Elk Run Interchange Design-Build Project S.P. 2505- 48 (TH 52) Elk Run Interchange Design-Build Project S.P. 2505- 48 (TH 52) PROJECT INFORMATIONAL MEETING.

Similar presentations


Presentation on theme: "Elk Run Interchange Design-Build Project S.P. 2505- 48 (TH 52) Elk Run Interchange Design-Build Project S.P. 2505- 48 (TH 52) PROJECT INFORMATIONAL MEETING."— Presentation transcript:

1 Elk Run Interchange Design-Build Project S.P. 2505- 48 (TH 52) Elk Run Interchange Design-Build Project S.P. 2505- 48 (TH 52) PROJECT INFORMATIONAL MEETING September 24, 2009

2 INTRODUCTION Terry Ward, Mn/DOT District 6 Mn/DOT Project Manager

3 DISCLAIMER What is discussed today is informational only, meant to assist interested teams in the pursuit of this project. What is discussed today is informational only, meant to assist interested teams in the pursuit of this project. The ultimate contract requirements will be included in the Request for Proposals (RFP). The ultimate contract requirements will be included in the Request for Proposals (RFP). There may be changes between now and the time the RFP is issued.

4 Project Partners City of Pine Island Olmsted County Goodhue County Federal Highway Administration Design-Build Proposers HNTB – Design-Build Contract Development SRF Preliminary Geometric Layouts Preliminary Geometric Layouts Environmental Documents Environmental Documents Tower Investments, LLC

5 Agenda Project Background Design-Build Procurement Design-Build Activity Questions

6 Elk Run Interchange Project Background

7 Trunk Highway 52 Freeway Partnership

8 Project Location

9 EA Preferred Alternative - 2003

10 Elk Run AUAR

11 Full Build-Out – 5,157 Acres  Residential – 3,860 acres  Commercial – 680 acres  BioScience – 208 acres  Institutional – 410  Park and ROW – included in Residential

12 Elk Run Project Location

13 Elk Run Background

14 Elk Run Concept

15 Elk Run Land Use

16 EA Update

17 Phase I - Preferred Option

18 Elk Run Interchange Project Layouts

19 City of Pine Island Abraham Algadi, City Administrator Project Issues Project Issues Development Issues Development Issues

20 Elk Run Interchange Project Design Build Procurement

21 Background http://www.dot.state.mn.us/designbuild/

22 Background http://www.dot.state.mn.us/designbuild/elkrun/index.html

23 Background Project Informational Meeting Presentation Preliminary Geometric Layout Utilities Layout Value Engineering Study Tower Right-of-Way Map

24 Background

25 Conflict of Interest

26

27 Single Point of Contact terry.ward@state.mn.us

28 Letters of Interest (LOI) Received Alliant Engineering, Inc. C.S. McCrossan Construction, Inc. Edward Kraemer & Sons, Inc. Hoffman Construction Co. Jacobs Lunda Construction Company Mathiowetz Construction Company Minnowa Construction, Inc. PBS&J Pierce Pini & Associates, Inc.

29 Letters of Interest (LOI) Received Reilly Construction Co., Inc. SEH Shafer Contracting Co., Inc. TKDA Ulland Bros., inc. URS Valley Paving incorporated WestwoodWSN Yaggy Colby Associates

30 Schedule Tentative – Subject to Change ACTIVITY Due Date ACTIVITY Due Date Issue RFQ October 2009 SOQ Due Date Oct/Nov Determine Short List Nov/Dec Issue RFP January 2010 Project Letting April 2010

31 Schedule Tentative – Subject to Change

32 Design-Build Best-Value Request for Qualifications (RFQ) Short-listing Request for Proposals (RFP) Technical Proposal Technical Proposal POSSIBLE CRITERIA: Quality Quality Safety Safety Innovation Innovation Schedule Integration Schedule Integration Public Relations Public Relations Alternate Technical Concepts Alternate Technical Concepts Price Proposal Price Proposal

33 Request for Qualifications Scheduled to be issued in October Project Goals: 1.Design and Construct a Quality product by enhancing Mn/DOT ’ s Quality Template. 2.Increase Long Term Performance using Quality Materials and Construction Methods. 3.Design and Construct a Safe project. 4.Maximize the design via Innovation for cost effectiveness and efficiency. 5.Integrate Interchange project schedule with development schedule. 6.Public Relations

34 Request for Qualifications RFP Stipend – 0.2% Scoring Responsiveness – 50% Responsiveness – 50% Technical Review of remaining 50% Technical Review of remaining 50% Mn/DOT Single Point of Contact terry.ward@state.mn.us terry.ward@state.mn.us terry.ward@state.mn.us

35 Elk Run Interchange Project Design Build Activity

36 Status Funding Right of Way Tower ROW Tower ROW Olmsted County Property Olmsted County Property Other Parcels Other ParcelsGeotechnicalUtilities Roadway Geometric Layout EA Update Municipal Consent

37 Tower Development ROW

38 Design-Build General Discussion Points Staged Approach to Delivery All construction completed by 2012. Co-Housing – probably not. Teams need to think about communications and issue resolution. Roadway Design Flexibility Roundabouts

39 New Elk Run Interchange Location

40 New Interchange Location – looking NB

41 Questions ?


Download ppt "Elk Run Interchange Design-Build Project S.P. 2505- 48 (TH 52) Elk Run Interchange Design-Build Project S.P. 2505- 48 (TH 52) PROJECT INFORMATIONAL MEETING."

Similar presentations


Ads by Google