Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius,

Slides:



Advertisements
Similar presentations
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Iterative development and The Unified process
Delivery Methodology.
Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name.
Report from ILC GlobalGroup 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara · GDE December 8, 2005.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Review of CLIC-ILC collaboration on technical subjects (accelerators) and ways to improve the collaboration Jean-Pierre Delahaye, Marc Ross Nick Walker.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
CLIC-ILC Cost & Schedule Working Group Meeting TILC09 – Sunday, April 19, 2009 reported by Peter H. Garbincius CLIC_ILC_phg_21april09.ppt.
CLIC-ILC Cost & Schedule Agenda – 8feb08 John Carwardine = secretary & rapporteur this file: & Schedule Sub-Group.
Sendai, March 3, 2008 TILC08 · GDE Meeting Global Design Effort 1 TILC08 · GDE Meeting on International Linear Collider · Tohoku University Sendai · Japan.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
EGIS Working Group Meeting March 18th, /18/20131.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
27-March-10 LCWS10 - Beijing Global Design Effort 1 Barry Barish LCWS10 - Beijing 27-March-10 “Cost Containment” for the TDR.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
EDMS for CFS Discussion: How to best use EDMS for CFS in ILC preparation? Lars Hagge, Benno List Deutsches Elektronen-Synchrotron DESY LCWS13, Tokyo,
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Develop Project Charter
Agenda : CLIC Civil Engineering and Services (CES) WG.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans.
AAP Review 横谷 LC 定例 Preparation of AAP Review General charge sets the frame Version of early November Rough structure of the meeting has been.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
Cost Model including Civil Engineering and Conventional Facilities Hans-H. Braun, CLIC ACE, June 20, 2007  Cost model goals  Methodology  Scaling assumptions.
Global Design Effort 会議報告 Cost Management Group Meeting at DESY – 08 設楽 哲夫 LC GDE 報告会
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
EM Report1 Report from Engineering Management Group to GDE EC 2007/12/12 Report by N.Toge.
CLIC Cost at 3 TeV and 500 GeV CDC meeting, Hans-H. Braun for CLIC cost & Schedule WG Mick Draper, Katy Foraz, Claude Hauviller, Bernard Jeanneret,John.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
CLIC/ILC Collaboration: 17/05/ 08Cost/Schedule Working Group1 CLIC-ILC Collaboration - #2 Cost and Schedule working group John Carwardine, Katy Foraz,
Jurgen De Jonghe CERN/IT-AIS Administrative Information Services Cost Estimate Tool For CLIC Jurgen De Jonghe CERN / IT-AIS
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 Global Design Effort John Carwardine: [date] Cost Estimate data management John Carwardine Feb 8, 2008.
November 05, 2008CFS-GBL meeting 1 PM report Nov 5, 2008: 0) ILC08 plenaries 1) Summary of Pac review 2) Report on ttc and barc (india) 3) Summary of positron.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Update on cost-related issues Philippe Lebrun Joint CLIC-ILC meeting on costs CERN, 12 June 2009.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
CLIC08 workshop Cost requirements for CLIC H. Braun, G. Riddone
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Status of Triad’s ICET – 8april09 Peter Garbincius, John Carwardine, Tom Himel, Tetsuo Shidara, Triad: Spencer Curtis, Larry Lew, Kevin Long (almost) weekly.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
Module 8: Effective Innovation Review and Selection Process
LCWS11 AWG9 PARALLEL SESSION SUMMARY
CLIC-ILC Cooperation ILC “PAC Review” – Vancouver May 9, 2009 Conventional Facilities Cost & Schedule Working Groups reported by Peter H. Garbincius.
Presentation transcript:

Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius, H. Braun, G. Riddone plus EC and Triad CLIC-ILC Cost & Schedule also K. Foraz & S. Weisz – CERN cost_management_phg_20nov08.ppt

Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 2 ICET – ILC Cost Estimating Tool Background & Rationale –safeguard the RDR estimate – EDMS & database –facilitate design & cost optimization studies –seamlessly link to future cost & schedule tools ILC Costing Tool Functional Requirements doc Triad Project Management firm recently started Triad gave status Presentation at LCWS08 incl ILC EC, DESY/EDMS,CLIC-ILC C&S WG First face-to-face: Triad & Lars Hagge EDMS –Triad sent “Use Case” sheets to DESY/EDMS –DESY/EDMS owes Triad API documentation

Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 3

Triad’s Tool & Processes System Architecture for ICET not all paths shown

Cost Component sheet for a specific cryomodule type Line Items – can reference a Cost Component or a Part Estimate Module example

Triad’s presentation Showed need for more emphasis on DataBase input data flow should be EDMS => DB, then DB => ICET with reports ICET => both EDMS & DB We must decide whether “what-if” scenario studies are driven from EDMS or from DataBase Projected Dates: test modules in ILC hands by end of Dec08 and fully operation by end of March09 Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 6

by Katy Foraz, to compare to ILC CF&S RDR construction schedule by Martin Gastal Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 7

ILC RDR Cost Estimate for BDS was given to CLIC BDS has closest correspondence CLIC-ILC –comparable systems should have comparable estimates – or understandable differences, e.g. energy, technology (SC vs. perm. mag. final focus) –goal is to have no public disagreements Given under the ILC Confidentiality Protocol BDS does not include Cryomodules & Klystrons Sent to CLIC Cost & Schedule Team in Oct08 Gave “guided tour” to estimate spreadsheet & backup materials at this meeting Lots of ILC cost estimating info for CLIC to study! Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 8

CLIC plan for Cost Tool Updated version of specification including schedule information [EDMS#975066] Updated version of DB Entry template –Schedule information –begin-end dates for Resource Requirements planning –include both production and installation –Triad recommended same for ILC Cost Estimate Tool –Two energy configurations (500 GeV and 3 TeV) Development of tool at CERN using Excel DBE, oracle database and web interface similar to existing CERN management tools (M. Draper, J. DeJonghe) –first prototype ready by 2Q 2009 –final version by end of 2009 Peter H. Garbincius November 20, Cost Management LCWS08 - UIC

Template 1/2 Peter H. Garbincius November 20, Cost Management LCWS08 - UIC

Template 2/2 Peter H. Garbincius November 20, Cost Management LCWS08 - UIC

e.g. PBS to level 4 & cost coordinators Peter H. Garbincius November 20, Cost Management LCWS08 - UIC

PBS comparison Peter H. Garbincius November 20, Cost Management LCWS08 - UIC

Future work Schedule for PBS level 2 areas (K. Foraz) Complete CLIC schedule (main tunnel, exp. areas, injectors) Compare CLIC schedule assumptions with ILC assumptions Review ILC schedule with same CLIC assumptions Preparation of templates (coordinators) –Schedule information –Number of units Filling of template (coordinators) with input from experts (archive in CERN EDMS structure) Selected area estimate (e.g. module) to be ready by Jan 09 Full cost estimate to be ready by end of 09 Tool development in 2009 (prototype by 2Q 09, final version by end of 09) Peter H. Garbincius November 20, Cost Management LCWS08 - UIC

- CLIC-ILC Cost & Schedule Working Group WEBEX Meetings 1400 GMT - 2 nd Thursday of each month (CLIC Cost & Sched – last Thurs) - Keep work towards cost estimate mutually transparent - Profit by synergies - Understand and communicate unavoidable differences in the methodologies used for the two projects - Construction & installation schedules for CLIC & ILC w same methodology – June09 - Common ILC/CLIC notes (for mid ’09) Tunnel safety underground compliance Fabio Corsenego - together with ILC-CFS and CLIC-CES groups Standardization methods to estimate cost of warm magnets including cabling and power supplies – Braun & Garbincius gathering materials, but need engagement of international magnet fabrication experts Description of cost risk assessment – Braun, Riddone, Lehner, Garbincius … our common plans: Peter H. Garbincius November 20, Cost Management LCWS08 - UIC

Summary for Cost Management and CLIC-ILC Cost & Schedule WG Triad PM Consultants started working on ILC Cost Estimating Tool – presented status to us and Executive Committee & DESY EDMS Gave & demonstrated ILC BDS estimate to CLIC Compared CLIC & ILC WBS & Estimate Templates Need detailed comparison of schedules Need common documents: tunnel safety, estimating magnet costs, risk analysis methodology Scheduled up monthly WEBEX meeting Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 16