Willtek Service Centre Singapore Singapore. 2007-08-30 slide 2 Willtek Service Centre Singpore Willtek Service Centre Singapore.

Slides:



Advertisements
Similar presentations
IT Ess I v.4x Chapter 1 RouterModesWANEncapsulationWANServicesRouterBasicsRouterCommands RouterModesWANEncapsulationWANServicesRouterBasicsRouterCommands.
Advertisements

Chapter 2: Safe Lab Procedures and Tool Use
NEW PRODUCTS ©Copyright May 2011 DESCO INDUSTRIES INC.
Ergonomics, Tools and Preventative Maintenance By Jesse Role Ph. D TM.
IT Essentials: PC Hardware and Software v4.0. Chapter 2 Objectives 2.1 Explain the purpose of safe working conditions and procedures 2.2 Identify tools.
Customer Satisfaction No.1. Pioneer Electronics Service (PSE)
CIT In this chapter you will learn how to:  Care for the external parts of the computer  Describe methods for keeping the inside of the case problem-free.
Automotive Electricity and Electronics, 3/e By James D. Halderman Copyright © 2011, 2009, 2005 Pearson Education, Inc., Upper Saddle River, NJ All.
“There’s always a reason”. Fill in the blank Joe Shmo: “I’m trying to do this quarterly and I just can’t get this stupid attachment to open at.
COSCAP-SA Maintenance Facilities & Job Descriptions.
What is a Television?  Tele – Distance  Vision - Image.
Concrete Testing Gauge REBAR LOCATOR TC100 CRACK DEPTH GAUGE TC200 CONCRETE TESTING GAUGE TC300 CRACK DEPTH GAUGE TC400.
The Specialists in ESD Protection Low Resistance Tester Vermason.co.uk Item
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 2 1 Chapter 2: Safe Lab Procedures and Tool Use IT Essentials: PC Hardware.
4/20/2017 © 2015 Vermason Ltd..
IT Essentials: PC Hardware and Software v4.0.  List of chapter objectives  Overview of the chapter contents, including ◦ student worksheets ◦ student.
Applied Technology High School ATE 1012 Grade 10 Eng. Rose Hasan.
Unit 4, Lesson 9 Keeping You and Your Computer Safe AOIT Computer Systems Copyright © 2008–2013 National Academy Foundation. All rights reserved.
PC Maintenance: Preparing for A+ Certification Chapter 2: Safety and Preventive Maintenance.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 2 1 Chapter 2: Safe Lab Procedures and Tool Use IT Essentials: PC Hardware.
IT Essentials: PC Hardware and Software 1 Chapter 10 Preventative Maintenance.
© Cisco Systems, Inc. All rights reserved. Cisco Public ITE PC v4.1 Chapter 2 1 Chapter 2: Safe Lab Procedures and Tool Use IT Essentials:
Copyright © 2007 Heathkit Company, Inc. All Rights Reserved PC Fundamentals Presentation 4 – Inside the Computer.
1 Safety and Preventative Maintenance. 2 MB, One megabyte - MB or M-byte - represents about 1 million (10 6 ) bytes. Precisely, 1 MB = = 1 kB x 1 kB =
Tools.
Copyright © 2008–2011 National Academy Foundation. All rights reserved. Unit 4, Lesson 9 Keeping You and Your Computer Safe AOIT Computer Systems.
Harnessing Technology Mobile Technology Unit North West City Learning Centre.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Two Categories of Troubleshooting tools Hardware Tools Software Tools.
Safety. Outcomes  Potential health hazards when working with computer equipment.  Precautions to take to prevent injuries.  Steps and techniques for.
Course ILT Troubleshooting and maintaining a PC Unit objectives Identify tools and software that make up a troubleshooter’s toolkit Perform preventive.
SJDAdvisory Committee Dec Production & Maintenance Steven J. Durand December, 2004.
Computer Engineering Technology I – Pilot Objective Use appropriate safety procedures. Course Weight : 2%
11 Finding power to ground plane shorts How VPS* helps find ground plane shorts (*Vector plane stimulus) PolarInstruments.com.
Health & Safety in the Office. Information Where there is an interactive task within the programme it cannot be completed on- screen. It is suggested.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 2 1 Chapter 2: Safe Lab Procedures and Tool Use IT Essentials: PC Hardware.
Chapter 2: Safe Lab Procedures and Tool Use
IT Essentials PC Hardware & Software v4.1 Chapter 2 – Tools & Safety Procedures Jeopardy Review v1 Darren Shaver Kubasaki High School Okinawa, Japan Chapter.
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
PC Maintenance By Tammy Pratt University of Phoenix EDTC560.
Safe Lab Procedures and Tool Use
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 2: Safe Lab Procedures and Tool Use IT Essentials 5.0.
C181 Launch Presentation. CONTENTS 1.Key Features 2.Detailed Specification 3.PCB Layout 4.ESD Industrial Standard 5.Service Tools 6.Disassembly – Assembly.
EM Eye Meter CTM From ESD Detection To ESD Prevention.
ABOUT ICS …  To provide global level technical and marketing training in Cellular Technology oriented businesses.  To promote and develop Cellular education.
© Cisco Systems, Inc. All rights reserved. Cisco Public ITE PC v4.1 Chapter 2 1 Chapter 2: Safe Lab Procedures and Tool Use IT Essentials:
 Rockwell Hardness Testers Rockwell Hardness Testers  Digital Rockwell Hardness Testers Digital Rockwell Hardness Testers  Vickers Hardness Tester.
ESD RESULTS AT YOUR FINGERTIPS Charleswater.co.uk.
SUPPLIES SYSTEMS SERVICE •
SYSTEMS SUPPLIES SUPPLIES SERVICE SERVICE
ESD RESULTS AT YOUR FINGERTIPS
IOT Critical Impact on DC Design
ISUAL Product Assurance
FIGURE 25-1 This cruise control servo unit has an electrical connection with wires that go to the cruise control module or the vehicle computer, depending.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 2: Safe Lab Procedures and Tool Use IT Essentials 5.0.
Please Fax or your Registration Form to GIA.
Please Fax or your Registration Form to GIA.
Understanding Operational Procedures
Get Reliable Brother Printer Customer Service
Production & Maintenance
Please Fax or your Registration Form to GIA.
ESD Protection 02/12/2018 Radiometer Medical ApS 2 December, 2018.
Process Flow For Electronic Component Prep
Static Eraser for ESD protection
ESD Procedures for the Electronics Industry
Tri-State Office Products Personalized Service! Period!
Please Fax or your Registration Form to GIA.
the most complete monitoring solution on the market
Repairing the Electrical Components
ประกาศกระทรวงอุตสาหกรรม ฉบับที่ 5292 (พ.ศ. 2562)
Presentation transcript:

Willtek Service Centre Singapore Singapore

slide 2 Willtek Service Centre Singpore Willtek Service Centre Singapore

slide 3 Willtek Service Centre Singpore Office Work Environment in the Service Centre A office work environment with PC ( , internet, applications), oscilloscope and power distribution.

slide 4 Willtek Service Centre Singpore Workspace for Mechanical Jobs A non ESD workbench for mechanical jobs. Beside a cabinet with a register for components and other small parts.

slide 5 Willtek Service Centre Singpore Repair and Calibration Workbench Often used manuals and files Grounded soldering iron ESD protecting by conductive ground Digital multi meter 4032C ATE Calibration System Thermometer & Hygrometer with alarm function Power distribution for customer units Vacuum cleaner to maintain customer units ESD protecting with arm mat and wrist strap Lighted Magnifying Glass for in-circuit analysis

slide 6 Willtek Service Centre Singpore Cabinet for Tools All tools needed for repair are just aside the workbench

slide 7 Willtek Service Centre Singpore Cabinet for Spare Modules and others The cabinet in the service area contains: Module in EPA bags Accessories Spare bags De soldering station Cables for fault detection Letterhead printer paper

slide 8 Willtek Service Centre Singpore Opening Ceremony on 25th Nov. 2004

slide 9 Willtek Service Centre Singpore Always ready for customer units: Willtek Service Centre 12 Tannery Road #09-02 HB Centre 1 Singapore Singapore Tel: Fax: willtek.com