MOM report – part I Roumen Tsenov as MOM (10.6-7.7.2008)

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Commissioning needs MICO meeting 30 June 2008 MOM ( Roumen Tsenov)
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
CMPB Alain Blondel 14 April STATUS OF MICE.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
XEC Hardware Status MEG Review Meeting 2010 Liquid Xenon Group.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
MOM Report Galina Vankova RAL, MICE Video Conference.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Configuration Database Antony Wilson MICE CM February 2011 RAL 1.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE Target Development Lara Howlett University of Sheffield.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
MICE MICO Alain Blondel 23 December MICE Commissioning needs 22 December 08.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
MICE Operations Scenario Run 1
Luminosity Monitor Status
Presentation transcript:

MOM report – part I Roumen Tsenov as MOM ( )

Target Efforts to acquire the data from ISIS Beam Loss Monitors in the target data stream are in progress. A bunch of 15 cables is there to transmit data from ISIS BLM. New DAQ card that can cope with the increased number of channels is being obtained. Modifications to the existing target DAQ code are being considered. Expectations: new DAQ ready for when Sheffield people bring the new stators down to RAL (21 st July?). Documentation how to run the target is now available. Temporary solution to include the target related data in the MICE main data stream is being worked out.

MICE beam intensity and ISIS beam losses and machine activation On June 2008 a long run was performed (~18 hours, target actuations) with 50 mV BLM readings. (This would correspond to ~ 1 good muon in our beam line per target dip.) Activation measurements were made before and after the run. They have shown no significant increase of the dose rates (see next slide).

Differences: “after” – “before” the run on June

Short term programme on this two meetings with ISIS people conducted (minutes available in the MICE elog-book); high beam loss investigation with progressive increase of dip depth in short steps from 50 mV readings of BLM up to mV or so (under Dean Adams’s supervision): record vacuum rise and losses in SS1 and SS7/SS8, and more generally changes in ISIS beam parameters; long term (up to 24 hrs) run with 200 mV BLM reading (machine at base rate 50/32 Hz); measurement of ISIS activity before and after the run with several measurements for the key locations; the program should be scheduled for the end of ISIS User Cycle 2008/2, ~25 July.

KL and TOF0 arrived and mounted in the specified positions: before Q7 and after Q9.

KL fully cabled, powered, tested and integrated in the DAQ. Cosmics have been taken.

Helium in the DS refrigerator and our PMTs When operating the DS cryogenic system certain amount of gaseous He is released in the atmosphere. In the event of solenoid quench ~180 cubic meters of gaseous He may be released. He is dangerous for the PMTs; it diffuses through the glass, deteriorates the vacuum in the PMT and causes increase noise level and after-pulses. On the other hand, He does not mix with the air. It is so light that it goes straight up and very quickly in the atmosphere. To be on safe side, special hoses with appropriate fittings have been provided and during the normal operation of the DS He will be led outside the hall. Also, special permanent hose has been fitted to one of the outlets in the gas panel so that in case of a quench helium will be vented outside the hall, too.

Documentation Manuals available from the MICO Web page (some are new or updated): BC-instructions-V1.0.pdf MAGNET-check-list-V1.0.pdf MMB-conventional-magnet-power-supplies-instructions-2.0.doc Manual_PL512.pdf SY527.pdf V1290_REV9.pdf V1724_REV12.pdf v820v830_rev4.pdf MICE_DAQ_QuickStart.doc MICEOnlineMonitoringQuickStart.doc MiceTargetDAQOperatingInstructions.doc Target_Operation_Guide.doc IC_AND_FERMI_DAQ.txt EPICS_AFE_and_BeamMonitors.pdf FNAL_BeamMon_Sender_Receiver.doc Quite a few more will be needed in a very near future…

Miscellaneous  introduce MICE Hall on-line calendar so that activities in the hall can be planned accordingly and possible clashes avoided (Malcolm has been involved already);  more office space for MICE visitors is needed in R76;  MICE car and MICE bicycle(s) for visitors’ transport needs;  ensure accommodation of the MOM and shifters in Ridgeway House provided they have no other preferences (being accommodated farther causes problems with the local transportation).