K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

1 Update on project management for MICE Project Status and schedule Richard Apsimon MICE CMPB 5 th Nov 2007.
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
MICE WBS rebuild/extract: Top level: – –PM: (Long acting) Level 2: –MICE Muon.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
1 MICE phase I - Project Status Richard Apsimon (Project Manager) & Andy Nichols (Technical Coordinator) … with considerable help from Ken Long! MICE Video.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 paul drumm; ; FAC-PR MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
CMPB Alain Blondel 14 April STATUS OF MICE.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
Project report. Status: MICE Muon Beam Target: –Target presently installed ‘in-operative’: Optical connections removed (why?) –Implies realignment/set-up.
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Project manager report paul drumm CM16 October 2006.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 MICE CMPB Contents: Progress to date Project management things Plans for the May shutdown Steps towards Phase Two Problems and open issues summary Andy.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, DL, 4 th -7 th June 2008.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
Status of the MICE Construction Project
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions

Status (progress since CM18): CM18

Status (progress since CM18): CM19: Status reports on Phase I equipment and progress towards Phase II

Accomplishments: head lines: Target: Routine operation with multi-million actuations Progress on bearing materials Paper to Technical Board this week Cabling and installation plan in hand Removal of old target: MS&RA in preparation Upstream beam-line: Magnetic elements in place Services being prepared Radiation shielding: Decay Solenoid Area ‘block house’ built Additional shielding on plinth to allow working in DSA Not quite out of the woods! Downstream beam line: D2 installed Q35 stands procured: Base plates and lower girder boxes Upper girder boxes soon Q35 refurbishment progressing well But seeking to accelerate Services: De-mineralised water plant on order, temporary water will be needed Electrical services designed, now being implemented CKOV/TOF0 stand: Ready for production readiness review (PRR)

Accomplishments: head lines: PSI solenoid: Vacuum testing complete and successful Pressure testing complete and successful Alignment/refurbishment programme in hand Linde refrigerator: Contractors have started So far (1 week in) maintaining schedule Issue is radiation in Hall Priority to Linde in MICE Hall programme Plinth: Rails installed and aligned (0.2mm) before additional shielding installed LH2 test cryostat: Issue of shrouding of top of cryostat vessel under discussion Issue is prevention of ingress of oxygen YI has contacted ‘experts’ and prepared paper defining design modification: Paper presented to, and reviewed by TB Updated paper to TB this week, then pass to RAL safety RF power: Power from 4616 amp (June) 170 kW achieved September (200 kW required for MICE) Progress on refurbishment of 116 amp: At DL – mechanical AT CERN – mechanical Focus-coil tender exercise: Tender exercise essentially complete – discuss this week

Accomplishments: head lines: MICE Local Control Room: Preparation started Racks: First rack bases to be installed next week First racks (network and PPS) to be installed the week after Partitioning: On order; expect to be complete by end Oct07 Services: Air-con, power, etc. to follow Expect completion mid/late November Expect ToF 0/1 to be delivered to RAL early Nov07 In time for cosmic integration test Components of CKOVa (upstream module) at RAL: Window modification in R12 w/s Anticipate delivery of CKOV components in mid October In time for cosmic integration period in November KL presampler: Anticipate delivery to RAL in time for cosmic test

Accomplishments: head lines: Tracker: Station acceptance rig: recovered from power failure Debugging readout – production end this week? Completion of first tracker delayed: Milestone: 15Oct07 – likely delayed by a week or two Tracker group decision: Complete QA! Sandwich calorimeter: First prototype module produced in Trieste Spectrometer solenoid: Ship to FNAL for field measurements in December Expect shipment to RAL in Feb08 Absorber: MICE prototype absorber tested at KEK: Demonstrated need for LN2 pre-cooling Schedule to be reviewed this week

MICE instrumentation: Detector integration using cosmic rays: Cosmic test-stand to be set up in R12 Schedule: Tracker: Tracker arrives in R12:30Oct06 VLPC system commissioned in R12:02Nov07 Trigger system commissioned in R12:09Nov07 DAQ: Update DAQ system in R12:09Nov07 CKOV: Commission CKOV in R12:30Oct07 To be confirmed with CKOV team TOF: Delivered to R12:15Nov07 Integrated into cosmic test22Nov07 Cosmic test starts:09Nov07

Status: layout ‘issue C’:

Excellent progress, but, much to do Looking forward: Need to plan and prepare carefully!

Planning & organisation! (Headlines) Looking forward: Phase 1: Upstream beam line: Target: Negotiate running in January Dust issue Install services Q1 – 3, D2: Vacuum vessels Alignment Sevices (power, water) Instrumentation Downsteam beam line: D2, Q4 – 5, Q6 – 9 Services Magnet refurbishment, magnetic testing Instrumentation: TOF0/TOF1 CKOV Stands Tracker DAQ Spectrometer solenoid Infrastructure: PPS MLCR Magnetic sheilding False floor, plinth Rolling platforms Air-conditioning De-mineralised water Electrical services Network services Data link and data storage Phase II: Absorber/focus-coil module: Absorber Focus coils Integration RFCC module: Cavity R&D (MuCool) Cavity design finalisation Cavity fabrication Coupling coil manufacture Integration RF power: 4*2 MW amplfiers Missing: driver amplifier Distribution system Vacuum: Vacuum infrastructure Liquid-hydrogen 4 production systems Infrastructure: Cable management Cryogenic management

Organisation: Project Manager/Technical Coordinator and MICE Operations Managers Collaboration Board Project-management team:

Acting Project Manager: K. Long Managing the work in the MICE Hall: Weekly ‘MICE Hall Planning Meetings’: Tuesday’s 09:00 Anyone wishing to carry out work in Hall MUST attend: Parallel working  all need to be aware/cooperate One of the CDM ‘controls’ To be chaired by Hall Manager From week after next Chaired to date by KL W. Spensley will take over after Christmas Shutdown Reviews work done Identifies work to be done: Agrees priorities Agrees resources Identifies potential conflicts Assigns responsibilities Project-management: arrangements:

MHPM o/p example:

Project-management: arrangements: Have initiated ‘bottom-up’ review of MICE WBS: Assign/confirm responsibility for the various tasks Ensure schedules are planned by those responsible for carrying them out Ensure resource requirements are discussed To do this have initiated: Weekly ‘MICE Schedule Planning Meetings’ Thursday’s 13:30 Gathers schedule information and prepares/discusses schedules for i/p to, consideration by Technical Board Have begun with MICE Muon Beam and MICE Hall This week (13Sep07) MICO meeting, so begin to expand into international MICE deliverables To be chaired by Project Manager Presently chaired by KL To be chaired after CM19 (Oct07) by RA/AN

Work breakdown structure: revision

Plan for this week: Review at TB Present revised version to CB

Critical path & risk: Phase I: … getting it done Phase II: WORK SMART

Schedule revision: Revision of schedule started: Phase I: Since July, through MSPM and MICO meetings Phase II: Initiated at CM18 Next step this week Delayed because of pressure of work Original goal: ‘Baseline’ schedule at CM19 TB agree schedule review date this week

Schedule revision: example: Uses: Monitor progress Review resource assignments For Q35s have: Parallelised preparation Increased effort Q35 refurbishment: Goal: All six ready at end of Christmas shutdown

Christmas shutdown: Hayler

Technical Board: After TB discussion → CB Review membership: TB meeting Review modus operandi: TB meeting

Significant progress since CM18: Technical: All aspects of MICE project: Phase I Phase II Organisational: New Project Management team in place Even more to do: As acting Project Manager, I’ve enjoyed: Strong support from MICE collaboration Local MICE team The Rutherford Appleton Laboratory (ASTeC, ISIS, PPD, TBU, …) For the project to succeed: Richard and Andy must enjoy the same support I am confident that MICE will drive the project through! Conclusions: