ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Data Acquisition for an LC Detector Report from the extended ECFA/DESY LC Workshops Cornell, Jul. 15 th.

Slides:



Advertisements
Similar presentations
Latest Developments from the CCD Front End LCWS 2005 Stanford Joel Goldstein, RAL for the LCFI Collaboration.
Advertisements

HLT Collaboration; High Level Trigger HLT PRR Computer Architecture Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer.
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 1 Front-End-Electronics for ILC Calorimeter Development G. Blanchard, P. Gay,
HLT - data compression vs event rejection. Assumptions Need for an online rudimentary event reconstruction for monitoring Detector readout rate (i.e.
28 February 2003Paul Dauncey - HCAL Readout1 HCAL Readout and DAQ using the ECAL Readout Boards Paul Dauncey Imperial College London, UK.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
ECFA Sep 2004Paul Dauncey - ECAL DAQ1 Thoughts on Si-W ECAL DAQ Paul Dauncey For the Imperial/UCL groups D. Bowerman, J. Butterworth, P. Dauncey,
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
ILC Trigger & DAQ Issues - 1 ILC DAQ issues ILC DAQ issues By P. Le Dû
SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Data Acquisition for the ILC G. Eckerlin DESY LCD Group meeting, SLAC, Jan 27 th 2005 Outline Conditions.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Development of an ASIC for reading out CCDS at the vertex detector of the International Linear Collider Presenter: Peter Murray ASIC Design Group Science.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
DAQ for 4-th DC S.Popescu. Introduction We have to define DAQ chapter of the DOD for the following detectors –Vertex detector –TPC –Calorimeter –Muon.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Joel Goldstein, RAL 4th ECFA/DESY LC Workshop, 1/4/ Vertex Readout Joel Goldstein PPd, RAL 4 th ECFA/DESY LC Workshop DAQ Session 1 st April 2003.
G. Volpi - INFN Frascati ANIMMA Search for rare SM or predicted BSM processes push the colliders intensity to new frontiers Rare processes are overwhelmed.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
LHCb front-end electronics and its interface to the DAQ.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
Silicon Detector Tracking ALCPG Workshop Cornell July 15, 2003 John Jaros.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
Data Acquisition, Trigger and Control
J-C Brient-DESY meeting -Jan/ The 2 detector options today …. SiD vs TDR [ * ] [ * ] J.Jaros at ALCPG-SLAC04 ECAL ECAL tungsten-silicon both optionsHCAL.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
November, 7, 2006 ECFA06, Valencia, Spain LumiCal & BeamCal readout and DAQ for the Very Forward Region Wojciech Wierba Institute of Nuclear Physics Polish.
Readout controller Block Diagram S. Hansen - CD-1 Lehman Review1 VXO Ø Det Links to 24 SiPM Front End Boards Clock Event Data USB ARM uC A D Rd Wrt 100Mbit.
FPGA based signal processing for the LHCb Vertex detector and Silicon Tracker Guido Haefeli EPFL, Lausanne Vertex 2005 November 7-11, 2005 Chuzenji Lake,
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
Mu3e Data Acquisition Ideas Dirk Wiedner July /5/20121Dirk Wiedner Mu3e meeting Zurich.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Slow Control and Run Initialization Byte-wise Environment
Slow Control and Run Initialization Byte-wise Environment
Overview of the Data Acquisition Activities
RT2003, Montreal Niko Neufeld, CERN-EP & Univ. de Lausanne
Trigger, DAQ, & Online: Perspectives on Electronics
Power pulsing of AFTER in magnetic field
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Toward a costing model What next? Technology decision n Schedule
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
A First Look J. Pilcher 12-Mar-2004
ILD Ichinoseki Meeting
VELO readout On detector electronics Off detector electronics to DAQ
Example of DAQ Trigger issues for the SoLID experiment
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
LHCb Trigger, Online and related Electronics
The CMS Tracking Readout and Front End Driver Testing
SVT detector electronics
Presentation transcript:

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Data Acquisition for an LC Detector Report from the extended ECFA/DESY LC Workshops Cornell, Jul. 15 th 2003 Outline Requirements and operation mode DAQ concept and basic design Feasibility and examples Current R&D efforts Summary

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Data Acquisition for an LC Detector This Report is based on the TESLA TDR and contributions at the ECFA/DESY LC Workshops For details see the last workshops of the series : 1 st workshop Krakow/Poland Sep nd workshop St. Malo/France Apr rd workshop Prague /Czeck Rep. Nov th workshop Amsterdam/Netherlands Apr. 2003

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Data Rates at the LC Physics (example 500GeV Tesla) e + e -  X /BX e + e -  e + e - X  0.7/BX Beam induced background: neutrons 2000n/BX e+e- pairs ● VXD inner layer 1000 hits/BX ● TPC 15 tracks/BX ● ECAL 3000 cells/BX -> Background is dominating the rates !

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin The LC will have high luminosity this will give high data rates and need large event building bandwidth Want to do precision physics need large event samples and good (controlled!) efficiencies. this needs very low deadtime at high rates and high 'selection' efficiency Want to exploit new physics potentials may be interessted in by now unknown signatures this needs a very flexible event selection The LC will have high intensity beams large variation of background possible Needs all the above requirements DAQ Requirements

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin LC Bunch Structure repetition rate: 5 Hz (3 Hz) [120Hz] bunches per train: 2820 (4500) [192] bunch separation: 337 ns (189 ns)[1.4ns] train - length: 950  s (850  s)[260ns] train separation: 199 ms (332ms)[8.3ms] values for 500GeV (800GeV) Tesla and [NLC 500GeV]

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin readout and store complete bunch train in pipeline  no hardware trigger  up to 1 ms active front end pipeline for Tesla (~ 300 ns for NLC) zero suppression and data compression in front end  reduce bandwidth needs software selection on full data of complete train  full event information available for software filter  Store classified events according to (physics) needs modular system (PC farms, switched network,...)  scalability use commercial available hardware components and industry standards  maintainability Software Trigger Concept

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Data Acquisition Levels 1 ms pipeline, no trigger interrupt, sparcification software event selection using full information of a complete train readout between trains (8-200ms) detector specific, common functionality Uniform interface, standardized Commodity hardware high level prog. Lang.

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin 1ms active pipeline  TPC : no gating -> reduce ion feedback by GEMs or Micromegas  VTX : high occupancy in the 1 st silicon layer  -> need column parallel readout during train Readout of pipeline inbetween trains (8-200ms)  need sparsification on the detector level  if readout time bigger than train separation  -> need parallel readout and buffering in the front end No active pipeline outside the train periods  may front end electronics be swtiched off/on many times per sec??  how to collect calibration data (cosmic ) ? Impact on the Detector Readout

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin From SLD experience 300MPixel, 5MHz readout, 8bit ADC 960Mbit/s, kBytes/event LC requirements main background from pair production, falling rapidly with radius L1/50MHz : 4.3hits/mm 2 L2/25MHz : 2.4 hits/mm 2 (2500pixel/mm 2 ) LC DAQ requirements maximum rate off CCD 3.3TPixel/s -> sparsification needed 5bit resolution sufficient, 10Mbyte stored on readout chip readout per side : 5 LVDS (1/ layer) converted into 1 optic fiber DAQ can store 20% of CCD in raw mode (for diagnostics) CCD Vertex Detector Readout (LCFI Collaboration)

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin TPC Electronics * 10 6 readout channels need zero suppression/cluser finding 10MHz digitizing, 10 bits (track point = 3 pads * 5 time bins) Simulation physics event: 500 K word (incl. time stamp) pair background : small compared to physics event size for safety used 50K space points (random) -> 0.1% occupancy ➔ Occupancy less then 0.1% if you believe background simulations (1% of the 1.5 * 10 9 voxels are assumed for the DAQ studies to be save) TPC Readout (Mike Ronan)

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Data Volume (from TESLA TDR) Data Volume (from TESLA TDR) ➔ 1.1 Gbytes/s

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Common features of TESLA and NLC/JLC :  Short time between bunch crossings inside a bunch train  Long time between trains with nothing at all.....  High Lumi within a few msec Cannot afford deadtime inside a train  Need to have a pipeline active during the full train length  TESLA : 1msJLC/NLC : 260ns  Readout before next train (or in parallel to active pipeline)  TESLA : 199msJLC/NLC : 8.3ms Can we do this ?  TELSA : 220MB/train in 200ms -> 1.1GB/sec bandwidth  JLC/NLC : ~ 10MB/train* in 8.3ms -> 1.2GB/sec bandwidth  (to compare with LHC/CMS : Gbit/sec)  No problem * JCL/NLC number are scaled TESLA numbers assuming identical background rates and detector setup Common DAQ for TESLA/NLC ?

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Current R&D Activities Detector readout R&D Using existing (modified) electronics (TPC, HCAL,...) Developing of new front end readout chips (LCFI, SiLC, Calice,...) Test systems and tools Existing setup for TPCs in several Labs (based on STAR, ALEPH,....) Building of a new test system for ECAL/HCAL beam tests (CMS based) General remarks First common tools for different detectors are being prepared Discussion on a general data handling model has started

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin A LC Data Handling Model Data handling logically divided into 4 layers Front end readout Central data collection Event building and processing Permanent storage (not covered here) Between these layers interfaces have to be defined to Enable parallel development of components in different R&D groups Reduce dependencies and allow technology changes at a later stage Control and Monitoring will be an essential part Clock distribution, bunch tagging Run control, process control, calibration, monitoring Keep the design Global Detector Network aware !

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Functionality of the Layers Front end readout hardware : preamplifier, shaper, ADC, memory,... functions : zero-suppression, hit/cluster finding, digital buffer, multiplex Central data collection one unique intelligent interface cards for all detectors input buffer, data formatting, data reduction (data compression?) output buffer and standardized interface to event building Event building and processing commodity hardware : network switches, processor farm (PC?) full event data processing, all bunch crossings of a complete train software finders will tag 'bunches of interest' for permanent storage

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Coordinate and Foster DAQ R&D To coordinate the DAQ R&D Define building blocks and their functionalities Specify Interfaces between these blocks Identify uncovered readout R&D areas Foster R&D efforts Encourage common test systems for different R&D groups Develop tools to ease beam tests Collect and provide information on existing R&D efforts Need to coordinate and foster increasing number of activities A DAQ working group at the ECFA study will address this in Europe -> should start to do this on a world wide basis !

ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Summary Software Trigger concept is adequate for both LC options requirements look similar (operation mode, event rates, bandwidth) impact on detector frontend readout seems to be ok Many R&D efforts started world wide on detector prototyps some need R&D for readout already, others take existing electronics need common tools and setups to ease beam tests need to follow detector R&D efforts to keep them compatible Make this a world wide effort contribute to the DAQ R&D groups and the DAQ page of the World wide study R&D :