Introduction Seoul, South Korea, 13 th December 2006 Ignacio Soler Atos Origin.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

international strategic management
4. May 2007 Workshop on Dynamic Service Level AgreementsPage 1 Dynamic SLA Negotiation in BREIN Bastian Koller High Performance Computing Center Stuttgart.
A Case Study in Movie Post-Production Kostas Kavoussanakis Project Manager, EPCC
Before on-boarding, board-rooming OGF22 Boston, 26 th February 2008 Julia Wells, Atos Origin SAE
Enterprise Computing Strategies This gig is bigger than grid: from HPC to service orientation John Barr Research.
The SLA cluster OGF20, May 2007 Igor Rosenberg ATOS ORIGIN
©2006 University of Southampton IT Innovation Centre and other members of the SIMDAT consortium A SIMDAT Perspective on Grid Standards and Specifications.
Information Society and Media Directorate-General Unit Grid Technologies NCP Info Day Call6 - Brussels, 24 January – International Co-operation.
1 2 nd Shanghai, 19/02/06 Architecture for Next Generation Grids Kostas Tserpes, NTUA Shanghai, 20th of February 2006.
19/02/2006 The NESSI European Technology Platform 2nd Workshop – Shanghai Feb 2006 Stefano De Panfilis R&D Laboratories Engineering Ingegneria.
XtreemOS IP project is funded by the European Commission under contract IST-FP XtreemOS: Building and Promoting a Linux-based Operating System.
Information Society and Media Directorate-General – European Commission Unit Grid Technologies Second workshop – 20 February 2006 – Shanghai,
The Next Generation Grid Kostas Tserpes, NTUA Beijing, 22 of June 2005.
Advanced Grid Research Workshops through European and Asian Co-operation The Project Bruno Le Dantec
© Fraunhofer Institute SCAI and other members of the SIMDAT consortium Data Grids for Process and Product Development using Numerical Simulation and Knowledge.
Advanced Grid Research Workshops through European and Asian Co-operation The Project
Designing Services for Grid-based Knowledge Discovery A. Congiusta, A. Pugliese, Domenico Talia, P. Trunfio DEIS University of Calabria ITALY
Information Society and Media Directorate-General Unit Grid Technologies Workshop - Beijing, June EU Grid Research – Priorities.
Research Infrastructures WP 2012 Call 10 e-Infrastructures part Topics: Construction of new infrastructures (or major upgrades) – implementation.
1/1 Competitiveness OP - Portugal Implementing business support schemes at regional level (I) Nelson de Souza.
Digital Agenda for Europe Supporting Innovation Bror Salmelin Advisor to the DG European Commission
DG INFSO- Grid Research & Infrastructures: W. Boch, M. Campolargo 1 Delivery of Industrial-strength Grid Middleware: establishing an effective European.
Regional and national initiatives in support of European Technology Platforms Dr. Fiona Williams Chairman, eMobility steering board
Version 3 Südtirol – Alto Adige Applied Spatial Management Co-financed by DG Regional Policy, Innovative Actions Unit 1 Clusterdevelopment within CAN Südtirol.
CIP ICT PSP WP2012 Constituency Building Workshop Brussels, 24 January 2012 Objective 1.3: Open innovation for Internet-enabled services and next generation.
Public B2B Exchanges and Support Services
Research Councils ICT Conference Welcome Malcolm Atkinson Director 17 th May 2004.
Current status of grids: the need for standards Mike Mineter TOE-NeSC, Edinburgh.
SWITCH Visit to NeSC Malcolm Atkinson Director 5 th October 2004.
OMII-UK Steven Newhouse, Director. © 2 OMII-UK aims to provide software and support to enable a sustained future for the UK e-Science community and its.
KIPO’s Policies on IP Marketplace Choongjae Lee Intellectual Property Promotion Division KIPO (Korean Intellectual Property Office)
The role of NESSI in the Future Internet Frédéric Gittler, HP Labs NESSI SC Chairman NEXOF-RA Chief Architect.
Customer Experience Solutions. Delivered. 1 BANK 2.0 Making Banks Successful in the Era of Engagement Banking.
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
Public Thomas Mejtoft Exjobbsredovisning Teknisk fysik, Umeå universitet
Tools to help the development of Innovative firms Thessaloniki Technology Park 1 Dissemination of Innovation: Clusters, Regional Institutions and Telematics.
1 NEST New and emerging science and technology EUROPEAN COMMISSION - 6th Framework programme : Anticipating Scientific and Technological Needs.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Chapter 2 Using Information Technology for Competitive Advantage Copyright 2001, Prentice-Hall, Inc. MANAGEMENT INFORMATION SYSTEMS 8/E Raymond McLeod,
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
Chapter 12 Strategic Planning.
Implementing Strategy in Companies That Compete in a Single Industry
European Framework Programme for Business FP7 UK Technology Strategy Board Driving Innovation FP7UK NMP and PPP 2011 Calls Alastair McGibbon National Contact.
Advancing Alternative Energy Technologies Glenn MacDonell Director, Energy Industry Canada Workshop on Alternatives to Conventional Generation Technologies.
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
The Preparatory Phase Proposal a first draft to be discussed.
Project Presentation.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
From GEANT to Grid empowered Research Infrastructures ANTONELLA KARLSON DG INFSO Research Infrastructures Grids Information Day 25 March 2003 From GEANT.
Presenter: Sabine Roller Coordinator: Hubert Hérenger High Performance Computing Center Stuttgart (HLRS) Business Experiment.
Grids in Industry: Lost in Transition? Mike Boniface IT Innovation Business Track: Solutions.
| Collaboration at Rural Business Approach.
SEEK Welcome Malcolm Atkinson Director 12 th May 2004.
AKOGRIMO Integration of Grid services with mobile technologies; validation in e-health, e-learning and disaster management areas CoreGRID European Grid.
Information Society and Media Directorate-General Unit Grid Technologies NCP Info Day Call5 - Brussels, 02 June – Advanced Grid Technologies,
Grid Business EGEE’07 business track Budapest, 2 October 2007 Csilla Zsigri
NESSI at a glance Josep Martrat ATOS ORIGIN EGEE 1st Industry Day. Paris, 27 th April 2006.
SSA:-COMPANY PROFILE: System Software Associates, Inc. (SSA) is founded in 1981 and has a headquarters in Chicago, USA. It has branches in more than 91.
Towards Successful Grid Business Models with Efficient Value Chains Prof. Dr. Katarina Stanoevska mcm Institute – University of St. Gallen
Overview of IST 6FP Call 2/2003 Grid Projects Marian Bubak, Piotr Nowakowski Academic Computer Center CYFRONET AGH Cracow, Poland.
Josep Martrat ATOS Research & Innovation ATOS ORIGIN EGEE 1 st Industry Day Paris, 27 th April 2006
EC Review – 01/03/2002 – WP9 – Earth Observation Applications – n° 1 WP9 Earth Observation Applications 1st Annual Review Report to the EU ESA, KNMI, IPSL,
GRIDSTART a European GRID coordination attempt Fabrizio Gagliardi CERN.
“From GRID research to GRID business” Francesco Giglio
Bob Jones EGEE Technical Director
Ian Bird GDB Meeting CERN 9 September 2003
EGEE support for HEP and other applications
2.6.5 – International Co-operation
Presentation transcript:

Introduction Seoul, South Korea, 13 th December 2006 Ignacio Soler Atos Origin

Business Experiments in GRID 2 Overview of the session Welcome Overview Project Objectives 18 business experiments (the) Repository Project Implementation Plan Structure Asian relationships

Business Experiments in GRID 3 Main objective The main objective of the Business Experiments in Grid (BEinGRID) project, which has recently been selected for funding by the European Commissions Grid Technologies F2 Unit, is to foster the adoption of the so-called Next Generation Grid technologies by the realization of several business experiments and the creation of a toolset repository of Grid middleware upper layers. BEinGRID will undertake a series of targeted business experiment pilots designed to implement and deploy Grid solutions in a broad spectrum of European business sectors (entertainment, financial, industrial, chemistry, gaming, retail, textile, etc). Eighteen business experiments are planned in the initial stage of the project with a second open call for proposals in the latter stages. Secondly, a toolset repository of Grid service components and best practise will be created to support European businesses that wish to take-up the Grid. To minimise redevelopment of components, BEinGRID will deploy innovative Grid solutions using existing Grid components from across the European Union and beyond.

Business Experiments in GRID 4 BEinGRID related projects in FP6 Datamining Grid OntoGridInteliGrid K-WF Grid CoreGRID six virtual laboratories UniGridsHPC4U Provenance NextGRID service architecture Akogrimo mobile services SIMDAT industrial simulations data, knowledge, semantics, mining KnowArc Chemomen tum A-WareSorma platforms, user environments Specific support actionIntegrated projectNetwork of excellenceSpecific targeted research project g-EclipseGrediaGridComp QosCosGrid Grid4all AssessGrid GridTrust trust, security Grid services, business models ArguGrid Grid GridEcon Nessi-Grid Challengers Degree BREIN agents & semantics XtreemOS Linux based Grid operating system supporting the NESSI ETP & Grid community BeinGrid business experiments EchoGrid

Business Experiments in GRID 5 Project Data Sheet Type of project: Integrated Project Project coordinator: Mr. Santi Ristol (ATOS ORIGIN) Project start date: 1st June 2006 Duration: 42 months (Nov 2008) Budget: 24.7 M Euros Max EC contribution: 15.7 M Euros (63%) Consortium: 75 partners Effort: 2713 PM (226 PY,65 P, h) The mission of BEINGRID is to Exploit European Grid middleware by creating a toolset repository of Grid services from across the Grid research domain and to use these services to deliver a set of successful business experiments that stimulate the early adoption of Grid technologies across the European Union.

Business Experiments in GRID 6 The Chasm Main Street The tornado The Bowling Alley Niche Marketing Innovators Early Adopters (visionaries) Early Majority (pragmatics) Late Majority (conservatives) Laggards (skeptics) Grid Technology Adoption Life-cycle Grid Science Computing Next Generation Grid Enterprise Applications Service Oriented Utility for the Knowledge Economy Grid Enterprise Infrastructure (on-demand) BEinGRID bowling Initial Market

Business Experiments in GRID 7 BEinGRID bowling alley – 18 Business Experiments

Business Experiments in GRID 8 BE 01 - Computational Fluid Dynamics and Computer Aid Design BE01: Use of Computational Fluid Dynamics (CFD) techniques for simulation of airflow within aircrafts or vehicles, forming the baseline for a number of scenarios and applications, including: –reliable and optimized simulation of aerodynamics and aeroacoustics –the exploration of particle or virus transfer through the ventilation systems of aircraft or a cars. –reliable and optimized simulation of fuel circulation –fire and smoke simulation in cargo compartments of aircrafts Partnership ICCS/NTUA : Grid technology provider – BE Coordinator Icon Computer Graphics SA : End user Open CFD : End user This Grid pilot will make grid-enable a CFD application into a new computational & data intensive and collaborative platform based on Gria middleware and GridSphere

Business Experiments in GRID 9 BE02 - Business Workflow Decision Making Film industry undergoing period of rapid change from celluloid to digital processes Goal –To develop Grid solution to assist digital film production process –Focus on improving data management and transfer of digital film data during filming –Hence improve business workflow and decision making Partners –EPCC – major EU supercomputing centre – leader of OGSA-DAI project –The Hat Factory Ltd – digital film grading and finishing – leading exponent of digital film industry in UK –Jo Dunton & Co Ltd – specialist in equipment and services rental to film industry – current flagship project Harry Potter 5 18 month project will use OGSA-DAI and Globus Toolkit V4.

Business Experiments in GRID 10 BE03 – Visualization & virtual reality A demanding user A rendering leader Grid expertise 18 months to significantly speed-up realistic rendering via Enterprise Grid (Worldwide Grid Ready) Acquire better quality in less time (improve reactivity and promote creativity) Towards real-time scene modification and interactive virtual visit A flexible solution A new level of performance

Business Experiments in GRID 11 BE4 – On GRID simulations for Financial Portfolio Management problem solving The growing complexity of financial markets intensified concerns over reliably measuring financial products risk exposure. Today, financial operators need a whole risk and evaluation infrastructure at their fingertips, which implies complex systems, technology and data. BE4 will design and implement an application, running simulations on a grid infrastructure, to support financial institutes in strategic decisions regarding financial portfolios. APPLICATION PROVIDERINTEGRATOR/BE LEADEREND USERS GRID SOLUTION/SRVICE PROVIDER BE STRUCTURE The new application will define the optimal financial portfolio given a predetermined risk level, by simulating financial products performances in the short term future. BASIC INFO: Sector: Finance GRID MW: Globus Duration: 18 months

Business Experiments in GRID 12 BE5 – Retail Management Summary BE Goals: –GRID-based architecture & sw design environment for Retail Management applications development (Demand Planning) Running in ASP modality –Improved application performances in critical CPU-intensive computations through parallelism exploitation –Improved control of QoS –Cost reduction for application hosting thanks to better scalability and interoperability Duration: 12 months Economic Sector: Retail Management Grid middleware: Assist programming environment on top of Globus 4.0 Università di Pisa

Business Experiments in GRID 13 BE06 – Groundwater modelling BE06 Goals: –Large scale multidisicplinary compute grid –Business models for license management –Designing, implementing and validating solution BE Details: –Duration: 20 months –Economic sector: SMEs providing services for groundwater modelling –Grid middleware: Unicore, Unicore/GS

Business Experiments in GRID 14 BE07 - Earth Observation Experiment Goals: –Promote and experiment grid in the industrial, institutional communities, with great attention to the involvement of SMEs. –Add new dimensions EO services by removing some of the current limitations on data access and process. Experiment duration will be 12 months = > goal is to provide preliminary results in the early stages of the experiment. EO sector includes both institutional and private organisations, i.e. meteorological and environmental agencies, health authorities, related industrial providers,… GRID middleware: Globus Toolkit (GT4), EGEE gLite, both tested on ESA-ESRIN GRID on demand environment.

Business Experiments in GRID 15 BE08 – Integration of engineering and business processes in metal forming DurationMain Goals 20 months Economic Sector Automotive Supplier Industry, especially small and medium sized enterprises coping with sheet metal forming. Providing costly virtual prototyping techniques (e.g. numerical simulation and optmization) to SMEs for Supporting virtual development Decreasing Time to Market Lowering total cost of ownership for hard- and software systems Telco Provider Technology Provider Service Provider Integrator End User Middleware Baseline WSRF-Based (Globus Toolkit 4, UNICORE/GS (if available)) Partnership & Value Chain

Business Experiments in GRID 16 BE09 – Distributed online gaming What: Distributed application hosting environment: –Application as a managed service – ASP benefits: Provide/ manage/ control own application service Outsource deployment and security management to infrastructure –Assessment Pilot - Internet-based gaming: interactive, multi-player, high- performance. How: Grid and Web Services technologies for: –Virtualisation of hosting environment for flexible deployment –Standard interoperable infrastructure services for security management –Input from EU R&D projects (GRASP, TrustCoM, NextGrid, ELeGI) When: September 2006 – February 2008 (18 months) Who: Andago, AtosOrigin, BT, CRMPA

Business Experiments in GRID 17 BE10 – Collaborative environment in the supply chain management for pharmaceutics The objective of the proposed BEINGRID experiment is to validate a Grid-based collaborative environment in the area of supply-chain management, using a paradigm taken from the pharmaceutical business sector. The specific sector comprises of numerous key business segments, including, pharmaceutical manufacturers, pharmaceutical and medical/surgical supply wholesalers, major pharmacy chains and healthcare providers to begin the process of standardizing the complete, front-end to back-end pharmaceutical supply chain management In the frame of BEINGRID, the proposed experiment will examine and use for the validation scenario the collaboration scheme between a manufacturer (supplier), a distributor (buyer) and a mediator (BE), included in the dashed red line of the scheme.

Business Experiments in GRID 18 BE11 – Risk management

Business Experiments in GRID 19 BE 12 - Sales Management System Goals: The application of the most valuable DAIS Grid Technology to the field of the Sales Management System (SMS), focused on food sector, and Customer Relationship Management (CRM) services, focused to the tourism sector. Duration: 17 months Management and planning: Project management : ENEA and Cineca BE kick off meeting: 3rd July – Bologna Grid middleware baseline: OGSA DAI – distributed database access

Business Experiments in GRID 20 BE13 - Textile Grid Infrastructure –Goals: to organize a common grid infrastructure between research centers and textile/clothing firms, in order to improve production and global resource scheduling and virtual retailing –Duration: 18 months –Grid middleware baseline: UNICORE (GS) – distributed computing OGSA DAI – distributed database access

Business Experiments in GRID 21 BE14 – New product & process development Development of an integrated environment required to develop new products and processes in the Chemistry sector –Multiple heterogeneous and widely distributed resources Parallel execution Coordination Databases, computer models, property and cost data, technical reports, and images Achieved by the combination of two outstanding Grid tools –GRID superscalar: programming model –GridWay: grid job manager Powered by GTv4 Duration: 18 months

Business Experiments in GRID 22 BE15 – Virtual engineering workplace for financial e-services Data Recovery Service (DRS) Service which provides SME/SOHO with recovery services for business critical applications, information and data. Business Continuity Management (BCM) is a relevant Topic nowadays with more attention nowadays. Cross domain service grid New Financial business services in line with existing services Project delivers: DRS service, Business Models 4 parties involved:

Business Experiments in GRID 23 BE16 - Ship building Ship Building Goals –Each ship is a unique product –Design is made under high time pressure –High need for simulation facilities –Reduce technological and economic risks –Migrate compute intensive tasks to ASP providers –Enable secure co-design between shipyard and suppliers Partners Technologies –SESIS –Unicore –eclipse on OSGi in java Duration: Sep 2006 – Apr 2008 Flensburger Schiffbau Gesellschaft Center for Marititime Technologies Hamburg Solutions for Research

Business Experiments in GRID 24 BE17 - GRILO: GRId experiment on Logistic Optimisation Goals: To assess if recent advances in open GRID technology reached a level of interest for conventional industrial applications To integrate the industrial Enterprise Resource Planning systems (ERP) with efficient and fast scheduler/planner based on new generation algorithms Duration: 14 months Target Sector: Logistics and Transportation

Business Experiments in GRID 25 « Expanding Geosciences On Demand » EGEODE is a virtual Organization opened to Research Centers in geophysics and other geosciences from both Industrial (public- private) and Academic world, thanks to Geophysics and Reservoir Simulation are key technologies for Oil&Gas. BE18 – Seismic Processing and Reservoir Simulation Complex workflows and algorithms

Business Experiments in GRID 26 BEinGRID at a glance SP Business Experiment Value Chain End- User Service Provider Experiments by sectors Experiments by technology Common facilities Integrator SP Finance MultiMedia Retailing Logistics Chemistry Goverment - Public service Aerospace Enviromental Science Textile Ship Building Engineering Automotive

Business Experiments in GRID 27 BEinGRID S&T Approach Technical cross activities Trust & Security VO Management Service & Data Mgt Architecture & Interop Selected branches: GTv4, UNICORE/GS, g-Lite, GRIA, WS-* Business cross activities Dissem. & Exploitation Market Study Business Modeling Mdw-1Mdw -2 Mdw -n BE1 BE2BE3... BE4 BE5 BE18 Repository

Business Experiments in GRID 28 Repository Structure Public BEinGRID repository Documents Biz Cases Development Public interface with BIZ & tech views Links Docs / Biz reports No Direct input from Act 3/4 Only input from Act 2 and WP1.7 BE Private Areas –support facility to develop Structure Content Filling strategy Exploitation & Dissemination Soft Components Collabor. Develop. Repository SW code Docs BE01BE02BE18 Development

Business Experiments in GRID 29 EU Reviewers ATOS General Manager (GM) IP Manager (IPM) Financial Manager (FM) Quality Manager (QM) Core Team (16) CT CR General Assembly (75) CR AC2 Leader (EM) AC6 Leader AC4 Leader AC3 Leader AC5 Leader AC1 Leader (STM) Executive Board EPCC ATOSCETIC LOGICABT External Advisory Board WP Leader WP Leader... EXP Leader EXP Leader... WP Leader WP Leader... BIZ Board (8), (DM)EXP Board (18 + 7)TECH Board (8) (BEM)

Business Experiments in GRID 30 International Co-operation on Grid Technologies – Target Continent: Asia Proposals leverage and integrate existing initiatives in the focal areas in Europe and the target country –1 Chinese partner at this time. –EchoGRID (ssa) –Second wave of expriment STREP SSA CA SSA STREP BEinGRID IP

Business Experiments in GRID 31 2nd wave of experiments… and opportunity for collaboration There will be an open call to establish a set of 5-6 new Business Experiments -One of them could be in collaboration with Korean or Chinese partners -The new BE should last round month maximum. -Available 330K (aprox) funding per experiment -The BE must be based on semi mature technology, include the full value chain (End- User, Integrator and Serv Provider) and present a preliminary business plan -Open call text available in 8 month aprox

Business Experiments in GRID 32 FP5 project What is this project about? To be or not to BE in GRID