U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Great Western Corridor Feasibility Study
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
BI-NATIONAL PARTNERSHIP STUDY Canada-U.S.-Ontario-Michigan Partnership Border Study.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
New I-65 Interchange at Worthsville Road Welcome!.
Port St. Lucie City of Crosstown Parkway Extension Project Development and Environment (PD&E) Study & Environmental Impact Statement (EIS) Substantial.
December 13, 2010 Developing Bicycle Performance Measures for Integrated Multi-Modal Corridor Management.
Environmental Assessment Public Meeting
Joe Olson SW Region Director December 8,  History/Background  Next Steps (Planning & Environmental Linkages (PEL)  PEL Process  Schedule  Questions.
Designated by US DOT Publication of Draft PFN for Comments - Spring 2013 Initial Designation of the PFN – Fall 2013 National Freight Network Primary Freight.
1 SCORT 2010 September 21, 2010 David Valenstein Federal Railroad Administration State Rail Planning.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Longmeadow Parkway Fox River Bridge Corridor
1 September 13, 2012YMPO RTP Technical Advisory Committee Meeting.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
October 6, :30 – 11:00. MPM Team Agenda Review of MPM program and team MAP-21 and other updates Mobility performance measures reporting On-going.
Purpose and Need 1. Importance of Purpose and Need 2  Understanding federal requirements for development of P&N statements  Know that a good P&N is.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
The purpose is to explore methods to improve the safety, capacity, and mobility of Falling Springs Boulevard, US 60, and adjoining roads.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Ohio Department of Transportation Steering Committee Meeting #3 Steering Committee Meeting #1May 30, 2012 Steering Committee Meeting #1 WELCOME Steering.
Andrew Winga, P.E. – WisDOT Project Manager.  Background on numerous Transportation Studies  What is a Planning & Environment Linkage Study  Problem.
Project Overview O CTOBER 27 TH, 2009 Presented to:
Oregon Passenger Rail Leadership Council Meeting June 6, 2012.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
USA Parkway Project Welcome Public Information Meeting to the
Public Involvement. Why? Who Cares? –What we do matters to the public –Effective PI enables proactive input and enhances the decision- making process.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
December 16, :00 – 2:45. MPM Team Agenda 1.Review of MPM Program and Team 2.Consensus items document 3. Upcoming activities 4. Discussion.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
Developing a Purpose & Need Statement. Objectives  Understand when the P&N is developed in the PDP  Understand the importance of a well- written/well-justified.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
TRTFN - BC Framework Agreement Planning Process Fred Oliemans, ILMB Bryan Evans, TRTFN Presentation to Public Workshop, Atlin, BC June 13, 2008.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
Border Master Plan Laredo, Texas July 28, 2010  Laredo District  Coahuila  Nuevo León  Tamaulipas.
PURPOSE & NEED Categorical Exclusion Training Class.
Planning and Environmental Linkages MPO/COG Conference February 24, 2016.
GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 1 Goods Movement Collaborative and Goods Movement Plan Final Plan Alameda County Transportation Commission.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Statewide Mobility Performance Measures Team Purpose Consensus on approach and measures.
Alternative Alignments Public Meeting
Route1 Multimodal Alternatives Analysis Status Update
Office of Transportation Planning Modal Planning Update
Technical and Public Advisory Committee Meeting #3
September 2011 Public Open Houses
September 2011 Public Open Houses
Reliability Standards Development Plan
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
Presentation transcript:

U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008

Points of Order The CAG Ground Rules include: The PSG will make all final recommendations with a goal of seeking stakeholder consensus. The PSG will make all final recommendations with a goal of seeking stakeholder consensus. All decisions must be arrived at in a clear and transparent manner and stakeholders should agree that their input has been actively solicited and considered. All decisions must be arrived at in a clear and transparent manner and stakeholders should agree that their input has been actively solicited and considered. Members of the media and others not in the CAG are welcome in all stakeholder meetings, but must remain in the role of observers, not participants in the process. Members of the media and others not in the CAG are welcome in all stakeholder meetings, but must remain in the role of observers, not participants in the process.

Community Advisory Group New Additions Barb Bees - The MAPPING Group Barb Bees - The MAPPING Group Ann Slavin - Friends of the Park/League of Illinois Bicyclists Ann Slavin - Friends of the Park/League of Illinois Bicyclists Jerry Paulson - Natural Land Institute Jerry Paulson - Natural Land Institute Fred Turk – Property Owner/Natural Area Guardian Fred Turk – Property Owner/Natural Area Guardian Welcome!!!

AGENDA

PROGRESS TO DATE PSG Meeting (April 11, 2008) PSG Meeting (April 11, 2008) Traffic Analysis Traffic Analysis Completed Feb Completed Feb Crash Analysis Crash Analysis Has been submitted and is currently being revised to address IDOT and FHWA comments Has been submitted and is currently being revised to address IDOT and FHWA comments Stakeholder Involvement Plan (SIP) Stakeholder Involvement Plan (SIP) FHWA approval April 24, 2008 FHWA approval April 24, 2008 EIS Timeframe EIS Timeframe Timeframe has been approved by FHWA; Timeframe has been approved by FHWA; completion of Phase I Fall 2011 Draft Purpose & Need Draft Purpose & Need

Summary of October CAG Meeting Developed Corridors Developed Corridors Viewed possible logos & provided input Viewed possible logos & provided input Developed the Problem Statement Developed the Problem Statement The problem with US 30 in Whiteside County from Fulton to Rock Falls is increasing traffic volume and congestion which overloads the area-wide traffic system, compromises safety, mobility and reduces the quality of life of the adjacent communities. There is a need for improved economic development and accessibility to the region while preserving agricultural and environmentally significant areas.

Summary of April PSG Meeting Presented the Corridors developed by the CAG Presented the Corridors developed by the CAG Consensus on the Corridor Screening Process Consensus on the Corridor Screening Process

Stakeholder Involvement Plan (SIP) Identifies stakeholders Identifies stakeholders Identifies outreach program Identifies outreach program Set tentative schedule Set tentative schedule Set tentative ground rules Set tentative ground rules Includes requirements of the SAFTEA-LU, NEPA, and CSS Includes requirements of the SAFTEA-LU, NEPA, and CSS

1 2 3

4 4 5

Summary of US 30 P&N Improve Traffic Capacity Improve Traffic Capacity Based on existing & projected LOS Based on existing & projected LOS Reduce Traffic Congestion Reduce Traffic Congestion Based on existing & projected traffic volumes Based on existing & projected traffic volumes Improve Safety Improve Safety Based on crashes & roadway deficiencies Based on crashes & roadway deficiencies Provide for an Increase in Transportation Demand Provide for an Increase in Transportation Demand Not ideal for designation as a Class II Truck Route Not ideal for designation as a Class II Truck Route Establish Roadway Continuity Establish Roadway Continuity Provide system linkage in the northwestern portion of the State and within the local transportation network Provide system linkage in the northwestern portion of the State and within the local transportation network

Break !

Purpose & Need Part of the NEPA Environmental Impact Statement (EIS) process Part of the NEPA Environmental Impact Statement (EIS) process The purpose & need of a project plays an important role in three areas of the EIS: The purpose & need of a project plays an important role in three areas of the EIS: Screening alternatives in order to identify those that will be studied in detail Screening alternatives in order to identify those that will be studied in detail Selecting the preferred alternative from those that will be studied in detail Selecting the preferred alternative from those that will be studied in detail Evaluating the No-Action alternative Evaluating the No-Action alternative

FHWA Guidance (Technical Advisory T A) PURPOSE & NEED The following is a list of items which may assist in the explanation of the need for the proposed action 1) Project Status 2) Capacity 3) System Linkage 4) Transportation Demand 5) Legislation 6) Social Demands or Economic Development 7) Modal Interrelationships 8) Safety 9) Roadway Deficiencies

US 30 Purpose & Need Outline developed by IDOT D2, BDE & FHWA stated the following would be used in the US 30 Purpose & Need: 1) Project Status 2) Capacity 3) System Linkage 4) Transportation Demand 5) Legislation 6) Social Demands or Economic Development 7) Modal Interrelationships 8) Safety 9) Roadway Deficiencies

Draft Purpose & Need Timeline Submitted to the IDOT District 2 & Central Office Submitted to the IDOT District 2 & Central Office Have received comments Have received comments Addressed comments Addressed comments Revised Draft has been submitted to FHWA Receive comments from FHWA May 7 th Revised Draft has been submitted to FHWA Receive comments from FHWA May 7 th P&N will go through another round of review and comment P&N will go through another round of review and comment Present at NEPA/404 Merger Meeting in September 2008 Present at NEPA/404 Merger Meeting in September 2008

THOUGHTS?QUESTIONS?DISCUSSION?

CAG CORRIDOR ALTERNATIVES

CORRIDOR SCREENING PROCESS A tool to aid in the corridor selection process

Corridor Screening Process* IDOT & the Consultant team will run the corridors developed by the CAG through a multiple level screening process to evaluate the corridors. IDOT & the Consultant team will run the corridors developed by the CAG through a multiple level screening process to evaluate the corridors. Before the screening process takes place: Before the screening process takes place: 1) PSG & CAG will provide input 2) Receive ESR Results *A tool that has been developed to aid in the corridor selection process

CORRIDOR SCREENING PROCESS

CORRIDOR SCREENING PROCESS

CORRIDOR SCREENING PROCESS

THOUGHTS?QUESTIONS?DISCUSSION?

Next Steps ESR Results ESR Results FHWA approval of P&N FHWA approval of P&N Screening Process Screening Process Corridor alternatives to be carried forward to the CAG Corridor alternatives to be carried forward to the CAG CAG Corridor Recommendations CAG Corridor Recommendations PSG Determines Corridor(s) to be carried forward PSG Determines Corridor(s) to be carried forward Discuss next Public Information Meeting Discuss next Public Information Meeting

THANK YOU QUESTIONS???