Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.

Slides:



Advertisements
Similar presentations
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Advertisements

Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Installation. Indoor Unit Installation Typical Installation.
TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
Installation. Indoor Unit Installation Typical Installation.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
All information contained herein is confidential and may not be disclosed to any third party without the written consent of Interlogix Europe & Africa.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
CEDAR Support Structure and PMT Test Peter Sutcliffe 13 th July 2011 CERN via EVO.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Update on new alignment kit update 20/3/ Complete table based on a standard table (2400 x 1200 x 150) and a half table (2400 x 600 x 150).
Design Progress Allen Ellis 18-September
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
Beamline Readiness Review - Hutch Beamline Microdiffraction March 28, 2006.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Stavelet 09 and Storage/Assembly/Survey Frame Progress Report Brookhaven National Laboratory David Lynn, Susan Duffin, Anatoly Gordeev, Ken Sexton Yale.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
BM&N STS ladders assembly in VLHEP
Installation Walkthrough Image Guide
ATLAS Internal ID Service Integration
Update on Module Mounting on Staves and Stavelets and a description of how the new system will work 11/7/11.
Update on module mounting on staves and stavelets 15/3/11
Reminder of Stave250 Tooling Design
Equipment for Assembly – UK Experiences
Adjusting Tilt and Turn Inswing Door or Window
Module/Ladder Assembly
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Update on alignment kit and stave 250 frame M.Gibson (RAL) 1

Overall photo of the installation. and one bridge structure Alignment laser light strip for pin hole illumination Prototype stavelet frame from QMUL One bridge structure

Two bridge structures sitting adjacent to each other at the correct spacing. one can see the Y and the combined X and theta adjusters Y adjuster Combined X and Theta Fixed lower bridge Moveable upper bridge to which is fixed the Y stage and vacuum jig

Detail of one bridge structure sitting over a prototype stavelet This space required for side mounted SMD version

Detail of under granite store Under granite store with one storage pod completed. Awaiting more bits from OM

Stave frame clamp base 6 Fixed base fulcrum Lifting screw Awaiting the clamp arms

Basic Vacuum Jig Components 7 Top plate Bottom plate Edge supports One of three vacuum cups and connectors Two of 4 load springs Bottom plate Pillar to link jig to Y stage from underneath Floating vacuum connection from lower jig to outside world Ball joints

Free state of jig 8 Fixed plate to provide X,Y and theta Lifting plate to give Z At maximum extension ball is entirely within the top plate Contact to stave surface Silicon edge to provide compression to on detector

9 At typical compression extension ball is visible

Items still being worked on Awaiting delivery of the required wall components.(OM at RAL) Awaiting delivery of the required storage components (OM at RAL) Ivan is working on the software but see ‘current problems’ The two part self aligning jigs are progressing, hopefully sticking and alignment trials next week 10

Current Problems Unfortunately the aluminium section that supports the optics has a CTE that is too big. (It is also in Y the critical direction. The plan is to replace it with a simple fabricated Carbon Fibre (CF) box section using Pultruded CF square tubes and commercially available CF sheet. Sketch almost ready for construction. 11

Frame for stave 250 Proposed stave 250 frame basic outline Flexibles to accommodate changes in length as satve and frame are cooled Swaglok self sealing quick release couplings Movable clamp to hold stave cooling pipes

Working drawing soon to be passed out for comment to wire bonders, electrical testers etc. Frame has top and bottom covers and the entire frame sits in an insulated box for testing purposes.

Other box related issues Material for the outer insulative box is at RAL. Aluminium faced panel with 25mm thick insulation (same as the current box but thicker).Waiting for final sign off on stave 250 frame to get dims correct. Will have a double glazed window. Will be fabricated at RAL just like all the other boxes. 14

Module Shipping I gather from Peter (P) that we will be receiving modules in at least 2 types of shipping boxes for stave 250. With frame and without frame I encourage you to make only ONE solution for the real thing. Because.... A) This minimises the chance of operator error (two boxes = double the chance of a mistake) B) we will need only ONE solution to the how to get from box to vacuum jig problem C) It will speed up the process. D) We should try and reduce the handling steps ‘cos they are always fraught! E) At least one of these current solutions means no electrical checking prior to mounting! 15