1 Federal Reserve Bank of Boston Case Study
John Yahoodik, Senior Project Manager Federal Reserve Bank of Boston Rick Dorricott, Design Services Manager Energy Investment, Inc.

2 Federal Reserve Bank of Boston
Designed 1972, completed 1976 33 story tower; 5 story low-rise Unique support functions 1,130,000 square feet Steel construction with glass & aluminum facades Steam heating Electric powered chiller cooling

3 Federal Reserve Bank of Boston Project Objectives
Energy efficiency, utility cost reduction Facility improvement, lighting and mechanical systems Environmental management, CFC compliance

4 Federal Reserve Bank of Boston Owner’s Agent: Energy Investment, Inc.
Integrated energy improvement program Chiller replacement program chiller specification and selection system design competitive bidding construction review

5 Federal Reserve Bank of Boston Electric End-Use
General office and banking 5 am - 6 pm weekdays 7 am - 1 pm weekends some 24 hour operation 24,000,000 kWh annual electricity consumption

6 Federal Reserve Bank of Boston Electricity Use
Monthly electricity consumption Monthly electricity demand relatively flat demand

7 Federal Reserve Bank of Boston Natural Gas and Steam Use
Monthly natural gas consumption used for cooking Monthly steam consumption used for heating

8 Federal Reserve Bank of Boston Original Chillers
3 York 1200 ton chillers 0.82 kW/ton R-500 refrigerant chiller 2 on in spring chiller 3 for summer loads chiller 1 used for backup 8 heat recovery chillers tons, 330 tons total R-22 refrigerant kW/ton summer and winter loads heat recovered for hot water

9 Federal Reserve Bank of Boston Chiller Replacement - Logistical Issues
Bank Security On-going operations Time constraints Space constraints Future flexibility Facility location

10 Federal Reserve Bank of Boston Chiller Options Studied for CFC Compliance
Retrofit existing chillers for non-CFC refrigerant Replace with high-efficiency, non-CFC models Steam absorption units Gas-fired units District cooling

11 Federal Reserve Bank of Boston Criteria for Evaluating Options
Reliability, long life Stand-alone entity Independent operation Energy efficiency and performance Life-cycle cost Operation and maintenance considerations Environmentally friendly, CFC compliance

12 Federal Reserve Bank of Boston Chiller Replacement Option Chosen
Primary chillers - 3 Carrier 1200 ton chillers 0.56 kW/ton R-134a refrigerant Heat recovery chillers - 8 Carrier

13 Federal Reserve Bank of Boston HVAC Improvements

14 Federal Reserve Bank of Boston Lighting Improvements
Upgraded fluorescent lighting Specular reflectors High efficiency incandescent lamps New LED exit kits Metal halide retrofit kits Incandescent converted to fluorescent

15 Federal Reserve Bank of Boston Lighting Improvement Results

16 Federal Reserve Bank of Boston Integrated Energy Program
Other energy efficiency improvements help pay for chiller replacement for CFC compliance Shorter overall program payback period

17 Federal Reserve Bank of Boston Project Timeline
8 months for engineering analysis 18 months for project approval 21 months to purchase, design and build

18 Federal Reserve Bank of Boston Five Construction Phases
Remove chillers 2 & 3 Install & activate new chiller 2 & refrigerant monitoring system Remove chiller 1 Install and activate chillers 1 & 3 Remove heat recovery chillers 4 & 5 and install new ones

19 Federal Reserve Bank of Boston Project Results
Still under construction Expect to save 5,300,000 kWh a year Annual $730,000 savings Switch to R-134a, an HFC refrigerant, not scheduled for phaseout Improved lighting and HVAC systems Only a 5 year project payback period