Korridor X PLUS A RAILWAY ASSOCIATION ALONG PAN-EUROPEAN TRANSPORT CORRIDOR X www.kx-plus.com ATTRACTING MORE TRAFFIC TO CORRIDOR X Thomas Wimroither Secretary.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

Strengthening Your HR Capacity The Government of Canada Perspective
Intermodality in the area of Záhony Judit Thomka Regional Development Holding Ltd. Usti Nad Labem 17th April 2009.
From Policy to Practice: Recommendations of the White Paper Ralf Hanatschek, International Bureau of the BMBF Ljubljana, June 13, 2008.
Government's Office for Slovenians Abroad Komenskega 11, SI-1000 Ljubljana tel: +386 (0) fax: +386 (0)
Events by LUKA VIDMAR Treasurer of BEST BEST PARTNERS ROUND TABLE 26 January 2007 Turin, Italy.
The Styrian S-Bahn project - more public transport for the region DI Werner Reiterlehner Fachabteilung 18A, Austrian Province of Styria.
EESC HEARING Sustainable development of the EU Transport policy and TEN-T The practical example: PP17 Brussels 26 April 2011.
ICT for Energy Efficiency
GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
NALAS General Assembly December Bucharest, Romania Solid Waste Management Task Force Activities Report.
Serbia - Bosnia and Herzegovina Cross-Border Programme Istanbul
1 China Country Report FINAL INTERNATIONAL WORKSHOP ON RURAL ICT DEVELOPMENT Regulatory Framework.
CEFTA 2006 Renata Vitez Director
South East European Centre for Entrepreneurial Learning Bruxelles, Belgium 31 March 2011.
EU funds Operational Program National co-funding Priority axes Schemes Projects by Institutions Projects by NGOs Projects by Bulgarian Companies Subcontractors.
EU – ACP PROGRAMME FOR SCIENCE AND TECHNOLOGY INNOVATIONS AND CAPACITY BUILDING (PSTICB) 9 ACP RPR 61.
Implementing Scientific Outlook on Development in all-round way and Work Together for the Future of Chinese Aviation Industry IMPLEMENT SCIENTIFIC OUTLOOK.
1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
DMITRY MACHERET First deputy Chairman of the Russian Railways Joint Scientific Council, Doctor of Economic Sciences, Professor 17 October 2012 Russia –
The Present and Prospect for Chinese Railways Transit Transport Vice President: Lin Zhonghong Economic & Planning Research Institute Chinese Railways April,
INTERMODADRIA Supporting intermodal transport solutions in the Adriatic area Kick-Off Meeting 7-8 February 2013 MARCHE REGION ROAD SYSTEM AND STATE PROPERTY.
Coordinating communities of practises towards SD REC’s experience Kenty Richardson Director for International Relations & Strategic Development Incheon.
Completing the EU internal energy market IFIEC, 22 November 2011
GIE Reverse Flows Study Revers Flows inside the SSE Region Vaclav Vocilka GIE Executive Secretary GRI SSE SG Vienna, 16 October.
L’Infra, une activité au cœur de la SNCF INFRASTRUCTURE French Highspeed on South East TGV line: 25 years of evolution Jean-Paul BALENSI Vice-president.
OPERATIONAL PROGRAMME ON “TRANSPORT” 2007 – 2013 Vessela Gospodinova Deputy minister of transport Nearer and closer.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
ARGE Korridor X Goals and Tasks Version: June 2008 ATTRACTING MORE TRAFFIC TO CORRIDOR X.
The EU Rail Freight Corridors in the context of freight transport on the Europe-Asia landbridge Edyta Jaszczuk-Jezierska Member of the Management Board.
Nedim Begovic, Regional Railway Expert Railway Infrastructure th April 2015, Belgrade SEETO Comprehensive Network Development Plan 2015.
The Process of Including Pan-European Corridor X (Xa) in the Rail Freight Corridor Network (in Line with Regulation 913/2010/EU)
Integration of Pan-European Corridor X to the Network of Rail Freight Corridors How to Convert Pan-European Corridor X into a Railway Axis of Prosperity.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
8th Meeting of the Working Group for the improvement of border crossings along the Pan-European Corridor X Belgrade, Republic of Serbia
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
Agenda Item 4: Activity Report – Progress since the last meeting of the Group Technical Secretariat Pan-European Transport Corridor X Aristotle University.
Rail Baltica RETURN TO EUROPE IN NEW QUALITY
Financing possibilities for implementation of the European Union Strategy for the Baltic Sea Region: different solutions INTERACT Point Turku 14 October.
IMPRINT-EUROPESeminar, October 2003, Budapest 1 Some Information Aspects of Railway Infrastructure Charging in Czech Republic ing.Robert Číhal CSc.
The stages of promotion and implementation of a high-speed line project in Romania Adrian DRAGOMIRESCU Head of Department for planning and monitoring activities.
Chart 1 Why Intermodal Traffic Volume in Germany (More Than) Doubled Within 10 Years! Rainer Mertel KombiConsult GmbH, Frankfurt am Main
2012 On track for more!. Ministry of Transport and Communications Avinor AS (airports) Public Road Administration Norwegian Coastal Administration Train.
Activity Report of the Technical Secretariat and the Steering Committee for Pan- European Corridor X Technical Secretariat Pan-European Transport Corridor.
SWG AGRO-FOOD Cluster manager profile Sofia, November 25th, 2010.
Bicycle transport developments How to become a bicycle friendly settlement? György Kukely PhD. business director Terra Studio Ltd
THE NEW TRANS-EUROPEAN TRANSPORT NETWORK A CORE NETWORK: BLUEPRINT FOR 2030.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
STATE POLICY AND PERSPECTIVES FOR DEVELOPMENT OF THE RAILWAY INFRASTRUCTURE MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
H\projects\controls\ekdilosi\tecnoman\ ppt Prospects of drafting Prospects of drafting Black Sea Ring Highway Black Sea Ring Highway Master Plan.
SEETO Comprehensive Rail Network Development
“South East Europe Alliance for Railway Innovation” (SEESARI)
Sectoral Operational Programme on Transport Coordination of Programmes and Projects Directorate 2 October, 2006 Ministry of Transport.
Conference organized by: Union for the Mediterranean High Level Conference on the financing of the future Trans-Mediterranean Transport Network (TMN-T)
ECMT/UNECE Seminar on Intermodal Transport between Europe and Asia: Opportunities and Challenges Barry Cable Director, Transport and Tourism Division United.
1 ERFA Annual Event Brussels, Welcome. Irmtraut Tonndorf ERFA Chair.
Via Nordica 2008 Development of Main Road Networks both in the Baltic States and Poland Valdis Laukšteins Director of Technical Division SJSC Latvian State.
SEETO Investment Report 2016
The SEESARI initiative – “From vision to action“
Financing possibilities for implementation of the European Union Strategy for the Baltic Sea Region: different solutions INTERACT Point Turku 14.
Vice President: Lin Zhonghong Economic & Planning Research Institute
Maria Price, DPhil. (Oxon.) Head of EU Policies and Public Affairs
THE SELECT COMMITTEE ON LOCAL GOVERNMENT AND ADMINISTRATION
The intermodal logistics capacity in the region of Záhony
Feasibility study on infrastructural interventions in Port of Split
Enabling multi-modality and efficient freight logistics
Projects is financed By South Baltic Cross-border
Aleksandar Nikcevic, Principal Banker
Digital Innovation Hubs – An overview Parallel session in Agri-Food Working Committee Bilbao, 28 November 2018 Annita Kalpaka, Policy Analyst JRC Unit.
Presentation transcript:

Korridor X PLUS A RAILWAY ASSOCIATION ALONG PAN-EUROPEAN TRANSPORT CORRIDOR X ATTRACTING MORE TRAFFIC TO CORRIDOR X Thomas Wimroither Secretary General of the Association EU-Strategy for the Danube Region – Bratislava, April 20th, 2010

2 Area of Activity - Corridor X ATTRACTING MORE TRAFFIC TO CORRIDOR X

3 Vision - Mission - Action Our Vision Our vision is to enhance the attractiveness and quality of the transport routes that connect people and markets from Central Europe to South Eastern Europe and the Asian continent. Our Mission We connect and strengthen our regions by selective market and research projects to ensure that people and goods in Europe, which is growing together, can be transported safely, economically and quickly to their destinations. ATTRACTING MORE TRAFFIC TO CORRIDOR X

4 The Purpose of the Association Korridor X PLUS ARGE Korridor X (AKX) had been acting on Corridor X from the year 2001 until the follow-up association Korridor X PLUS was founded on December 16th, 2008 in order to push railway subjects on Pan-European Corridor X in close co-operation between the railway organisations in order to generate and carry out market-oriented projects with the knowledge of 6 railways in order to collectively represent common activities and targets of the members and to implement them efficiently in order to attract more traffic to Corridor X ATTRACTING MORE TRAFFIC TO CORRIDOR X

5 OVERALL OBJECTIVE OF KORRIDOR X PLUS IS TO ATTRACT MORE FREIGHT AND PASSENGERS TO CORRIDOR X Market Project (MP) – Portfolio: MP 1Cutting Running Times MP 2Corridor X Product Catalogue MP 3Corridor X Network Access Description MP 4Assessment and Use of Market Potentials MP 5Assessment of Available Infrastructure Capacity MP 6Co-ordination of Infrastructure Investments MP 7Cutting Stops in Border Stations MP 8Establishing One Stop Shops (OSS) ATTRACTING MORE TRAFFIC TO CORRIDOR X

6 Current (Market) Projects MP 1:Cutting Running Times Achievement of satisfying running times (Salzburg – Thessaloniki max. 36 hrs., Salzburg – Halkali max. 48 hrs.) MP 4:Assessment and Use of Market Potentials Attraction of additional traffic on Corridor X MP 6:Co-ordination of Infrastructure Investments Members act in favour of a common position on infrastructure investments; definitions of infrastructure projects MP 7:Cutting Stops in Border Stations Shortest possible stops in border stations; project managed by project leader Serbian Railways ZS MP 8:Establishing One Stop Shops (OSS) Coordinated approach to customers on Corridor X EUROPTIRAILS (European Train Monitoring and Reporting) Up-to-date train information on Corridor X and on other European transport axis ATTRACTING MORE TRAFFIC TO CORRIDOR X

7 Market Project Highlights and Results MP 1:Running times have already been cut (train-related): Between Thessaloniki and Salzburg from 49 to 44 hrs. (target 36 hrs.) and between Halkali (Turkey) and Salzburg from 73 to 63 hrs. (target 48 hrs.) MP 2+3:Publication of a Corridor X Network Access Description and a Corridor X Product Catalogue 2008 since 2008 (updated at least once a year) MP 4:2008 New trains:Zeebrugge–Ljubljana (and v. v.) 2008 Planned:Wels–Istanbul Halkali (and v. v.) Nuremberg–Istanbul Halkali (and v. v.) Thessaloniki–Unna/Bönen (and v. v.) Judenburg–Radinac (and v. v.) as well as a train pair between Vienna resp. Wels and Belgrade MP 7:Border stops at the Bulgarian/Serbian border Dragoman/Dimitrovgrad cut down by more than 50 percent in December 2006 ATTRACTING MORE TRAFFIC TO CORRIDOR X

8 Highlight MP 5 Corridor X Capacity Profile in due consideration of the actually possible running speeds ÖBB SZ HZ ZS NRIC MZ OSE > 100% Capacity Utilization > 80% und < 100% Capacity Utilization < 80% Capacity Utilization LEGEND The Capacity Utilization is calculated over a 24 hour operation. All double-track sections include the critical direction only. Data currently unavailable (to be provided) Section out of Operation ATTRACTING MORE TRAFFIC TO CORRIDOR X Finalized 2007

9 Korridor X PLUS Members Full Members GKB Graz-Köflacher Railways HZCroatian Railways NRICBulgarian National Railway Infrastructure Manager ÖBBAustrian Federal Railways - Railnet Austria Inc. SZSlovenian Railways ZSSerbian Railways Collaboration with Since foundation of AKX:PETC XSteering Committee of Pan-European Corridor X Since 2006:TCDDTurkish State Railways ZFBHRailways of the Federation of Bosnia and Herzegovina ZRSRailways of the Republic of Srpska as well as with former members of ARGE Korridor X (AKX) ATTRACTING MORE TRAFFIC TO CORRIDOR X

10 Korridor X PLUS Structure General Assembly Supreme decision body of Korridor X PLUS comprises all association members. Board of Directors (January 2009 – January 2011) President:Arnold Schiefer, Board Member of ÖBB-Infrastruktur AG Vice Presidents:Marijan Klaric, Board Member of HZ Croatian Railways Holding Milcho Lambrev, Director General of NRIC Bulgarian Railway IM Joint Office in Vienna Thomas Wimroither, Secretary General Zorana Djokic, Administration and Market Project Manager ATTRACTING MORE TRAFFIC TO CORRIDOR X

11 Topics for Investment Projects Project targets Project topics MoresafetyHigherqualityHigherspeeds EUROPTIRAILS - International Train Monitoring and Reportingx Technical improvement or even elimination of LEVEL RAILWAY CROSSINGS xx Correction of PLATFORM CONFIGURATIONS (construction of over- and underpasses for passengers) xxx Construction of LOOP LINES in order to separate freight traffic from passenger traffic in bigger stations xxx Modernization of SIGNAL BOXES and TRAFFIC CONTROL UNITS xx Improvement of TELECOMMUNICATION FACILITIES xx Elimination of selected long-existing SPEED RESTRICTIONS hampering traffic flows to an undue extent xx … HOT-BOX DETECTORS … AUTOMATED TRAIN CHECKPOINTS... ……… ATTRACTING MORE TRAFFIC TO CORRIDOR X

12 ATTRACTING MORE TRAFFIC TO CORRIDOR X THANK YOU FOR YOUR ATTENTION For further information please visit our homepage and dont hesitate to contact us!