A smart signalling system for Indian railways Smart signalling system – user’s view Full capacity realisation Flexibility of movements Easy to operate.

Slides:



Advertisements
Similar presentations
Intelligent Pressure and DMA Management
Advertisements

Operation & Maintenance Engineering Detailed activity description
CL100D series DSP controlled Uninterruptible power supplies.
RiT PatchView Solution
Isolation Verification Control Mining - Marine - Transit – Solutions LIVE Distributed By Locksafe Industrial Safety Equipment.
GE job title/1 GE internal information - Not for external distribution 1 GE Security EMEA NPI template – v1 1X Series (phase 1) Conventional Fire Panel.
VSE Corporation Proprietary Information
The battery plays a key role in the overall reliability and availability of a power protection system. It supplies the energy required by the critical.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
BPS12 Battery Power Supply. December 2003 Page 2 Better Than Standard UPS systems Longer battery life –unique charging scheme DC power output –instead.
GS3055-I GSM Universal Wireless Alarm Communicator
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
1 Fox Valley Fire & Safety’s Wireless Radio Network Our customers experience reduced monitoring costs; normally 25% or more. Eliminates expensive phone.
Representative Sampling By Chuck Abbott. Automatic Samplers.
Proximity Technology Update Hadley Richardson South East Account Manager 24 th of May, 2011.
Wireless Remote Control Derail System CSX Atlanta, GA Track and Derail Graphic layout CSX Atlanta, GA.
DATALOGGER Welcome to the Presentation on DATALOGGER.
Predictive Maintenance: Condition monitoring Tools and Systems for asset management September 19, 2007.
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
For Electric Vehicle Team Members Pramit Tamrakar- Electrical Engineering Jimmy Skadal- Electrical Engineering Hao Wang- Electrical Engineering Matthew.
RF Drive Test (Testing) Engr. Mehran Mamonai. Introduction Every good RF design, after its implantation should be evaluated. There are few ways to do.
For Electric Vehicle Team Members Pramit Tamrakar- Electrical Engineering Jimmy Skadal- Electrical Engineering Hao Wang- Electrical Engineering Matthew.
SCADA and Telemetry Presented By:.
2015 World Forum on Energy Regulation May 25, 2015
Front Page …..is an Asset Management tool designed to record and aid the analysis of activities affecting Production capability and costs. …..promotes.
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
ANSALDO: BACKGROUND experience in dependable Signalling Automation Systems experience in dependable Management Automation Systems experience in installation,
INTRODUCTION 1 What word comes to your mind to describe “ The attempt by two objects to occupy the same space at the same moment in time”
JOINT EFFORTS OF MUNICIPAL CORPORATION FARIDABAD & S.A.S. SERVIZIO PVT. LTD. (formerly known as RAMSONS) MISSION STATEMENT To become ‘partners in progress’
Truly Powerful. Flexibility, Scalability, Reliability User Friendly Software  Predefined parameters  Scaled down for easy admin  Personalised reporting.
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
Single Loop Analogue addressable fire control Panel
APC InfraStruxure TM Central Smart Plug-In for HP Operations Manager Manage Power, Cooling, Security, Environment, Rack Access and Physical Layer Infrastructure.
18 September Licensing for Next Generation Signalling Buddhadev Dutta Chowdhury 27 th April 2012.
POWER SYSTEM PROTECTION
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
IHRIS: Open Source Health Workforce Information Systems Pilot Project Name Event Location - Date.
FAULT TREE ANALYSIS (FTA). QUANTITATIVE RISK ANALYSIS Some of the commonly used quantitative risk assessment methods are; 1.Fault tree analysis (FTA)
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
PS ERC New Pserc Projects Mladen Kezunovic. PS ERC Newly approved projects "...Enhanced Reliability..." Kezunovic "...Automated Integration..." McCalley.
Cctv Management Solution - CMS From – Intelitech Solutions Pvt. Limited. [ ITSPL Group ]
Centralised Traffic Control Working On Dhamra line of ECoR
System Sentry Protect and Defend Your ATR. 1.Help’s prevent sites from going down. 2.If site should fail, provides the tools to remotely restart and repair.
PLC ARCHITECTURE - CPU by Dr. Amin Danial Asham.
Welcome to OmniMetrix. Who We Are OmniMetrix ® is the leader and pioneer in machine to machine (M2M) wireless remote monitoring, control and diagnostics.
Utility Engineers, PC.  Generation  Transmission  Distribution.
TMALL 0141 Presentation v 1.0 Asset Management Bo Olsson Bucharest October 7th, 2015.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
132KV GSS PIPAR CITY JODHPUR
Network management Network management refers to the activities, methods, procedures, and tools that pertain to the operation, administration, maintenance,
PROGRAMMABLE LOGIC CONTROLLER
S0LAR AUTOMATIC RAILWAY TRACK CRACK DETECTING VEHICLE
Copyright© 2005 Avaya Inc. All rights reserved Avaya UPS Training powerware.com/avaya.
Rohde & Schwarz Topex TOPEX IP Radio Gateway July 2011.
Exit REMOTE POWER SYSTEM ”Turning your copper into gold”
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
PROPRIETARY INFORMATION - © 2015 WOODWARD, INC. PAGE 1 HighPROTEC-2 MRI4-2 Feeder Relay Sales presentation 2015/08/10.
© 2013 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. Eaton Power.
Lecture 11. Switch Hardware Nowadays switches are very high performance computers with high hardware specifications Switches usually consist of a chassis.
Exit REMOTE POWER SYSTEM ”Turning your copper into gold”
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
Network Management Functions
Coal Line Longitudinal
In ABB AbilityTM Electrical Distribution Control System (EDCS)
Operations Management
Presentation transcript:

A smart signalling system for Indian railways

Smart signalling system – user’s view Full capacity realisation Flexibility of movements Easy to operate Intelligence to identify bottle necks - plan movements – suggest best option Maximum availability – reliable & minimum maintenance blocks - degraded operation in case of unavoidable failures Unique meaning to each aspect – easy to understand - adequate uniform braking distances

Challenges of Signal Engineers on IR Over used infrastructure – less time for maintenance Skill up-gradation of maintenance staff Multiplicity of similar equipment in one section Customisation of foreign technology Age old maintenance practices and schedules Inadequate diagnostics of signalling equipment

A Smart signalling system Maintenance practice Periodical preventive – disconnection of equipment Breakdown – processor based equipment Predictive – desirable

A Smart signalling system Signalling Equipment to generate diagnostic data Monitoring system with Root cause identification Diagnostic alarms to maintenance staff on real time – to reduce MTTR

A Smart signalling system Reports to increase MTBF - long term performance To identify contribution of local conditions --- installation & maintenance practices operating staff --- equipment failure to take managerial decisions to provide inputs Semi centralisation of field equipment – for better trouble shooting & monitoring

Skills to build smart signaling system Accurate & non-invasive measurement of parameters - Voltage & Current Time Distance [gap] Potential free contact Data of processor based – IPS, DAC, LEU, EI Transportation of data from place of measurement without delay to central location

Skills to build smart signaling system Ability to process large data on real time basis Ability to convert real time data - useful information to generate actionable alarms - adopting predictive maintenance Time synchronization of geographically distributed monitoring systems Analytics of big data to identify trends in system behaviour for long term planning

A smart signalling model for IR Least additional hardware to implement Best use of communication medium Less maintenance - Reliable Data integrity Accessible to all Data availability on real - time basis

Model 1

Model 2

Model 3

Model for monitoring an equipment

Examples of smart signalling components

DC Track Circuit

Predictive maintenance - DC TC Excitation below the set limit – availability Excitation above the set limit – safety Feed end voltage less than set limit – battery Excitation is OK but track repeater relay not operated in relay room Track feed charger input voltage beyond set limits External supply in Location beyond set limits

Current signature – DC TC

Use case of DC track circuit monitoring

Point machine Current signature

Use case of point machine monitoring

Alarms - from current signature Point failed due to obstruction – which end of crossover Point machine not operated even after control relay operation Point machine correctly operated but detection failed Point machine overload protection time delay less Point machine friction clutch requires adjustment Point machine operating voltage beyond set limits Point detecting voltage beyond set limits

ELD – Earth Leakage Detection

Relay Status Fault Message Occurred TIME 1 S6 RECR UP at 07:06:04:593 Earth Leakage appeared in 110V AC Supply 04/23/ :03:10 2 S20 RECR UP at 08:25:42:890 3 S18 RECR UP at 08:29:16:718 4 S15 RECR UP at 08:29:36:109 5 S3RECR UP at 08:58:48:140 6 S1 HECR UP at 09:02:37:265 7 S1D DECR UP at 09:02:37:345 8 S6 DECR DN at 07:06:04:078 9 S20 DECR DN at 08:10:40: S20 HECR DN at 08:25:42: S18 HECR DN at 08:27:46: S18 DECR DN at 08:29:16: S15 DECR DN at 08:29:35: S3 HECR DN at 08:58:47: S1 RECR DN at 09:02:37: S1D HECR DN at 09:02:37:921

BMU – Battery Monitoring Unit

Cell voltage – high resistance

Integrated Power Supply

Dissemination of diagnostic data Front end technician - on real time basis – actionable - reduce the MTTR Supervisor - diagnostic data – to get root cause - to guide technician at site Manager - more statistical information - trend of failures - to decide inputs required to be given

Dissemination of diagnostic data

Maintainer – Supervisor – OEM

Measurements made easy

Data security - Cloud – big data Smart signalling system is data intensive - option of adopting new technologies - ‘cloud’ – ‘Big data’ Implementation of Information Security standards – [ISO 27001]

Information security

Smart testing

Smart testing – output Test name Operation with time stamp Expected result Actual result with time stamp of the event Success Route 1A-A 52 Point negative test 52 Point normal detection drop initiated: at 01/04/ :28:51:0 52 NWKR Down 1A UCR Down 1A HR Down 52 NWKR Down 01/04/ :28:51:312 1A UCR Up 01/04/ :28:50:766 1A HR Down 01/04/ :28:51:344 No

Thanks