Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation4/13/2010 Upper Dublin High School Construction Project The New Upper Dublin High.

Slides:



Advertisements
Similar presentations
Federal Reserve Bank of Boston Case Study
Advertisements

Emerging Lighting Technologies Roundup
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Harwood Union High School Board of Directors Presenters: Gabriela Meade and Lorne Nix Presented: April 25 th, 2007 Vermont Energy Education Program.
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
WAL-MART STORES, INC. DEMAND RESPONSE. Wal-Mart in New York Supercenters45 Discount Stores45 Neighborhood Markets 0 Sam’s Clubs17 Distribution Centers4.
Energy retrofit solution for 400w MH Highbays!! Question:How many fixture lumens do you need to replace one 400w MH highbay? Answer:About 20,000 lumens.
The Pennsylvania State University Department of Architectural Engineering Harrisburg University Academic Center Laurel Heather Warner Construction Management.
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
WAL-MART STORES, INC. ENERGY EFFICIENCY AND DEMAND RESPONSE.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
 Budget: $210,000  Energy : 255,700 kWh  Demand reduction: 36 kW  Cost Savings: $34,520 / year  Utility Incentive $61,370  Simple Payback = 4.2.
Genesis Solar Module Brochure ™
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
Green Building Residential Construction
Who Says Energy Efficiency Can’t be Sexy? About Us Energy + Environment  Since 1999  Decades of experience in energy efficiency  We create jobs, lower.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
Senior Thesis Presentation Carey L. Steckler April 14, 2005 Highland Elementary School Ambridge Area School District Ambridge, Pennsylvania.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
SENIOR THESIS PRESENTATION
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
Adam Trumbour 2010 AE|CM Introduction Building Overview Thesis Overview Breadth Analysis 1: CHPS Study Breadth Analysis 2: Green Roof Breadth Analysis.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
University Medical Center of Princeton David Bodnar Construction Management 2010 Senior Thesis.
CARDEROCK SPRINGS ELEMENTARY SCHOOL Bethesda, Maryland Joe Hirsch | Construction Management | Dr. Magent.
Name of Building(s) or Project Speaker(s) Organization(s)
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Fairfax High School Renovation and Addition Washington, DC M ICHAEL F UNK Construction Management.
Presented By: Derek Snover Construction Management.
Paul Roberts Senior Thesis 2010 Construction Management.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
1 Outlook 2009 Conference October 8, 2009 The Color of Money is Still Green: A Candid Discussion about Sustainability.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Government Office Center Mid-Atlantic U.S. Penn State AE Senior Thesis Project Alexander Ward | Construction Management James Faust | CM Advisor.
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
North Hills Junior High School Pittsburgh, PA Senior Thesis Final Presentation 2005 Chris Rush Lighting / Electrical Faculty Consultant: Dr. Mistrick.
Bellefonte Area High School Mark Demianovich Construction Management 2007.
Lighting facts.  Lighting can be a big energy consumer in offices and production areas and experience shows that energy savings may be achieved - often.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Building Introduction & Thesis System 4: Central Geothermal System 1: Industry Standard System 2: Design System System 3: Domestic Geothermal Original.
Staying Ahead of the Curve IFM Outsourcing pushes the envelope on energy savings Chris Pesek, Managing Director Integrated Facilities Management, JLL.
UC/CSU/CCC Sustainability Conference Cal Poly San Luis Obispo, 2008 The Best Practice Awards Program is created by the UC/CSU/IOU Energy Efficiency Partnership.
1 Town of Dedham Energy Saving Performance Contracting.
Town of Mountain Village Lighting Projects. ICAST Mission To provide economic, environmental, and social benefits to communities in a way that builds.
SCHOOL OF FOREST RESOURCES BUILDING
ENVIROCENTER PHASE II JESSUP, MD
Redifer Commons Addition & Renovation Project
Grunenwald Science and Technology Building
CAPE & OUR PPN HISTORY IN BUSINESS SINCE 1953, PPN MEMBER SINCE 2014
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Client Name Energy & Water Assessment August 27, 2014
Regional Sales Manager
[PLACEHOLDER FOR DISTRIBUTOR LOGO]
RiverView Condominiums II Chicago, IL
Presentation transcript:

Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation4/13/2010 Upper Dublin High School Construction Project The New Upper Dublin High School Senior Thesis Final Presentation Stephen Kelchaw Construction Management

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Presentation Overview Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 2 of 244/13/2010 Upper Dublin High School Construction Project

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Building Overview Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 3 of 244/13/2010 Upper Dublin High School Construction Project Size: 368,000sf Location: Fort Washington, PA Project Budget: $119.2 Million Pursuing minimum LEED Silver rating Located on the same site as the existing high school

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Building Overview Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 4 of 244/13/2010 Upper Dublin High School Construction Project 4-year construction timeline (Aug. ‘08 – Aug.’12) 2 Phases with multiple sub-phases Major Milestones: December 2009 – Gym/Pool Completion December 2010 – Classroom Wing/Phase I Completion January 2011 – Final demolition of existing high school August 2012 – Phase II/Final Building Completion

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Thesis Theme/Goals Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 5 of 244/13/2010 Upper Dublin High School Construction Project Overall Theme: Impact of implementing sustainable practices and technologies on construction projects Main Goals: Look at sustainability from a CM’s point of view Study the impact of implementing new/additional technologies with a cost and schedule focus Keep in mind the public, school district, and students Take advantage of this opportunity to look at the impact of sustainability on an actual project

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions MAE Requirements Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 6 of 244/13/2010 Upper Dublin High School Construction Project Graduate Class Incorporation: AE 597D – “Sustainable Building Methods” AE 572 – “Project Development and Delivery Planning”

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Analysis I – LEED on Projects Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 7 of 244/13/2010 Upper Dublin High School Construction Project Goals: Study the benefits of pursuing LEED on projects Determine the impact of LEED on schedule and overall costs Take a look at how LEED changes the project structure Why did the UDSD Pursue LEED? Project approved by public referendum Held several town meetings Public pushed for energy efficiency, a healthier facility, and a building that serves as an educational tool

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Analysis I – LEED on Projects Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 8 of 244/13/2010 Upper Dublin High School Construction Project Main Points of Contact: Owner Construction Manager LEED Consultant LEED Checklist and Responsibilities: LEED for Schools, released in 2007 Integrative Design Process Increased amount of paperwork Responsibilities Matrix

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Analysis I – LEED on Projects Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 9 of 244/13/2010 Upper Dublin High School Construction Project Project Structure Changes: Third-party commissioning agent LEED Consultant Energy Modeler No difference in labor crews Additional Costs and Benefits: There aren’t necessarily additional costs LEED provides proof that a building meets initial expectations

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Analysis I – LEED on Projects Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 10 of 244/13/2010 Upper Dublin High School Construction Project Conclusion/Recommendations: Can be implemented without additional costs Integrative Design Approach The only major timeline difference is increased paperwork Divided in Responsibility Matrix Some additional entities may be necessary LEED provides proof that the building was constructed as expected. Beneficial to all construction projects

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Analysis III – Rainwater Collection Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 11 of 244/13/2010 Upper Dublin High School Construction Project Goals: Look into the addition of a rainwater collection system for this school Implement a system that is cost friendly, and will not impact the schedule Initial Observations: This area receives approximately 48” of rain annually Large amount of roof area Large potential for rainwater collection

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Analysis III – Rainwater Collection Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 12 of 244/13/2010 Upper Dublin High School Construction Project Discussion with Owner and CM: Rainwater collection was not considered during design This was mainly due to cost and space There was also a lot done with storm water management and water efficiency This would have been valuable as a learning tool for students

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Analysis III – Rainwater Collection Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 13 of 244/13/2010 Upper Dublin High School Construction Project Rainwater Collection System Attributes: Low space requirements Minimal Cost Visible Educational Solution: RainXchange Rain Barrel by Aquascape, Inc. 75 gallon capacity Can be combined in series $250 per barrel

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Analysis III – Rainwater Collection Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 14 of 244/13/2010 Upper Dublin High School Construction Project Implementation: 4 barrels can be combined for a 300 gallon capacity Based on an average 4in. rain per month, this requires 120ft 2 of roof space Roof can be sectioned off to funnel water into rain barrel through guttering Can be installed after building completion Located in a visible area

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Analysis III – Rainwater Collection Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 15 of 244/13/2010 Upper Dublin High School Construction Project Conclusions/Recommendations: Large-scale rainwater collection is not a feasible idea RainXchange rain barrels are very inexpensive They can be installed post-construction They are relatable for the students and is something they can implement in their own homes

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Analysis IV – Lighting System Analysis Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 16 of 244/13/2010 Upper Dublin High School Construction Project Goals: Research the components of the main classroom lighting system Compare these technologies to other industry lighting systems Compare efficiency between this lighting system and typical lighting systems

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Analysis IV – Lighting System Analysis Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 17 of 244/13/2010 Upper Dublin High School Construction Project Lighting System Components: Occupancy and Daylight Sensors High-output T5 Fluorescent lighting Combination will decrease lighting loads by up to 80% compared to standard switching controls T8 versus T5 Fluorescent: HOT5 cost 3-4 times the price of a T8 fluorescent bulb HOT5 is only slightly more efficient than a T8 Both have a 20,000 hour lifecycle

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Analysis IV – Lighting System Analysis Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 18 of 244/13/2010 Upper Dublin High School Construction Project Added Benefit to HOT5 Fluorescent: Produces much more light than a T8 This will reduce the quantity of lights needed per room The value will increase with the size of the project Conclusions/Recommendations: HOT5 costs much more than T8, but makes it up in performance and quantity of light The combination of elements create a very efficient lighting system

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Lighting/Electrical Breadth Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 19 of 244/13/2010 Upper Dublin High School Construction Project Goal: To find a comparable replacement for the HOT5 fluorescent in terms of cost, energy efficiency, and performance LED Fluorescent Tube: 50,000 hour lifecycle Can be used in the same fixture as the fluorescent lamp Does not require a ballast Consumes much less energy at 12W (compared to 54W)

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Lighting/Electrical Breadth Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 20 of 244/13/2010 Upper Dublin High School Construction Project Easy Installation: Requires bypass of the ballast Simple wiring can be performed by building maintenance Disadvantages: 8-10 times more expensive than HOT5 ($75 each) Much less light output (900 lumens compared to 5,000 for HOT5)

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Lighting/Electrical Breadth Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 21 of 244/13/2010 Upper Dublin High School Construction Project Load Reduction, Cost, Payback Approx. 117 classrooms 6 fixtures per classroom with 4 lamps per fixture $260 per 4-pack of LED Tubes $182,500 total initial cost 3.5 year payback Estimated 17 years total service life

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Lighting/Electrical Breadth Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 22 of 244/13/2010 Upper Dublin High School Construction Project Conclusions/Recommendations: Pros far exceed cons of LED Fluorescent Tubes to HOT5 Initial cost is reasonable, and payback is very quick Large reduction in energy consumption Significantly lower light output than a HOT5 This is not suitable as a direct replacement for the existing fixtures

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Summary/Conclusions Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 23 of 244/13/2010 Upper Dublin High School Construction Project Main thesis goals were met Sustainability was looked at from the standpoint of a construction manager LEED can be a valuable addition to any project Many sustainable technologies exist, but some still need development

 Building Overview  Thesis Theme/Goals  MAE Requirements  Analysis I – LEED on Projects  Analysis II – Geothermal Well System  Mechanical Breadth  Analysis III – Rainwater Collection  Analysis IV – Lighting System Analysis  Lighting/Electrical Breadth  Summary/Conclusions  Questions Questions Stephen Kelchaw – Construction ManagementSenior Thesis Final Presentation - Slide 24 of 244/13/2010 Upper Dublin High School Construction Project Acknowledgements Questions?? OwnerThe Upper Dublin School District Michael Pladus – Superintendent of Schools Brenda Jones Bray – Business Administrator A.E. FacultyAdvisor: Dr. Chris Magent IndustryD’Huy Engineering, Inc. Warren M. Gericke – Senior Project Manager Gilbert Architects, Inc. Brian Good 7 Group Marcus Sheffer – LEED Consultant Aramark Technical Services Chris Skalski – Commissioning Agent Family & Friends Thank you to everyone that helped make this senior thesis possible!