The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.

Slides:



Advertisements
Similar presentations
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Advertisements

Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
Demands and Requirements for the New Control System for GSI Future Accelerators An Overview U. Krause, S. Richter, P. Schütt.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
FAIR March 20, 2007 D. Krämer GSI/FAIR Division Technical Status: status of layout status of civil engineering items under current discussions status of.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
CCC Meeting Cryogenic Current Comparator in the FAIR Project Overview of FAIR / current status Beam diagnostics work package Tasks and installation locations.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
1 Development of models of intrabeam scattering for charged beams in storage rings E. Mikhaylova Joint Institute for Nuclear Research Dubna, Russia The.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
FAIR Accelerator Controls Strategy
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Progress report for Task SIS100_5 Digital Signal-Analysis Electronics for Beam Position.
Status of the FAIR pbar Source K. Knie May 3, 2011.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
Chinese Contributions to FAIR Hushan Xu Institute of Modern Physics, CAS, Lanzhou
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
ENLIGHT,12/2/20021 Health and Science, can CERN contribute? The Mission of CERN (1954): “The Organization shall provide for collaboration among European.
T. Fleck, GSI, Darmstadt, Germany ICALEPCS Status of the Control System for HICAT at an advanced stage of Commissioning Functions, Restrictions.
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
Introduction to NS-FFAGs and EMMA Rob Edgecock STFC Rutherford Appleton Laboratory.
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Delivery of FAIR In-kind items (feedback from India) Subhasis Chattopadhyay VECC-Kolkata & BI-Kolkata.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
Preparation Phase of the FAIR Project
Status of the FAIR Project
ESS Innovation Procurement Workshop
EGEE Middleware Activities Overview
Status of HESR 18th March Gießen Dieter Prasuhn.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Timing System GSI R. Bär / U. Krause 15. Feb. 2008
FAIR – the Universe in the labororatory
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
Presentation transcript:

The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007

2 Outline of the talk Introduction The international FAIR facility: overview, status of the project, timescale Major technical challenges for the control system Project management issues Controls Strategy first steps, present activities towards a new cs Summary

3 GSI at a glance GSI is a national research center for heavy ion research in Darmstadt, Germany GSI operates a large, in many aspects worldwide unique accelerator facility for heavy ion beams. Research program: nuclear physics (CBM, structure) atomic physics plasma physics material sciences biophysics, medical application (cancer treatment)

4 The international FAIR project Proposal for a major extension to the GSI accelerator facility already in 2001: FAIR project = Facility for Anti-proton and Ion Research FAIR baseline technical report: April 2006 handed to ISC Accepted as "The Project" to be realized with costs notified More than 3500 pages ca authors

5 100 m UNILAC SIS 18 SIS 100 SIS 300 HESR SuperFRS NESR CR RESR Existing facility (in blue): provides ion-beam source and injector for FAIR New future facility (in red): provides ion and anti-matter beams of highest- intensity and up to high energies ESR FLAIR complex rare-isotope production target anti-proton production target EAR The FAIR accelerators

6 SIS 100/300 HESR Super FRS NESR CR Improvements primary beam intensities: factor 100 – 1000 secondary beam intensities for radioactive beams: up to factor ion beam energy: factor 15 Special features intense cooled beams of radioactive beams cooled anti-proton beams up to 15 GeV in-beam targets for experiments with high luminosity New technologies rapidly cycling superconducting magnets (SIS100: 4 T/s) electron cooling with high ion intensities and beam energies fast stochasting cooling systems in storage rings Improvements and special features of FAIR

7 Germany committed funding of costs up to 75%. 25% of funds have to come from non-German partners Project costs: full version ~1190 M€ presently discussed starting version: ~ 940 M€ Project Costs and Structure Contributions will be either in cash or in-kind 94 working packages defined (e.g. cs) no final decision on work-packages up to now, awaiting expressions of interest from partners work-package takers will be fully responsible for implementation, delivery and commissioning

8 Project Status Start of the International FAIR Project recent decision by German Minister Ms. Schavan: start together with all partners that will have expressed their commitment on FAIR Scope of the project start) decided by ISC tomorrow ( ) (presently meeting at GSI) Schedule - building activities start 2008/ first experiments in 2012 (S-FRS) - completion aimed for 2015

9 Major Controls Challenges (1/3) Parallel Operation  important consideration of FAIR is a high degree of parallel operation of different research programs  provide maximum integrated beam time or luminosity  up to 5 different research programs may be served in parallel  constraints: cyro system load, feedback to power grid → sophisticated coordination of the accelerators needed (timing, sequencing)

10 Major Controls Challenges (2/3) High intensity operation / anti-protons  e.g. SIS100: 4x10 13 protons / 5x10 11 Uranium ( 238 U 28+ ) per cycle  special precautions in beam handling needed (low loss budget due to dynamic vacuum effects, safe settings, pilot beam functionality, procedures to safely operate the accelerator chain and to prevent damage to the machine) Fast cycling superconductive magnets  first superconductive accelerator built at GSI  SIS100 is cycling at 4 T/sec  if anything happens (beam loss, quench): need to analyze what happened (→post mortem analysis)

11 Major Controls Challenges (3/3) Timing  all beam transfer in FAIR accelerator chain use bunch-to-bucket transfer mechanism  distributed systems (RF and kickers) need 100 ps synchronicity between any two receivers (→bunch synchronous timing system required) Accelerator Model  implement accelerator physics model to generate settings, tune and trim the machines  consider cross-talk of machines, persistent fields, remanent fields from previous cycles Feedback Systems  beam on target, orbit, tune,...

12 Project management issues Working package "Controls" The development of the control system must be geographically based at the FAIR home institute and must not be a working-package to be taken by a FAIR partner. → controls working package will be an in-kind contribution of Germany (GSI) → coordination of all activities by GSI → clear definitions of scope, responsibilities and deliverables needed Standardization An absolute MUST: strict standardization of Controls and interfaces in particular towards external collaboration partners / work-package takers (full support of FAIR management essential). The GSI Controls group maintains full authority over collaboration partners to impose technical controls frameworks as solution.

13 Control System Strategy (1/2) The present GSI control system is not adequate for the FAIR project. The expected full functionality of FAIR demands a substantial revision of the present system (performance, timing, BD DAQ limits,...) New functions shall not be retrofitted to the present system → a new control system has to be elaborated and tested on several milestones → build substantially on proven principles and solutions of the existing system The present control system (injectors) cannot be replaced (big investment) → will be modernized, obsolete technology replaced → integration of present control system (FE, middleware) into the new architecture

14 Control System Strategy (2/2) No technical solution for the new control system can be presented now. new architecture shall be designed as a decentralized distributed system modular design with well defined interfaces industrial components / technologies shall be used as much as possible uniform frameworks (front-end, application layer) shall be developed and used to simplify development and ease maintenance implement and test the new architecture already with the present accelerators (deploy new architecture as upgrade program later), avoid parallel commissioning of the cs and the machines wherever possible We aim at: learning from the experience of other installations, identify proven solutions and building blocks of other systems identifying areas of cooperation (FE framework, timing, application framework) concentrate on specific and missing functionality

15 Present Activities Control system requirement analysis & system design study (contract with Cosylab) Modernize present system (FE hardware, middleware, porting of application software from OpenVMS to Linux platform) Upgrade programs for present machines UNILAC and SIS-18 for higher beam intensities and higher repetition rates

16 Next Steps / Outlook Evaluate other control systems / part of systems collaboration with CERN: FESA, LSA investigate industrial SCADA system of "slow controls" (cryo controls, vacuum, HV BD, civil construction,...) Interface definitions for devices and sub-systems must be worked out for compiling specification documents for FAIR partners (work- package takers) Start prototyping on the following fields: - RT equipment control - timing system - application layer software (Java)

17 Summary The international FAIR project is going to be started on November A new accelerator control system for FAIR will be elaborated and implemented by GSI, integrating the present control system. The FAIR project is a challenge, both on the technical side (machine, control system) as well as on the management and the organization. On the technical level, the control system is not yet defined, wait for ICALEPCS 2009

18 FAIR – Facility for Antiproton and Ion Research Austria China Finland France Germany Greece India Italy Poland Spain Sweden Russia Great Britain Romania Thank you for your attention