Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.

Slides:



Advertisements
Similar presentations
Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30,
Advertisements

Ag Stock Watering Tank UES Measure Update Regional Technical Forum April 16, 2013.
UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
New Construction Calibration Research Results and Request for Decision Regional Technical Forum March 18, 2014.
Residential Refrigerators and Freezers UES Measure Update Regional Technical Forum October 14, 2014.
Direction on Guidelines Savings Definition Path Results of straw vote and proposed decisions for elements of the savings definition Regional Technical.
Residential Single Family Clothes Washer UES Measure Update Christian Douglass Regional Technical Forum February 18, 2015.
Transformer De-Energizing & Dairy Plate Heat Exchanger Standard Protocol Proposal Presentation to the RTF February 20, 2013.
Residential LED UES Measure Update Regional Technical Forum August 20, 2013.
Review Tabled Agenda Item: Additional M&V Data on Ag Pump VFD Projects Determination of M&V requirements and/or deemed savings Regional Technical Forum.
Variable Frequency Drives (VFDs) for Potato/Onion Shed Fans UES Measure Update Regional Technical Forum April 23, 2014.
Residential Clothes Washers and Dryers Technical Subcommittee Ryan Firestone & Christian Douglass Regional Technical Forum March 10, PM.
Heat Pump Water Heaters Provisional UES Proposal Regional Technical Forum October 4 th, 2011.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
Dairy Milking Machine Vacuum Pump VFD Savings Calculator Follow-up from the last RTF meeting with more field data Regional Technical Forum December 7,
Fan VFD Calculator Development Staff Request for Authorization of Funding from the Regional Technical Forum 28 June 2011.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Advanced Power Strips (APS) Planning UES Measure Proposal Regional Technical Forum August 20, 2013.
Retrofit Doors to Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Direction on Guidelines Savings Definition Path: CONTINUED Remaining Useful Life (RUL) and Measure Interaction Regional Technical Forum February 19, 2014.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Scientific Irrigation Scheduling Provisional Standard Protocol Ryan Firestone Regional Technical Forum February 18, 2015.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
Non-Residential Network Computer Power Management UES Measure Update Regional Technical Forum July 16, 2013.
Pre-Rinse Spray Valve Small Saver UES Measures Regional Technical Forum September 17, 2013.
Scientific Irrigation Scheduling provisional analysis and research plan BPA December 2014.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Power Strips in Commercial Office Applications RTF October 4, 2011.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Oregon ENERGY STAR Homes Measure Update Adam Hadley Regional Technical Forum March 17, 2015.
Energy and Water Savings Presented by Bill Power Power Services, Inc San Mateo County Ag Workshop December 5, 2014.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
N ETWORK PC P OWER M ANAGEMENT June 28, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
Scientific Irrigation Scheduling Provisional Standard Protocol Regional Technical Forum November 19, 2013.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Measurement and Verification of Refrigeration Measures in 4 Grocery Stores in Pacific County Presented to the Regional Technical Forum August 8 th, 2006.
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Extension of Provisionally Deemed Smart Strip in Commercial Applications RTF March 2,
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
Deemed Calculation for Variable Speed Drives on Milking Machine Vacuum Pumps May 7, 2002.
Implementer’s Group June 2015 RTF Meeting Debrief and Upcoming Meeting Prep June 23, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Commercial Clothes Washers UES Ryan Firestone Regional Technical Forum April 14, 2015.
RTF Staff, Subcommittee and Work Updates January 23, 2013.
Scientific Irrigation Scheduling Subcommittee Thursday, August pm – 3pm, PDT.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Power Strips in Commercial Office Applications RTF August 30, 2011.
Scientific Irrigation Scheduling Provisional Standard Protocol Ryan Firestone Regional Technical Forum December 8, 2015.
A Reliable but Simplified Method for Measuring the Savings from Advanced RTU Control Retrofits February 13, 2013 Presentation to: RTF Commercial Rooftop.
Residential Showerheads UES Update Ryan Firestone Regional Technical Forum October 20, 2015.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
ENERGY STAR Commercial Refrigerators and Freezers Regional Technical Forum January 21 st, 2016 Mohit Singh-Chhabra.
RTF Management Updates Jennifer Light Regional Technical Forum January 21, 2016.
Non-Residential Network Computer Power Management Christian Douglass Regional Technical Forum January 21, 2016.
Scientific Irrigation Scheduling provisional analysis and research plan BPA December 2014.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Direct Mail CFLs Ryan Firestone and Carrie Nelson August 30, 2011.
Residential Single Family Clothes Washer UES Measure Update Regional Technical Forum September 16, 2014.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum March 17, 2015.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
Residential Behavior-based Programs Measure Development Update Ryan Firestone Regional Technical Forum March 15, 2016.
Single Family New Construction Measure: Slab Insulation Mohit Singh-Chhabra Regional Technical Forum April 19 th, 2016.
GrocerSmart Standard Protocol Update Regional Technical Forum March 18, 2014.
Presentation transcript:

Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013

Protocol Summary Eligibility[see Protocol document] BaselineSingle speed pump for irrigation without VFD UpgradeInstall VFD set to automatic control mode, remove or disable baseline control mechanism Best Practice Savings Estimate 1.Collect three years of pre metering and one year of post metering on individually metered pump motors or on circuits where upgraded motor load is easily disaggregated (e.g., sharing circuit with small electric motors for center pivot, sharing circuit with another pump with known operating hours). 2.Adjust annual baseline kWh values to reflect hardware measures on the irrigation system, for all years prior to the hardware measure implementation. 3.Determine average annual kWh pre and post installation. 4.Savings = [Average Annual Baseline kWh] – [Post Installation Average Annual Baseline kWh] Simplest Reliable Savings Estimate 1.Pre metering for three years 2.Savings = [Average Annual Baseline kWh] x [Average Project Savings %]

Available Best Practice Data Utility billing data from pre and post metered pumps. – Two years of pre-VFD data (average annual kWh provided) – One year of post-VFD data Data disposition – 95 projects at 7 utilities – Dates, installed between February 2010 and June – Motor Size, 30 HP to 500 HP – Project Cost, $5,000 to $79,000 3

Available Best Practice Data (cont) Analysis – For each site, computed the annual savings and the savings as a percentage of baseline kWh. – Considered the unweighted (all projects equal) and weighted (by baseline kWh) average savings percentage. 4 Savings as a Percentage of Baseline kWh unweightedweighted estimate27%25% n95 90% confidence17%27% lower bound23%18% upper bound32%

Available Best Practice Data (cont) 5

6

Discussion Since precision at 90% confidence is greater than 10%, the protocol should be categorized as “Provisional”. Possible measure interaction in dataset (e.g. irrigation hardware measures). – Proposed protocols allow for additional measures on same metered circuit if estimated savings are accounted for. Proposed protocols allow for multiple equipment on meter and rely on operator estimation of operating hours for significant equipment. Year-to-year variations in operating conditions (crop type, acreage, weather, etc.) are not accounted for at any individual site. – This “measurement error” is expected to average to zero for the population. – Crop type and acreage will be collected during provisional period. Eligibility limited to 30 to 500 HP motors, based on dataset. Can this be extended to 20 HP motors? The percent savings may reduce over time. – This will be something to watch for when making the determination to go to “Proven” category. 7

RTF Proposed Motion: “I _________ move that the RTF approve the Agricultural Irrigation Pump Motor Variable Frequency Drive Standard Protocol in the “Provisional” category, with “Active” status, and a sunset date of April, 2018.”