Contracts Conflict of Interest DBE Opportunities Questions

Introductions MnDOT Project Manager: Terry Ward MnDOT Deputy PM: Tory Thompson Our job is to ensure all proposers have the same information and to partner with the successful CMGC team and consultants. Feel free to ask questions at any time.

Introductions MnDOT CMGC Program Manager: Kevin Hagness Bridge Consultant Contracts: Keith Molnau Office of Civil Rights: Addi Batica FHWA City of Winona

Introductions Handouts Listing of Letters of Interest Responses. Winona Project CMGC OPCC Process. Winona Project CMGC GMC Process. Conflict of Interest.

Disclaimers We plan to post the final CMGC RFQ this week. This meeting represents the last opportunity for non-written questions DURING THE PRESENTATION.

Disclaimers We are taking notes during this meeting and will be posting any questions asked we feel need to be shared with those not in attendance. This presentation will be posted on-line.

Disclaimer What is discussed today is informational only, meant to assist proposers in the preparation of their proposals. The ultimate RFQ and RFP requirements are included in the final posted documents. If there are any discrepancies, submit a clarification request.

Ground Rules As per the CMGC RFQ: Terry Ward is the Single Point of Contact. Each Proposing team needs to identify a S.P.O.C.

Kevin Hagness, CMGC Program Manager S.P.O.C. for CMGC Program Questions. Winona is our first CMGC project. Working to help support delivering the Winona Project. Continue working on building our program, including further industry outreach. Educating MnDOT Staff/Districts about CMGC.

Project Background - Goals Start Construction in 2014. (Between July 2014 to March 2015) Place Traffic on New Bridge No. 85851 as expeditiously as possible. Keep river crossing open during construction. Minimize Scheduling Impacts / Constraints. Meet the Chapter 152 Maximum Price Cap of $142 million (not including ROW)

Project Background - Scope New Bridge No. 85851 Concrete Segmental Box Girder – river spans. PCB approach spans. Rehabilitation and Reconstruct Bridge No. 5900 Rehabilitate Through Truss. Replicate Deck Truss Approach Spans. Eligible for National Register of Historic Places. SHPO Programmatic Agreement.

Project Background - Scope

Project Background - Scope

Project Background - Scope

Project Background - Scope

Project Background - Schedule Municipal Consent – August 19th Public Hearing. ROW offers start 1-2 months after Municipal Consent (approx. 28 parcels). Environmental Assessment (EA) Public Hearing this fall. FONSI by end of year. Environmental Permits by July 1, 2014.

Project Background - Schedule Construction Schedule Phase I: July 2014 – March 2015 Bridge No. 85851 River Piers Phase II: March 2015 Remainder of Bridge No. 85851 and Roadway Phase II: Fall 2016 Bridge No. 5900 and Remaining Roadway. Complete Construction Fall 2019 / Spring 2020

Project Background - Cost Based on our Current Project Scope and Risk Profile: Bridge No. 5900 costs: $56-$63 million Bridge No. 85851 costs: $52-$59 million Roadway costs: $7-$9 million Total Estimated Construction Cost: $115-$131 million

CMGC RFQ / RFP Final CMGC RFQ Scheduled to be posted this week. CMGC RFP Release: September 3, 2013. Need Municipal Consent from City of Winona.

CMGC RFQ / RFP Two Step Process – RFQ / RFP. Best Value Selection. Evaluation Manual has been prepared and Technical Review Committee membership has been determined. RFP has been drafted.

CMGC RFQ / RFP RFQ may be a bit more work compared to other DOT CMGC RFQ’s (6 pages). Designed to try and spread out the proposal work amongst the RFQ / RFP.

CMGC RFQ / RFP Posted Draft RFQ Plan to Post Draft RFP

CMGC RFQ / RFP CMGC Experience is not required. There are other ways to show collaboration, partnering, risk and design coordination experience. Our Technical Review Committee will be trained in CMGC procurement / delivery and other procurement methodologies.

CMGC RFQ / RFP We plan to have multiple severable work packages (construction phases).

CMGC RFQ / RFP Issue LOI June 18, 2013 Issue CMGC RFQ By: August 2, 2013 Deadline for Submitters to Submit SOQs August 19, 2013 Shortlisting of CMGC Contractors for RFP August 30, 2013 CMGC RFP Issued September 3, 2013 Deadline for Submitters to Submit Requests for Clarification on the RFP September 23, 2013 Responses to Requests for Clarification on RFP Issued September 26, 2013 Deadline for Submitters to Submit Proposal October 8, 2013 Hold Interviews October 16, 2013 CMGC Contractor Selected October 25, 2013 Pre-Construction Services Contract Negotiated November 2013

CMGC RFQ / RFP Watch not only the MnDOT CMGC Website but the Consultant Services Website also. Any changes that need to be made to this RFQ will be posted MnDOT’s Consultant Services Web Page at www.dot.state.mn.us/consult/ under the “P/T Notices” section.

CMGC RFQ / RFP Other Sources of Project Information: MnDOT CMGC Website: www.dot.state.mn.us/const/tools/const-manager-general-contractor.html MnDOT Project Website: www.dot.state.mn.us/d6/projects/winonabridge/index.html

CMGC RFQ / RFP RFQ Scoring Criteria: Project Team/Capability. Concrete Segmental Box Girder Bridge Experience. Bridge Rehabilitation Experience. Major River Crossing Experience. Historic Bridge Rehabilitation and Reconstruction Experience.

CMGC RFQ / RFP RFQ Details: No Interviews. Email Proposal Submittals Required. Make Sure you get a confirmation. No Stipends. No minimum of maximum # of teams in statute to be shortlisted. Personal preference of Project Manager is 3-5 teams, but if we have more highly qualified teams, we may go with more than 5 on this project.

CMGC RFQ / RFP FTP Site for Background Information: ftp://ftp2.dot.state.mn.us/pub/outbound/district6/Winona%20Bridge/Proposal_Information/ CMGC RFQ / RFP

CMGC RFQ / RFP RFP Potential Requirements: Not anticipated to have a requirement to price a portion of the project. Anticipated to require submittal of Profit and Overhead costs that will carry forward to the construction phase.

CMGC RFQ / RFP RFP Potential Requirements: DBE Goal for Construction. No DBE Goal for CMGC P/T Contract. CMGC Team to develop a Subcontracting Plan Includes approach to DBE engagement and goal setting for the project as a whole and for each severable package.

CMGC RFQ / RFP RFP Potential Requirements: Interviews highly likely. Potentially targeted towards approach to CMGC project details (Overall Project Approach, Estimating, Scheduling, Risk, Design Collaboration etc….).

CMGC Processes Winona Project Specific Processes: Opinion of Probable Construction Costs (OPCC). Guaranteed Maximum Price (GMP). These will be posted on the MnDOT CMGC Program website shortly under the Winona Project.

CMGC OPCC Process

CMGC OPCC Process OPCC’s anticipated at 30%, 60%, 90% of Design. Owner’s Estimate is planned for this project. Overall Project Target Price at the first 90% OPCC is likely.

CMGC GMP Process

CMGC GMP Process Process Allows one GMP re-bid. If GMP is less than 10% of the ICE, it does not mean MnDOT will Award the contract.

Consultant Contacts Final Design Bridge No. 85851 and Roadway. Bridge No. 85851 Peer Review. Final Design Bridge No. 5900 Rehabilitation and Reconstruction. Bridge No. 5900 Peer Review.

Consultant Contacts Independent Cost Estimate. Owner’s Estimate by CMGC GEC. Possible MnDOT Estimating Office Contract Subsurface Utility Exploration (SUE). Construction Oversight. Other Misc. Consultant Contracts.

Consultant Contacts - Schedule Bridge 85851 Design: RFP: Aug 8th (3 week ad) Consultant selected: Sept 10th Peer Review: RFP: Aug 26th (2 week ad) Peer Review Selection: Sept 23rd Bridge 5900 Design: RFP: Sept 23rd (3 week ad) Br 5900 Design Selection: Oct 24th Bridge 5900 Peer Review: RFP: Oct 14th (2 week ad) Br 5900 Peer Review Selection: Nov 7th

Consultant Contacts - Schedule ICE RFP: Anticipated release in early September.

Conflict of Interest Applies to the Winona Project Will be posted shortly on the CMGC Website under the Winona project.

Conflict of Interest

DBE Addi Batica, MnDOT Office of Civil Rights Future DBE Meet and Greet Opportunities.

Questions?