MU.COM. PROJECT GENERAL PRESENTATION Marco Merlini, Project Coordinator Start-up Meeting Rome, 3-4 February 2011.

Slides:



Advertisements
Similar presentations
1. 2 We feel part of a multilingual Europe and we would like to give our contribution: for this reason we decided to apply for the European Language label.
Advertisements

1° Transnational Workshop – Rome 3rd- 4th February PROJECT WEBSITE AND PROJECT GRAPHIC DESIGN 1.
Science and Policy Integration for COastal Systems Assessment
EU Presidency Conference Effective policies for the development of competencies of youth in Europe Warsaw, November 2011 Improving basic skills in.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 OUT-IN: Organising, Using and Transferring INnovation LLP-LDV/TOI/07/IT/017 THE COURSEWARE Focus Group Manchester, 14 th – 16 th February 2008 Venue:
1 OUT-IN: Organising, Using and Transferring INnovation LLP-LDV/TOI/07/IT/017 DISSEMINATION AND VALORISATION PLAN First transnational workshop Manchester,
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Southern Voices networks Asia Consortium and networks.
Antonella Fresa Vilnius, 4th October 2007 Antonella Fresa Technical Coordinator MinervaEC MInisterial NEtwoRk for Valorising Activities in digitisation,
1. 2 Italy: 296 : awarded projects and initiatives in the period 1999 – : average of awarded projects per year in the period 1999 – : National.
WP7 Internal Evaluation & Quality Assurance Green Employability Project StudioCentroVeneto - Toni Brunello and Paolo Zaramella Vienna, 10th January 2012.
MU.COM. PROJECT Marco Merlini Next months steps: activities and expected outcomes Second Transnational Workshop Sibiu, 9 March 2012.
Materials concerning the Peer Review method
Renata Imbruglia, CIDEM Start-up Meeting Rome, 3-4 February 2011
MU.COM. PROJECT OVERIVIEW ON NEXT 6 MONTHS ACTIVITIES Marco Merlini, Project Coordinator Start-up Meeting Rome, 3-4 February 2011.
MU.COM. PROJECT SWOT ANALYSIS BASED ON QUESTIONNAIRES OUTCOMES Irene Salerno, CIDEM Start-up Meeting Rome, 3-4 February 2011.
ESF ACROSS BORDERS: ENGAGING THE REGIONS Action Plan to support to transnational and interregional cooperation at EU level Gerhard Bräunling.
Assessment of administrative and institutional capacity
What is valorisation ? Growth €
Knowledge Platform for assessing the costs and benefits of flood prevention FLOOD CBA Presentation: Ms Vasiliki Papadopoulou, SIGMA CONSULTANTS Ltd Kick-Off.
POLISH PRESIDENCY IN THE EU: COHESION POLICY AND EVALUATION-RELATED ACTIVITIES Presentation of Objectives and Programme Stanisław Bienias, Ministry of.
RUnUP Network Gateshead Local Support Group Meeting Thursday 27 th November 2008.
The Operational P The Operational Programme adopted by the European Commission The ESPON 2013 Programme EUROPEAN UNION Part-financed by the European Regional.
1 NECOBELAC Project WORK PACKAGE 3 Cross-national advocacy infrastructure.
Partnership and stakeholders of the DATOURWAY Project Mariann Major Vén Project Manager VÁTI Nonprofit Kft. 25/11/2011. Sofia,
WP6: Dissemination and exploitation Vladimir Meglič.
My Rights – My Voice Training by Persons with Disabilities to Staff on UNCRPD (10/ /2014) Communication Plan & Dissemination Strategy Kick off meeting.
WP3. Evaluation, Monitoring and Quality Plan Dr. Luis Sobrado 27 th May 2011.
MU.COM. PROJECT Marco Merlini, Irene Salerno COURSE FINAL TUNING AND SCHEDULE Second Transnational Workshop Sibiu, 9 March 2012.
Evaluating administrative and institutional capacity building
The Business Support Professional Career Pathway Leonardo Partnership Management Meeting CECA´s headquarter Seville, Spain March 2010.
15. Oktober Oktober Oktober 2012.
Mobility in Automotive Sector Through ECVET Turkish National Agency
Montessori Methodology in Language Training MMLT.
LLP-LDV/TOI/07/IT/016. OUTCOMES OF THE F-MU.S.EU.M. RESEARCH ACTIVITY F-M U.S.EU.M. (Form Multimedia System for a European Museum) LLP-LDV/TOI/07/IT/016.
FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP VALORISATION & SUSTAINIBILITY PLAN Budapest, June 2007.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Further.
WP2 – communication and dissemination
Project Title: Developing Effective Learner Training Across Europe (D.E.L.T.A.) PRESENTED BY: Mercy Maclean- Health Psychology Management Org. Services.
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions ECHO. C4 – Civil protection prevention and preparedness 2010 Kick off meeting – Brussels.
Leonardo da Vinci – Transfer of Innovation Project - PIECES Pathways into Employment in the Care and Tourism Sectors.
V.I.D.E.O. Video-CV to Increase and Develop Employment Opportunities GENERAL PRESENTATION Who we are Where we want to go Where are we Marco Merlini First.
DISSEMINATION / VALORISATION PLAN AND ACTIVITIES PRESENTED BY DR SHYAM PATIAR.
V.I.D.E.O. Video-CV to Increase and Develop Employment Opportunities GENERAL PRESENTATION Marco Merlini First Transnational Workshop Rome, March.
DISSEMINATION AND VALORISATION PLAN Once Again-st is a dissemination and valorisation intervention Dissemination implies all actions, tools and channels.
V.I.D.E.O. Video-CVto Increase and Develop Employment Opportunities THE RESEARCH ACTIVITIES OF THE V.I.D.E.O. PROJECT Marco Merlini First Transnational.
TIPEIL Transfer of an Innovative Portfolio to Evaluate Informal Learning LLP-LDV/TOI/07/IT/019 Dissemination Seminar Venue: Bidart, 20 March 2009.
TIPEIL LLP-LDV/TOI/07/IT/019 2nd Transnational Workshop Biarritz, March 2009 PROJECT WORKPLAN FUTURE ACTIVITIES.
PROJECT WORKPLAN Workprogramme It is articulated into 5 Phases: Ph 1 (2 months) – Start up from 1/03/07 to 30/04/07 Ph 2 (7 months) – Communication/relation.
VITA- Virtual Learning for the Management of successful SMEs LEONARDO DA VINCI PROJECT – TRANSFER OF INNOVATION January 2009 – December PTI-LEO
CCLVET Cross Cultural Learning and Teaching in Vocational Education and Training Overview LEONARDO DA VINCI Transfer of Innovation AGREEMENT NUMBER – LLP-LDV-TOI-08-AT-0021.
1 WERT: WP 5 RG EVANS ASSOCIATES November 2010 Aim To pilot and evaluate the content and context of the course material with target groups To help women.
L eading E lderly and A dult D evelopment -LAB Grundtvig Project LLP IT-GRUNDTVIG-GMP.
FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP VALORISATION & SUSTAINABILITY STRATEGY Sucevita, May 2008.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
TIPEIL LLP-LDV/TOI/07/IT/019 First Transnational Workshop Athens, 7-8 February 2008 Venue: IEKEP - 34A Averof str. in Nea Ionia 1 st floor DISSEMINATION/VALORISATION.
LLP-LDV/TOI/07/IT/016. F-MU.S.EU.M. PROJECT: STATE OF THE ART AND INTERMEDIATE REPORT TO SUBMIT AT 15 DECEMBER Marco Merlini F-M U.S.EU.M. (Form Multimedia.
History of the Project 1. 2 The starting point… CSA – Civil Service Apprenticeship LDV pilot project 2004 Italy, Spain, Bulgaria, Holland Tool: Excel.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
Tailored training for professionals in the rural tourist sector-FORESTUR” ES/06/B/F/PP Florence, 23 January 2008.
1 Valori: Valorize the diversity by training, inclusion and job paths cod. LLP-LDV/TOI/08/IT/551 OVERVIEW Brussels November 13th, 2008 Valori, Kick-off.
European Dialogue on Future Interregional Co-operation The main outcomes of the CENTURIO project within the partnership co-ordinated by Jász-Nagykun-Szolnok.
LLP-LDV/TOI/07/IT/016. PROJECT WORKPLAN SEPTEMBER 2008-NOVEMBER 2009 Marco Merlini F-M U.S.EU.M. (Form Multimedia System for a European Museum) LLP-LDV/TOI/07/IT/016.
Exploitation means to use and benefit from something. For Erasmus+ this means maximising the potential of the funded activities, so that the results are.
PLANNED ACTIONS – UPCOMING DUTIES
Improving digital skills for career guidance at school
Dissemination Plan made from EDUNET LEONARDO PARTNERSHIP PROJECT
IENE Intercultural Education of Nurses in Europe
Presentation transcript:

MU.COM. PROJECT GENERAL PRESENTATION Marco Merlini, Project Coordinator Start-up Meeting Rome, 3-4 February 2011

Rationale for the Project Museum Communicator is a professional figure whos role is becoming strategic both inside the Museums and the cultural associations managing museums. It is up to that figure to take care of: the success of the impact, on the public, of the initiatives proposed by a Museum and the effectiveness in creating networks among the actors and the local resources.

Rationale for the Project Although pivotal, the Communication Expert is not always available in museums, in particular in case of institutions of modest dimensions. On the contrary, the giant national museums have often an Information and Communication Department. This evidence leads to highlight the necessity to create specific competences related to this particular professional role, and the consequent need of specific training methodologies and tools in order to give to Museum staff as well as museology students the skills needed for a good communication.

Project objectives The Project will develop a course that will allow users to acquire high-level standard competences and internationally recognised, pointing out strategies and effective techniques for communicating with: the large audience, the mass media and the network of territorial actors. The course should be conceived as a training low-cost product that we can offer (sell?) to universities and cultural institutions of our countries. Throughout the next two years, it will allow users to acquire high-level competences in the frame of the Project partnership in form of a sperimentation and testing of a training package that should find its market.

Project workplan WORK PACKAGE 1 – CONSORTIUM MANAGEMENT Start month 10/2010, end month 09/2012 Key-products 1. PROJECT INTERMEDIATE REPORT (To be submitted within the 30 th of November 2011) Partners concerned: CIDEM 2. PROJECT FINAL REPORT (24 th month) (To be submitted within the 30 th of September 2012) Partners concerned: CIDEM 3. INTRANET + RESTRICTED AREA ON THE PROJECT WEB SITE (3 rd month) Partners concerned: EURO INNOVANET

Project workplan WORK PACKAGE 2 - Analysis of the integrative needs and adaptation of the reference Model: Curriculum for Museum Communicator Start month 10/2010, end month 12/2010 WE ARE 2 MONTHS LATE…………… Key products 1. Reference Model (Starting Model) – already done 2. SWOT SYNTHESIS REPORT (EN, Website) – already done Partners concerned: CIDEM, EURO INNOVANET 3. PROJECT WEB SITE, PUBLIC AREA (3 rd month) – already done Partners concerned: EURO INNOVANET

Project workplan WORK PACKAGE 3 - ANALYSIS AND ENHANCHEMENT OF THE F- MU.S.EU.M. MODEL Start month 01/2011, end month 05/2011 Key products 1. DESK ANALYSIS COMPARATIVE REPORT (IT/EN, on Website - 7 th month, 04/2011). Input of data by all the Partners Focus on: the European experiences on the Museum Communicator, distinctive competences of the Museum Communicator, training needs, first elements of the Curriculum, Learning, experimentation and transfer actions to be implemented Partners concerned: CIDEM, Universitatea Lucian Blaga 2.a PEER REVIEW NATIONAL WORKSHOPS on the basis of the results of the DESK ANALYSIS COMPARED REPORT, managed by the national partners, translated from the national languages into English 2.b REPORT ON COMPARED ANALYSIS BASED ON THE PEER REVIEW (IT/EN. Website - 7 th month, 04/2011) on the basis of national reports coming from the Peer Review meetings. Partners concerned: CIDEM, Universitatea Lucian Blaga din Sibiu

Project workplan WORK PACKAGE 3 - ANALYSIS AND ENHANCHEMENT OF THE F-MU.S.EU.M. MODEL 3. Multilingual Brochure Presenting The Project EN/IT/BG/RO Partners concerned: CIDEM 4. Digital Newsletter n. 1. EN/IT Website (3 rd month; 12/2010). Partners concerned: EURO INNOVANET 5. Digital Newsletter n. 2. EN/IT Website (6 th month; 03/2011). Partners concerned: EURO INNOVANET

Project workplan WORK PACKAGE NUMBER 4 – BUILDING A PROFESSIONAL STANDARD FOR MUSEUM COMMUNICATOR Start month 06/2011, end month 08/2011 Key products 1. SCHEMES DESCRIBING THE COMPETENCE AREAS FOR THE MUSEUM COMMUNICATOR (EN/IT/BG/RO website) (10 th month; 07/2011) Partners concerned: CIDEM, Universitatea Lucian Blaga, OAKE Europe 2. Digital Newsletter n. 3. EN/IT Website. (9 th month; 06/2011) Partners concerned: EURO INNOVANET

Project workplan WORK PACKAGE NUMBER 5 – ADAPTATION AND DEVELOPMENT OF THE TRAINING COURSE FOR MUSEUM COMMUNICATOR Start month 09/2011, end month 12/2011 Key products 1. PROJECT INTERMEDIATE REPORT. IT (14 th month; 11/2011) Partners concerned: CIDEM 2. TRAINING CURRICULUM IN SELF-LEARNING FOR MUSEUM COMMUNICATOR (DRAFT VERSION) (EN/IT/BG/RO website) (14 th month; 11/2011) Partners concerned CIDEM, Universitatea Lucian Blaga

Project workplan WORK PACKAGE NUMBER 5 – ADAPTATION AND DEVELOPMENT OF THE TRAINING COURSE FOR MUSEUM COMMUNICATOR Start month 09/2011, end month 12/2011 Key products 3. WEB-BASED PLATFORM SUPPORTING THE TRANSFER ACTIVITY (EN/IT/BG/RO website) (14 th month; 11/2011) Partners concerned: EURO INNOVANET 4. Digital Newsletter n. 4. EN/IT Website. (12 th month; 09/2011) Partners concerned: EURO INNOVANET 5. Digital Newsletter n. 5. EN/IT Website. (15 th month; 12/2011) Partners concerned: EURO INNOVANET

Project workplan WORK PACKAGE NUMBER 6 – TRASFER AND FINAL ADAPTATION Start month 01/2012, end month 06/2012 Focus on actions: 1.Course adaptation and development on web-based platform 2. Transfer activity: It will be realised at not less than 2/3 Organisms in each National context, representatives of the main project target groups (Museums and Universities) and will be addressed to a whole number of about 78 beneficiaries articulated as follows: 12 Museum operators in Italy, Romania and Bulgaria (tot. 36); 14 Museum operators and students in the United Kingdom (tot. 14); 14 university students in Italy and Romania (tot 28)

Project workplan WORK PACKAGE NUMBER 6 – TRASFER AND FINAL ADAPTATION Start month 01/2012, end month 06/2012 Key Products 1. EVALUATION SYNTHESIS REPORT (EN/IT website) (19 th month; 04/2012 EURO INNOVANET 2. FINAL VERSION OF THE TRAINING CURRICULUM (EN/IT/BG/RO website) (19 th month; 04/2012) UNIVERSITY OF ROME, Universitatea Lucian Blaga 3. FINAL VERSION OF THE WEB-BASED PLATFORM SUPPORTING THE TRANSFER ACTION (EN/IT/BG/RO website) (19 th month; 04/2012) EURO INNOVANET, for translations: Regional History Museum Academician Jordan Ivanov, Muzeul Naţional Brukenthal

Project workplan WORK PACKAGE NUMBER 6 – TRASFER AND FINAL ADAPTATION Start month 01/2012, end month 06/ Digital Newsletter n. 6. EN/IT Website. (18 th month 03/2012). Partners concerned: EURO INNOVANET 5. Digital Newsletter n. 7. EN/IT Website. ( 21 st month 06/2012). Partners concerned: EURO INNOVANET 6. Monitoring report n. 2 (16 th month; 01/2012) Partners concerned: EURO INNOVANET 7. Updating of 2 Mailing lists Partners concerned: CIDEM, ALL THE PARTNERS

Project workplan WORK PACKAGE NUMBER 7 - LABORATORIES: PLANNING THE PROJECT WORKS Start month 07/2012, end month 09/2012 Key products 1. N. 2 PROJECT WORKS (IT/RO Website) (23 rd month; 08/2012) Partners concerned: Museo Internazionale delle Ceramiche in Faenza, CIDEM, EURO INNOVANET, Provincia di Ragusa, Muzeul Naţional Brukenthal, EURO INNOVANET (as coordinator) 2. FINAL PROJECT REPORT. IT Website (24 th month; 09/2012) Partners concerned: CIDEM 3. Digital Newsletter n. 8. EN/IT Website. (24 th month 09/2012). Partners concerned: EURO INNOVANET

Project workplan WORK PACKAGE NUMBER 7 - LABORATORIES: PLANNING THE PROJECT WORKS Start month 07/2012, end month 09/2012 Key products 4. BOOK ON TRAINING CURRICULUM FOR MUSEUM COMMUNICATOR EN/IT/BG/RO on paper, 2000 copies + Website (24 th month; 09/2012). Partners concerned: CIDEM 5. Evaluation of the experience made through questionnaire. Partners concerned: EURO INNOVANET 6. Monitoring report n.3 (22 nd month; 07/2012) Partners concerned: EURO INNOVANET

Project workplan WORK PACKAGE NUMBER 8 – MONITORING AND PROJECT INTERNAL EVALUATION Start month 10/2010, end month 09/2012 Actions developed all the project long, such as monitoring reports n. 1,2,3, already included in the preceding WPs..

Project dissemination plan WHY DISSEMINATION? Dissemination actions will be aimed at guaranteeing that the process, the results and the products are entirely visible and available for the target groups and for a wider number of final indirect addressees The Project dissemination will contribute to the creation of a European Network on the Communication within Museums and on the role of Museum Communicator diffusing and valorising the project results near a more and more wide number of potential beneficiaries and Institutional actors.

Project dissemination plan DISSEMINATION: ACTIONS AND PRODUCTS 1. Project Web-site, in Italian and English, aimed at informing a great number of beneficiaries about the project activities, making the produced and validated materials available 2. Multilingual Brochure presenting the project (3 rd month) 4. Digital Newsletter (8 thematic numbers) 5. Mailing lists 6. N. 4 dissemination Seminars (IT, BG, RO, UK) with the local stakeholders

Project dissemination plan DISSEMINATION: ACTIONS AND PRODUCTS 7. Organisation of n. 2 parallel, promotional events, in Italy and Romania 8. International final Conference in Rome 9. Articles on the specialised press like the Tourism Sciences Review (University of Rome) and Acta Terrae Septemcastrensis (University of Sibiu) 10. Book on Training Curriculum for Museum Communicator (2000 copies, on paper).

THANK YOU FOR YOUR ATTENTION