ITS Tutoring Testing Staff Rm Library Storage Janitor Tiospaye Elev Tiospaye Workroom / Files IE Secretary Mfg E Lab HFE Lab Design Studio Design Studio.

Slides:



Advertisements
Similar presentations
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Advertisements

Julie Thompson MEDT 7477 Dr. Cooper Spring  Network/Wiring Diagram for Media Center  Network/Wiring Diagram for middle and high school  Report.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
DAY12 UNIT 15: DRYER OUTLETS AND LIGHTING CIRCUITS FOR THE LAUNDRY, POWDER ROOM, REAR ENTRY HALL AND ATTIC.
Detailed Room Guides Select from the list of Willard Building technology classrooms to view more detailed operating instructions. The instructions are.
Competency: Draw Floor Plans Objective: Demonstrate the rules and standards for electrical fixture placement.
Competency: Draw Electrical Plans
Slides on Drawing Lecture-1
Engineering 2 Surveys Introduction. The UCSC Campus in Santa Cruz.
Faculty Assembly Report Information Resources November 2010.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
1935 The first Higher Education Institute in Ajara was founded in Batumi, offering 2 years program in 4 faculties The institute was named after.
Types of Drawing Kitchen DesignElectrical Plan.
Treaded Case Study Computer Networks 2002 Daire Sheriden Ronan Monaghan Mark Gilmore.
Business Template. We are T.E.A.M. Technology "Connections with cost efficiency in mind“ Cost efficient design for an expanding business. Made the most.
Exploring CAD - Architectural Electrical Design. OVERVIEW TWO COMPONENTS –POWER –LIGHTS Power to House –Meter –Distribution Panel Box.
1 Telecom Cabling Patch panels, cabinets and raised floors.
Thesis Presentation April 13, 2004
HVACR116 – Trade Skills Mechanical Drawings.
OPES Media Center Our Media Center is approximately 2,000 square feet including a teacher workroom, two AV production rooms, two offices and two storage.
April Rogers ITEC 7132 Fall  The school serves over 1600 students who come from a variety of cultural backgrounds.  Table 1: Table 1 shows the.
Natick Public Schools Technology Update September 11, 2006 Dennis Roche, CISA Director of Technology.
ACU LIBRARY Click to view the slides ….. B Level – Ground floor Circulation Reference Information Commons Library Staff Toilets.
SunTrust Tenant Improvements June 30, Background Current Situation Proposed Work Cost of Proposed Work Questions Presentation Outline.
Prepared by Dr. Hazem Abu-Orf, University of Palestine International Design Studio III Lecturer 6 Project II Criteria deemed essential for the design of.
Section B Inventory Process and Forms. General Inventory Actions %Getting Started Set inventory goals and objectives %Who District Program Manager Site.
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
Back in Circulation Again 2012 Increased Efficiency through the Study of Moving Materials.
A Chance for Every Child! 1.  Serves approximately 500 students, kindergarten through fifth grade  Serves 70+ faculty members  One full-time media.
1 Levine Hall (Upenn) Photo Analysis. 2 Very nice stairwell.
Updated Technology Purchase Plan Purchases to be split between the remaining funds in ($52,000) and the capital request for ($60,000) Projects.
Wilston State School The New Library. Old library The old library has been reclaimed as an assembly and performance space.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
1 SCS Building Committee. 2 The SCS Building Committee Members: Guy Blelloch Randy Bryant Sharon Burks Peter Lee Jim Skees Manuela Veloso.
OLA Library Building Award. Interior Views of Library Entrance Major Public Services Position Typical User Areas Public Spaces – Existing Light Only Major.
11/19/2015 IENG 471 Facilities Planning 1 IENG Lecture 01 Introduction to Facilities Planning.
Spencer High School – School Network The Muscogee County School District utilizes a wide area network (WAN) with all school connecting to a data center.
THIS IS WITH CARLIN BRIGHT Miscellaneous Orthographic Views Which Drawing Is It? Which Drawing Is It? II Past Units
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord.
Rationale for Equipment E mail for a copy of this specific document, it was not part of the PowerPoint…
AT – 201 Introduction to Architecture Dan Trent August 28,
COMMUNICATIONS AND CONTROL SYSTEMS. Interior Designer must know: Client’s priorities How space will be used Where equipment is located Location of phones,
The School Of Forest Resources Building University Park, Pennsylvania Chris Hoyman The Pennsylvania State University Architectural Engineering Lighting/Electrical.
 Where the family sleeps, rests, and bathes  Takes up about 1/3 of the house  Should be in the quietest part of the house  Should be on the south.
LAN WAN MDF IDF Networked Clients Main Distribution Frame Server room/MDF Intermediate Distribution Frame Server Tech Room.
Cobb County School District’s (CCSD) Lost Mountain Middle School has a Windows 2007a Client/Server fiber optic network with a star topology. The network.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
Drafting 2 (Arch) Quiz Review #3 Quiz Review. 1.Dashed lines that follow the counters in a kitchen floor plan most likely represent: A dishwasher Upper.
Example of a LAN Last Update Copyright 2009 Kenneth M. Chipps Ph.D.
How to Build a LAN Last Update Copyright 2007 Kenneth M. Chipps PhD 1.
Seonyeong Heo Dept. of CSE, POSTECH
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
SmartSuites: An Introduction.
*Plug in the CAT 5 cable to the internet drop
Electrical Diagrams.
Competency: Draw Floor Plans
Floor Plans.
From Lobby Entrance: Circulation Desk with proposed café area to left
G063 - Distributed Databases
One point Grid Method.
Architect’s Scale 1/4” = 1’-0”
How Computers Work.
Competency: Draw Floor Plans
Physics 109 Lab Room 3124 Chamberlin Hall Power Outlet Configuration
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
When I saw there was a facilities redesign project I was excited
Competency: Draw Floor Plans
IT Information for Graduate Students
Presentation transcript:

ITS Tutoring Testing Staff Rm Library Storage Janitor Tiospaye Elev Tiospaye Workroom / Files IE Secretary Mfg E Lab HFE Lab Design Studio Design Studio Util. IE Faculty IE Faculty IE Faculty IE Faculty IE Faculty IE Faculty IE Faculty IE Faculty Storage IIEMech Rm Rest Rm Rest Rm Student Circulation Space IE Dept. Head / Faculty Standard Testing Room

Can wall be split into two movable partitions (move doors to room corners) to create potential conference room flexibility? Attach door frame to column for increased equipment space Please explain reasoning for offset door … again? Align door with N-S Hall for equipment moving ease. (Add 2’ more from column.)

These door locations need to be updated before drawing release.

Potential to use this entrance for lighting control on weekends? These lights must have separate switch to avoid SmartBoard glare. Potential for closet lighting? These door locations need to be updated before drawing release.

Six duplex 120V 15A connections needed for CIM cell control. One 240V 30A connection needed for cell conveyor. Ceiling drops possible? Additional duplex 120V 15A connections needed at these locations. Outlets NOT needed at these locations. Additional duplex 120V 15A connections needed at back side of these columns. Possible to have 120V 15A cord reel from ceiling? These door locations need to be updated before drawing release.

Data port needed at this location. Six wired data ports connections needed for CIM cell control. One data port needed for lab server. Are ceiling drops possible? Wired data ports needed at these locations for work cell computers. Wired data ports needed at these locations for HFE Lab computers. These door locations need to be updated before drawing release. Data port (student printer) needed at this location.

Direction of future expansion (Long-Term) Direction of future lab expansion (Mid-Term) M.S. IE (Near Term) ITS Testing waiting / conference room (Mid-Term) Testing Staff Rm Standard Testing Room Library Storage Janitor Tiospaye Elev Tiospaye Workroom / Files Mfg E Lab HFE Lab Design Studio Design Studio Util. IE Faculty IE Faculty IE Faculty IE Faculty IE Faculty IE Faculty IE Faculty IE Faculty IE Dept. Head / Faculty Storage IIEMech Rm Rest Rm Rest Rm Student Circulation Space M.S. IE (Mid- Term) IE Secretary

Manufacturing Engineering LabActive Learning Lab (CB 110)