Environment Department Experience Sharing & Lessons learn during Implementation of ESMF 2013-14 Muhammad Younis Zahid Muhammad Younis Zahid District Officer.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Transport Study to support an impact assessment of the Urban Mobility Package on SUMPs CoR Meeting June 13 DG MOVE.
Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Training Workshop for Financial Intermediaries and Implementing Agencies May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World Bank.
Environmental Legislation in Pakistan – Compliance Perspectives Ibad ur Rehman Deputy Director (Projects) Cleaner Production Institute.
EXPÉRIENCE SHARING AND LESSONS LEARNT REGARDING ENVIRONNEMENTAL & SOCIAL MANAGEMENT FRAMEWORK (ESMF) IMPLEMENTATION IN Mian M. Latif Akhter DDO.
Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT.
Contractor Safety Management
Introduction to World Bank Safeguard Policies and Project Preparation
Contractor Management and ISO 14001:2004
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
ENVIRONMENTAL MANAGEMENT PLAN
ISO EMS CONTRACTOR OVERVIEW May /26/10ISO EMS CONTRACTOR OVERVIEW TRAINING ISO EMS OVERVIEW TRAINING Contents What is ISO
Opportunities for RAC Participation. Three Part discussion General presentation; Example of oil and gas decision making; and Panel Discussion of RAC involvement.
ZHRC/HTI Financial Management Training
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
Lessons Learnt and Experience Sharing 2 Presented By Rabia Mehfooz Assistant Director (Engineering) WASA Multan.
FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012.
KENYA PORTS AUTHORITY HEALTH, SAFETY AND ENVIRONMENT
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Environmental Impact Assessment (EIA): Overview
WORKSHOP ON EXPERIENCE SHARING AND LESSONS LEARNT DURING IMPLEMENTATION OF ESMF IN Presented By SADAT ALI ASSISTANT DIRECTOR WATER QUALITY WASA.
New Solid Waste Management System in Lahore (Technical Aspects)
Punjab Cities Governance Improvement Project (PCGIP)
Environmental auditing
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
PRESENTED BY: RAHIMA NJAIDI MJUMITA 3 RD APRIL 2012.
Health and Safety Policy
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Lessons Learnt and Experience Sharing BY JAMIL AHMED BASRA DISTRICT OFFICER ROADS GUJRANWALA 2 ENVIRONMET AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) UNDE.
Copyright © February 2003 Green Gain Consulting (Pty) Ltd. All rights reserved. Green Gain Consulting (Pty) Ltd Air Quality Legislation Workshop Thursday,
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Experience sharing and Lessons learnt during implementation of Environment & Social Management Framework (ESMF) Engr. DILSHAD AHMED Deputy District Officer,
POVT Managing Authority A sound Internal Control System A challenge for the period.
Experience Sharing and Lessons Learnt regarding Environmental & Social Management Framework (ESMF) Implementation in Presented By Mr. Shafaqat.
1 CAI-Asia China Project CAI-Asia China Project Inception Workshop October, 2005 Beijing PRC.
Information Security 14 October 2005 IT Security Unit Ministry of IT & Telecommunications.
Cartagena Protocol on Biosafety Cartagena Protocol on Biosafety And India’s Obligations By Desh Deepak Verma Joint Secretary, Ministry of Environment and.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Training on the Facilitation of Environmental & Social Management Framework (ESMF)
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
School Site Council (SSC) Essentials in brief An overview of SSC roles and responsibilities Prepared and Presented by Wanda Chang Shironaka San Juan Unified.
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
PROGRESS AND WAY FORWARD JANUARY 05, 2015 Punjab Cities Governance Improvement Project (PCGIP) 2.
1. 2 Punjab Cities Governance Improvement Project (PCGIP) WASA GUJRANWALA Progress on Year 3 DLI’s 5 January 2015.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
5. Presentación general de la iniciativa REDD+ SES 5. Presentation of the REDD+ SES Initiative.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
ISO Session 3 Environmental Management and Ethics in Management.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
BLM Decision Making Process
Environmental Safeguards
UNIDO-GEF Industrial Energy Efficiency Project in Macedonia
EIA approval process, Management plan and Monitoring
Health and Safety Policy
GCF’s Environmental and Social Safeguards
NCRPB Environmental & Social Management System (ESMS)
Consultation & Participation
GIZ-SIDBI Responsible Enterprise Finance Programme
Relationship between World Bank and Romanian EA requirements
Strategic Environmental Assessment (SEA)
EIA- Concept and Practice
Environment Safeguards
Environment Safeguards
Introduction Introduction of the trainer
Environmental Impact Assessment EIA
Presentation transcript:

Environment Department Experience Sharing & Lessons learn during Implementation of ESMF Muhammad Younis Zahid Muhammad Younis Zahid District Officer Environment Lahore Ph. D Scholar, Environment Management M Phil (Environmental Sciences) M.Sc. Applied Environmental Science PGD in Environmental Laws Diploma in Environmental Management Diploma in Health, Safety & Environmental Resource Person TMA Bylaws Certified Dengue Vector Control Expert from AIT Thailand / Srilanka Ph:

Punjab Cities Governance Improvement Project Government of Punjab with the financial assistance of the World Bank is implementing Punjab Cities Governance Improvement Project (PCGIP) in 5 cities of Punjab. Under PCGIP Environmental and Social Management Framework (ESMF) is prepared by the Government of Punjab to ensure that the development schemes implemented by the CDGs/City entities are environmentally sound and socially acceptable. The CDG/ city entity will conduct environmental and social screening and categorize each scheme on the basis of nature and size.

BACKGORUND Capacity constraints exist regarding integration of environmental and social safeguards in the Urban Planning process No generalized concepts were present regarding environmental regulatory framework and its implications Contractors were unaware and not bother to cater the environmental& social attributes tobe followed during execution of schemes No formulation of separate guidelines for contractors No concepts was found to train workforce working at site Environmental baseline data and it monitoring was ignored

Only Economic benefit are considered. Evironment was totally ignored factor. Due to exclusion of Environmental Factors in Development Schemes, the public complaints have been increased tremendously Each Development Project had several problems as: o Emission of Dust particles o No alternative routes during road construction o No safety signs, guide signs etc o No Personal Protective Equipments (PPEs) to workers o No Sprinkling of water on construction site o No maintenance / check on construction vehicles

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) Serves as a guiding document to address the social and environmental issues during projects implementation covering following phases at: Planning and design Construction and rehabilitation Operation and maintenance Decommissioning and closure phases.

OBJECTIVES VERSES ACHEIVEMENTS ObjectiveAchievements To provide a screening process that will identify and assess the potential environmental and social impacts of the project Prior to scheme execution, Environmental & social screening was carried out with safeguards team. To frame guidelines and procedures to deal with environmental and social impacts associated with the implementation of this project. Environmental & social Management Plan was formulated as per defined scope of work and was implemented To ensure that schemes to be designed and implemented are environmentally sound and socially acceptable Consecutive monitoring was imparted during scheme execution

To ensure that the schemes that come under PCGIP comply with the national regulatory and WB policy frameworks; and Documentation and formulation of ESMPs was conducted under light of WB policy. At the same time, approval procedure was followed a per national regulatory framework To internalize and integrate the environmental and social management procedures and processes in the routine projects of CDGs and city entities. Environmental & social attributes were integrated in outsourcing projects for E-1 category To build capacity regarding environmental & social context Capacity building sessions were arranged in different forms: one to one session, group discussion, contractors and labors training

ESMF Applications EEPs Schemes (World Bank Funded) ADP Schemes (CDG Funded) 4.01 POLICY ( Environment Assessment) Repair & maintenance schemes Review of EIA/IEE Regulations 2000 Punjab Environmental Protection Act, 2012 New schemes(Development schemes)

COMPONENTS OF ESMF Follow ing are main components to be covered under this framework: Capacity Building/Training Programs on environmental and social aspects Environmental & Social Screening Preparation of Social and Environmental Management of all the schemes ESMF Implementation and Monitoring Third Party Validation (TPV) Grievance Redress Mechanism

CAPACITY BUILDING AND TRAINING Capacity Building Sessions were arranged for: Regarding orientation to ESMPs Executing body Contractors ****Sessions were comprised of one to one discussion and group discussion

Orientation Sessions

For Executing Body E Two days training program was organized in Lahore dated Dec., 2013 at MPDD. About 27 participants attended this training

For Contractors Meeting with Contractor regarding Implementation of ESMPs were held on 07 June June 2014 & August, 18, 2014.

Environmental & Social Screening First step of the environmental and social management procedure. Each scheme during its preparation stage will be screened with respect to environmental and social considerations.C:\Users\sughra\Desktop\hyperlink\SCHEMES SCREENING.docxconsiderationsC:\Users\sughra\Desktop\hyperlink\SCHEMES SCREENING.docx

CATEGORIZATION CategorizationClassification verses Impacts E-1Schemes that are expected to cause major environmental impacts E-2Schemes that are expected to cause moderate environmental impacts E-3 Schemes that are expected to cause negligible environmental impacts hen be termed as environmentally benign” S-1 Schemes that will impact more than 40 households and are expected to cause significant negative social consequences S-2Schemes that will impact less than 40 households and are expected to cause significant negative social consequences affecting local inhabitants S-3Schemes are not expected to cause adverse significant social impacts

Preparation of Social and Environmental Management of all the schemes For each scheme with E2 category, The Environmental and Social Management Plan (ESMP) was prepared according to the World Bank Policy Guidelines; environmental and social laws; and policies of Government of Punjab (GoPb). There were 22 no. of schemes for which ESMPs were prepared and categorized as E-2. All ESMPs were enclosed in bidding documents.E:\letters\ESMP APPROVAL.pdfE:\letters\ESMP APPROVAL.pdf

ESMF IMPLEMENTATION & MONITORING

Third Party Validation TPV of ESMF was held in Lahore on Aug 2014 Nine schemes were validated against defined objectives of ESMF and to monitor the environmental& social compliance of the projects

ESMF Committee  Under PCGIP a committee has been prepared for the effective implementation of ESMF with due promotion of sustainable development and to generate the cohesion among city entities regarding development & non development schemes  ESMF committee comprised of following members:  EDO (W&S) Chairperson  ESSSConvener  DO (Planning)Member  DO (Environment)Member  DO (Social Welfare)Member  Social Mobilizer(WASA)Member  M&E Specialist Member  FM Specialist Member

Functions of ESMF Committee Conduct site visits of schemes under PCGIP and ADP. Environmental & Social Screening of schemes as per ESMF guidelines. Facilitation in preparation of IEE/EIA/ESMP document. Monitoring of Environmental and Social factors of schemes. Participation of training / workshops conducted under umbrella of ESMF. To ensure the compliance of environmental laws and regulations.

Screening, Monitoring & Public Consultation of Projects To check in which category a project falls a screening form has been prepared screening form A comprehensive checklist has been prepared to evaluate environmental parameters.checklist A public consultation form has been prepared to get the opinion of public about the projectpublic consultation form

MOJOR DIFFERENCE Constitution of ESMF Committee notified by DCO Lahore Environmental & Social Screening of Development Schemes Preparation of Environmental Documents (IEE, EIA & ESMPs) Review of Environmental Assessment Reports and submission to DG EPA for issuance of NOC Implementation of national regulatory framework and inclusion in development schemes Monitoring & evaluation of schemes as per defined objectives of ESMF Third party validations of schemes to evaluate the environmental & social compliance Public Involvements to address the grievances and to avoid conflicts during scheme execution Trainings arrangements for contractors and lab force Separate allocation of environmental management cost included in total cost of the project Ensuring the practices with due introduction of environmental& social attributes for health safety Public access to inform executing body regarding any non-compliance

Environment Benefits Formulation of site specific baseline data at project site during scheme execution Engagements of EPD certified Lab. to conduct lab. analysis regarding ambient air quality, noise and water analysis Consecutive water sprinkling to control dust pollution

Social Benefits Public involvement in scheme execution (pre- during and post construction phase) Provision of alternate routes Display of safety signs Public access obstructions

Water Sprinkling

PROVISION OF DUST BIN

Clearance of one site for normal movement

PROVISION OF FIRST AID BOX

Display of safety signs

Provision of alternate routes