Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June 2011 LICENSING PROCESS FOR BELENE NPP: CURRENT STATUS AND NEXT STEPS Tinko Ganchev Head of Department.

Slides:



Advertisements
Similar presentations
ENEF WG Risks / Bernard Fourest 12 September 2012 PRAGUEBRATISLAVA ENEF WG RISKS Current activities of the SWG Nuclear Installation Safety Bernard Fourest.
Advertisements

Pakistan Nuclear Regulatory Authority
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Licensing of Nuclear Power Plants in Pakistan
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
THE NUCLEAR WASTE DIRECTIVE: CONTENTS AND SOME REFLECTIONS ON ITS PEER-REVIEW MECHANISM Inter Jura Congress - INLA 21 st October 2014, Buenos Aires Nuria.
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
Outcome of the EU Nuclear Safety Stress Tests Andrej Stritar Chairman, ENSREG.
IAEA International Atomic Energy Agency LICENSING OF RADIOACTIVE WASTE MANAGEMENT FACILITIES Luc Baekelandt Safety of radioactive.
Energy Nuclear stress tests and follow up in Europe Brussels, 25 May 2012 Nina Commeau Adviser to the Deputy Director-General in charge of nuclear energy.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Role of the TSO in Public Information/ Debate Openness, Transparency.
Group Presentation to 27 th - 29 th May 2009 International Nuclear Forum BULGARIAN NUCLEAR ENERGY – NATIONAL, REGIONAL AND WORLD ENERGY SAFETY.
I st Workshop on issues and trends from the European IRRS missions, 22 – 23 January 2014, Brussels Authorization Improvements: Establish within the regulatory.
1 ESTABLISHMENT OF REQUIREMENTS Module “National legislation and licensing” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Bulgaria.
Improve nuclear safety and reduce environmental impact – international and national practice Roundtable “Environmental Safety: Scientific and Technical.
IAEA ANSN RWMTG National Workshop: Application of IAEA Methodology and Tools for the Safety Case and Safety Assessment for Predisposal Management of Radioactive.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
PH 8.01/99 - Seminar, Brussels, 9 November 2005 PH 8.01/99 – Seminar on “Dissemination of PHARE projects description and results” Overview of BG PHARE.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Organization of the peer review process of stress tests in the European context “stress tests of NPP Dukovany and NPP Temelín - evaluation of safety and.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Sergii Iegan Division on Safety Analysis of Nuclear Facilities
International Atomic Energy Agency M. El-Shanawany IAEA Technical Support & Capacity Building Programme M. El-Shanawany Department of Nuclear Safety &
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
Oversight of Licensees Human & Organizational Factors in Bulgaria Oversight of Licensees’ Human & Organizational Factors in Bulgaria Technical Meeting.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
2-6 November 2015 Lisbon, Portugal Regional Meeting on Applications of the Code of Conduct on Safety of RR's 1 Some aspects of the Code of Conduct on the.
EC Approaches Workshop 2010 Kiev1 Requirements for Site Selection and Final Documentation Approval under the Bulgarian Legislation.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
IAEA TSO-Conference, April 2007, Aix en Provence 1 Independent technical and scientific advice for regulatory decision making L. Hahn, GRS International.
International Atomic Energy Agency Implementation of a Risk-Informed Approach into the Legislative and Regulatory Framework SNRCU Annual Topical Meeting.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
DEVELOPMENT AND MAINTENANCE OF THE TECHNICAL AND SCIENTIFIC KNOWLEDGE BASE NECESSARY FOR TSO.
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
International Topical Conferences on Nuclear Safety, IAEA, June 6-9, 2017, Vienna Workshop 2: An Introduction and Further Explanation on Design Extension.
BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components Case Studies Version 1.0, May 2015.
János Krutzler Hungarian Atomic Energy Authority
STRESS TESTS and TAIWAN PEER REVIEW PROCESS
THE ROLE OF TSOs IN THE NATIONAL SAFETY ORGANIZATION
Role of the TSO in Public Information/ Debate Openness, Transparency Technical support to regulatory body for the new NPP (OL3) project Keijo Valtonen.
Approach to Practical Elimination in Finland
IAEA Safety Guidance on Licensing and Oversight Activities
Complementarity of deterministic and probabilistic approaches
Diversity analysis for advanced reactor design
Armenia Training and Tutoring Feedback
Communication and Consultation with Interested Parties by the RB
International Topical Conferences on Nuclear Safety, IAEA, June 6-9, 2017, Vienna Analyses of DEC Events in the Czech Republic and their Implementation.
RCF Plenary Session 21 September 2018
Presentation to the EPREV Lessons Learned Workshop
Session Name: Lessons Learned from Mega Projects
Legal and Regulatory Framework for Nuclear Installations in IRAN
IAEA Technical Support & Capacity Building Programme M. El-Shanawany
Version 1.0, May 2015 SHORT COURSE
Presentation transcript:

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June 2011 LICENSING PROCESS FOR BELENE NPP: CURRENT STATUS AND NEXT STEPS Tinko Ganchev Head of Department Bulgarian Nuclear Regulatory Agency

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Content of the presentation 1.Introduction 2. Legal requirements on licensing and safety assessment 3. Regulatory review of Belene NPP TD, ISAR and PSA 4. Additional analyses and discussions of selected safety issues

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Introduction

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Main Advantages of AES-92 Design- Generation III LWR Provision of a “core catcher” for severe accident cases, leading to a core melting and reactor pressure vessel breach Provision of a “core catcher” for severe accident cases, leading to a core melting and reactor pressure vessel breach Long design operation life time: 60 provisional years of operation Long design operation life time: 60 provisional years of operation Substantial reduction of core damage frequency : ~10 -7 /y Substantial reduction of core damage frequency : ~10 -7 /y

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Main Advantages of AES-92 Design- Generation III LWR Two individual completely independent reactivity control systems Two individual completely independent reactivity control systems Redundancy for all safety functions provided by the use of both active and passive safety systems Redundancy for all safety functions provided by the use of both active and passive safety systems Use of a special double containment, designed to withstand a large range of internal and external events Use of a special double containment, designed to withstand a large range of internal and external events

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Legal requirements 2. Legal requirements on licensing and safety assessment

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Legislation applied to licensing new nuclear facility Primary legislationPrimary legislation –EU legislation, Conventions, Constitution of the Republic of Bulgaria –Act of the Safe Use of Nuclear Energy (Nuclear Act) –Energy Act –Environment Protection Act –Act on the Territorial Structure Secondary legislationSecondary legislation - 22 regulations for the application of the Nuclear Act - 22 regulations for the application of the Nuclear Act

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Nuclear Act: Types of Authorisations °permit for site selection °order for approval of the selected site °permit for design °order for approval of the technical design °permit for construction °permit for commissioning °licence for operation °licence for decommissioning

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Main NRA regulations applied during licensing Regulation for the procedure for issuing licenses and permits for safe use of nuclear energy (2004)Regulation for the procedure for issuing licenses and permits for safe use of nuclear energy (2004) Regulation on ensuring the safety of nuclear power plants (2004)Regulation on ensuring the safety of nuclear power plants (2004) Regulation on basic norms of radiation protection (2004)Regulation on basic norms of radiation protection (2004) Other relevant regulations issued under the Nuclear ActOther relevant regulations issued under the Nuclear Act

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Regulation on Ensuring the Safety of NPPs Design limits and safety assessment Design limits and safety assessment Acceptance criteria for the barriers;Acceptance criteria for the barriers; Radiological and other technical acceptance criteriaRadiological and other technical acceptance criteria Frequency of a large radioactive release into the environment that requires undertaking of immediate protective measures for the population shall not exceed 1E-6 events per NPP per year.Frequency of a large radioactive release into the environment that requires undertaking of immediate protective measures for the population shall not exceed 1E-6 events per NPP per year.

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Regulation on Ensuring the Safety of NPPs: Safety Analysis and Assessment Safety Analysis and Assessment Plant safety shall be analyzed using deterministic and probabilistic methods to verify and confirm the established design basis and the effectiveness of defense in depth arrangementPlant safety shall be analyzed using deterministic and probabilistic methods to verify and confirm the established design basis and the effectiveness of defense in depth arrangement Postulated initiating events (PIEs) shall be also analyzedPostulated initiating events (PIEs) shall be also analyzed Computer codes, analytical methods and plant models to be used in the safety analysis shall be verified and validated, uncertainty of the results shall be quantifiedComputer codes, analytical methods and plant models to be used in the safety analysis shall be verified and validated, uncertainty of the results shall be quantified

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Safety Margins and Uncertainty Safety Margins and Uncertainty

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Probabilistic Safety Criteria of European Utilities (EUR): Probabilistic Safety Criteria of European Utilities (EUR): more restrictive than the criteria of the IAEA more restrictive than the criteria of the IAEA EUR Probabilistic Safety Targets: EUR Probabilistic Safety Targets: - Core damage frequency: CDF<1 E-5 - Core damage frequency: CDF<1 E-5 - Frequency of release>limited impact (LI): 1 E-6 - Frequency of release>limited impact (LI): 1 E-6 - Early or large release frequency (ELRF): 1 E-7 - Early or large release frequency (ELRF): 1 E-7 IAEA Probabilistic Safety Targets for future plants (INSAG 3, 1999) - CDF: 1E-5 per reactor year - CDF: 1E-5 per reactor year - LRF: 1E-6 per reactor year - LRF: 1E-6 per reactor year Examples of international safety and reliability criteria

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Regulatory review of TD, ISAR and PSA for Belene NPP

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Current Licensing Status April 2008 Application for Design Approval Review and Assessment of Submitted Documentation

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Main documents subject to assessment Technical Design (TD)Technical Design (TD) Interim Safety Ananalysis Report (ISAR)Interim Safety Ananalysis Report (ISAR) Probabilistic Safety Analysis (PSA)Probabilistic Safety Analysis (PSA) -Amount of the technical documents submitted: > pages -Amount of the technical documents submitted: > pages

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Internal expert opinion Within the BNRA frames According to approved program - stages, experts, terms Review and assessment by consultants ISAR – Riskaudit International (GRS & IRSN) Chosen technical design solutions – EnproConsult Ltd. EnproConsult Ltd. PSA - IAEA in the frame of national TC project BNRA review and assessment process:

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June In-depth analyses of selected safety issues by Riskaudit In-depth analyses of selected safety issues by Riskaudit 1.Large Break Loss of Coolant Accident (LOCA) Study 2.Core-Catcher Features and Performance Investigation 3. Coupled ATHLET-COCOSYS analysis for a BDBA LOCA DN80 4. ATHLET BDBA analysis Small break DN80 and total loss of power for 24 hours 5. COCOSYS accident analyses for NPP Belene 6. Structure mechanical analyses of the containment behavior 7. Analysis of the resolution of the IAEA Safety Issues for WWER- 1000/V-320 Nuclear Power Plants for Belene NPP Review and assessment of the ISAR (Rev.0)

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Total amount of experts’ report – 1000 pages There are no issues that could not be resolved Classification of the Review Classification of the Review recommendations : recommendations : Class 1 – essential for safety “Must do” Class 2 – having an effect on safety “Should do” Class 3 – without significant effect on safety “Nice to have” Results from the review of TD and ISAR (Rev. 0)

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Review and assessment of the Technical Design EnproConsult Task: Review and assessment of chosen design solutions Geotechnical issues Primary circuit Hermetic construction Safety related I&C systems (including software) Control Systems Systems for management of severe accidents Reliability of chosen main structures Analysis of the fire risk and protection measures Analysis of the measures for ensuing seismic safety Measures for ensuring radiation protection

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Review and assessment of TD and ISAR – Rev.2 New contracts with Riskaudit and EnproConsult signed in May – July 2010 Task 1: Review and assessment of the Revision 2 of TD and ISARTask 1: Review and assessment of the Revision 2 of TD and ISAR Task 2: Performance of part 2 of research oriented activities and generic oriented in-depth studies for selected safety issues and accident scenarios identified in the course of TD and ISAR review with a special focus on the novel passive safety systemsTask 2: Performance of part 2 of research oriented activities and generic oriented in-depth studies for selected safety issues and accident scenarios identified in the course of TD and ISAR review with a special focus on the novel passive safety systems

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Review and Assessment of the PSA National TC project supported by the IAEA Assessment of PSA: –Preliminary Mission – February 2009 –IPSART Mission for assessment of PSA Rev. 0 - May Final Report - August 2009 –Follow-up IPSART Mission, PSA Rev. 2 - October Final Report - February 2011 Importance ranking of findings: - “HIGH” - “MEDIUM” - “LOW” - “N/A”

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Review and Assessment of the PSA Conclusions of the PSA review: Large number of findings of the IPSART Mission has been resolved in the PSA Report Rev.2 Some of the PSA issues can only be resolved during the detailed design stage when the required details will be known and available

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Additional analyses and discussions 4. Additional analyses and discussions of selected safety issues

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June BNRA internal review of consultants’ recommendations High level decision-making group has been created in the BNRA: Task: To review and assess all the recommendations made by the BNRA experts and by the consultants and to take a decision about their importance for the current licensing stage - approval of the design Task: To review and assess all the recommendations made by the BNRA experts and by the consultants and to take a decision about their importance for the current licensing stage - approval of the design Results: Class 1 recommendations (must be resolved before approval of the plant design): Results: Class 1 recommendations (must be resolved before approval of the plant design): RiskAudit – 83 RiskAudit – 83 EnproConsult – 31 EnproConsult – 31 Total – 114 Total – 114 List of missing Topical reports has been prepared

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June NRA internal review of consultants’ recommendations Further analyses and discussions needed: Further analyses and discussions needed: Novel passive safety systems: - Molten Core Retention System (“Core catcher”); - Molten Core Retention System (“Core catcher”); - Passive secondary Heat Removal System (PHRS); - Passive secondary Heat Removal System (PHRS); - Quick Boron Injection System (QBIS) - Quick Boron Injection System (QBIS) - Containment structure and PHRS - airplane crash impact - Containment structure and PHRS - airplane crash impact Dual use of some systems for normal operation Systems and components classification Submission of additional Topical reports

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June EU (ENSREG) “Stress tests” analysis of Belene NPP Stress test”: targeted reassessment of the safety margins of NPPs. “Stress test”: targeted reassessment of the safety margins of NPPs. Technical scope: a) Initiating events: earthquake; flooding; b) Consequence of loss of safety functions from any initiating event: loss of electric power, including station black out; loss of ultimate heat sink; combination of both; c) Severe accident management issues: loss of core cooling function; loss of the cooling function of the fuel storage pool; loss of containment integrity

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June EU (ENSREG) “Stress tests” analysis of Belene NPP Progress report Final report Licensee report August 15, 2011 October 31, 2011 National report September 15, 2011 December 31, 2011 The final National report will be subject to a peer review process The EC will present a progress report to the EU Council for the meeting scheduled on 9 th December 2011 and a consolidated report for the meeting scheduled for June Timeframe:

Bulatom Annual Forum, Bulgaria, Varna - Riviera, 2-4 June Next licensing steps Design approval order Construction permit Commissioning permit Operating License