Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT.

Similar presentations


Presentation on theme: "Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT."— Presentation transcript:

1

2 Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

3 Contents Schemes of F.Y 2013-014 Implementation of ESMF 2013014 Lesson Learnt and Experience Sharing

4 ESMF SUMMARY OF FY 2013-14 4 Total ADP Schemes Total EEP’s Schemes Application of ESMF Categorization of Schemes 30 % of schemes Target Achieved (%) E-2 for EEPs schemes E-3 for EEPs schemes E-3 for ADP schemes 1019 0613Nil0866%

5 NONO NAME OF SCHEMEEXPENDITURESTATUS 1 Repair and general overhauling of 5 sludge pumps (10 cusec) discharges each zone III 8.393Completed 2 Repair of general overhauling of 15 cusec pump at Khiali disposal station zone II 2.151Completed 3 Replacement of delivery pipes and other works at disposal stations Alam Chowk, no. 1 garjakh, mughal pura and liaqat chowk lift station zone iii 3.554Completed 4 Repair/const. Of additional manhole chambers and gully grating at papular nursery, amir park, shaheen abad g.T road, civil line, wahdat colony, peoples colony, arfat colony and farid town in zone I 1.443Completed 5 Replacement of sewer lines and construction of additional manholes at katcha khiali road, takia masoom shah, gala mehar bagoo wala, mehar noor wala, darbar qadria and allied areas zone II 1.910Completed 6 Replacement of old sewer lines in dhullay, shaheenabad and gurunanak pura i/c of const. Of additional manholes in zone III 4.596Completed 7 Desilting of sewer lines with winching machine along jinnah road from d.C road under pass to purani abadi jagna 2.988 Completed 5 SCHEMES OF FY 2013-14

6 NONAME OF SCHEMETOTAL EXPENDITURESTATUS 8 Mechanical desilting of sewer lines through winching machine at bajwa road, hafizabad road and paru road 2.785Completed 9 Mechanical desilting of sewer lines through winching machine at hafizabadroad and gondalanwala road 2.465Completed 10 Repair of utility vehicles4.858Completed 11 Restoration of water supply network street no. 32 "y" block peoples colony and repair of 21 nos. Water works zone I 5.201Completed 12 Restoration of water supply network and renovation of 22 nos. Water works zone II 3.975Completed 13 Restoration of water supply network along g.T road small state no. 1 and renovation of 19 nos. Water works zone III 5.297Completed 14 Repair of generators2.193Completed 6 SCHEMES OF FY 2013-14

7 NONAME OF SCHEMETOTAL EXPENDITURESTATUS 15 Rehabilitation of drain along G.T Road Easternside and dc road zone I 2.381Completed 16 Rehabilitation of drain along western bypass from Alam Chowk to awan chowk and g.T road zone II 6.232 Completed 17 Rehabilitation of strom water drainage from general bus stand to 30ft bazar shaheen abad zone III 2.898Completed 18 Manhole covers and frames7.000Completed 19 Articles for sewerage & water supply8.700Completed 7 SCHEMES OF FY 2013-14

8 ESMF  An Environmental & Social Management Framework (ESMF) is prepared under PCGIP to ensure the development schemes implemented by the CDGs/WASA/City entities to be environmentally and socially sustainable.

9 APPLICATION OF ESMF  Environmental and Social Screening of PCGIP and ADP Schemes was carried out.  Environment and Social Management Plans:  Prepared Environmental and Social Management Plans (ESMPs) E-2 category Schemes  EPA, Punjab accorded approvals of these ESMPs  ESMP cost was included in cost estimates, Procurement plan and Bidding Documents

10 Environmental and Social Monitoring:  ESMF Committee conducted environmental and social monitoring of E-2 schemes  Site visits, photographic records, public consultation at each step, Lab analysis and development of monitoring report)

11 SOME PICS DURING SURVEY MONITORING

12

13

14

15

16

17

18

19 Third Party Validation  For an independent assessment of the ESMF implementation, was held in Gujranwala on 3-5 July 2014. TPV team visited following 06 schemes of WASA-G. 1. Restoration of water supply Network along G.T Road Small State No 1 and Renovation of 19 Nos water works Zone-III. 2. Replacement of sewer lines and Construction of Additional Manholes at Katcha Khiali Road, Takia Masoom Shah, Gala Mehr Bagoo wala, Mehr Noor wala, Darbar Qadria and allied areas Zone-II. 3. Replacement of old sewer lines in Dhullay, Shahenabad and Gurunanak Pura i/c of Construction of Additional Manholes in Zone-lll 4. Restoration of water supply Network Street No. 32 "Y" Block Peoples Colony and Repair of 21 Nos water works Zone-I. 5 Restoration of water supply Network and Renovation of 22 Nos Water Works Zone-II. 6. Repair / Construction of Additional Manhole Chambers and Gully grating at Popular Nursery, Amir Park, Shaheen Abad G.T Road, Civil Line, Wahdat Colony, Peoples Colony, Arfat Colony and Farid Town in Zone-l

20 Lesson Learnt and Experience Sharing  Environmental and social Survey of M&R and ADP schemes by ESMF Committee which was not carried out before ESMF  Environmental and social monitoring of schemes by ESMF Committee during execution, which was not done before PCGIP  Public consultation before, during and after execution schemes  GRM and complaints Management System  Awareness about Punjab Environmental Protection Act 1997 (Amended 2012), Environmental Impact assessment and (EIA) and Initial Environmental Examination due to Workshops and training sessions organized by the Urban  WASA, Gujranwala conducted Environmental Assessment of JICA funded project "Up-Grading Mechanical System for Sewerage and Drainage Services in Gujranwala with the support of The Urban Unit and cases has been submitted with EPA, Punjab.  Environmental Impact Assessment of 04 ADP schemes is in progress  To resolve Gender issues raised during public consultation, there is need of Female staff