Western Electricity Coordinating Council Frequency Responsive Reserve Workshop Kenneth J. Wilson Staff Engineer Frequency Responsive Reserve Standard Drafting.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Standards Development and Approval Process Steve Rueckert Director of Standards Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
Operating Reserves --- Again A Discussion Primer
Bulk Electric System Definition Task Force Update Michelle Mizumori June 18, 2009 Salt Lake City.
Budget Overview Jillian Lessner Controller May 7, 2009 JGC Annual Leadership Training.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
WECC Response to BAL-002-WECC-1 Remand Order December 10, 2010 WECC Board of Directors Meeting Steve Rueckert Director of Standards.
The Western Electricity Coordinating Council Doug Tucker Associate Engineer September 22, TRD/TADS Webinar.
NERC Orientation Joint Guidance Committee WECC Leadership
Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
Underfrequency Load Shedding Report
FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
Western Electricity Coordinating Council Market Issues Subcommittee Report to the Market Interface Committee Philip Tice October 30-31, 2008.
Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
FREQUENCY LIMITS R-BC Workshop FREQUENCY LIMITS WECC PWG August 13, 2009.
Heidi Pacini Staff Engineer Developing a Draft 2011 Study Program March 10, 2010 SWG Conference Call.
WARD LAKE MASTER PLAN Public Input Workshop #1 July 14, 2011.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
Some facts and figures on e-referral usage E-referral workshop December 2011 Presented by: Christopher Foley-Jones Date: 8 December 2011.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan Plan Summary Comment Q&A June 17, 2011.
Underfrequency Load Shedding Assessment Report Kent Bolton January 30, 2014 JGC Meeting SLC, UT.
Understanding Electrical TransmissionDemonstration C2 A Guide to the National Grid Transmission Model Demonstration C2 Why are high voltages used for transmission?
ERCOT Under Frequency Load Shed Testing
Michael Bailey, PE Energy Planning & Policy Analyst LTPT Update to EDTF January 23, 2015 WECC Webinar.
RFC Webinar June 17, 2009 Presented By: Mark Kuras Chair, UFLS SDT.
NERC BAL Frequency Response Reliability Standard
Keegan Moyer Manager, Transmission Expansion Planning WECC Response to DOE Quadrennial Energy Review June 19, 2014 San Francisco, CA.
1 Bradley Nickell Director of Transmission Planning Incorporation of Water in Transmission Planning April 2, 2013.
VARIABLE GENERATION OPERATING RESERVE TASK FORCE VARIABLE GENERATION OPERATING RESERVE TASK FORCE Don Badley, Chair VGORTF Report to Operating Committee.
Arizona Corporation Commission Energy Workshop February 16, 2001.
Page 1 Slides for FR Technical Conference Office of Electric Reliability September 2010.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Operations Report Kent Saathoff System Operations ERCOT.
Project Underfrequency Load Shedding PRC-006, 007 and 009 Bob Millard ReliabilityFirst staff Reliability Standards Workshop April 29-30, 2008.
Responsive Reserve Service Deliverability Review September 15,
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Ann Finley VGS-PCC Liaison VGS Discussion July 15-16, 2014 Salt Lake City, Utah.
WHAT YOU NEED TO KNOW ABOUT NERC ERO COMPLIANCE Louise McCarren Chief Executive Officer – WECC APPA National Conference June 16, 2009 Salt Lake City, Utah.
Compliance Program Update Lisa Milanes Manager of Compliance Administration.
WECC – NERC Standards Update
Kenneth Silver Los Angeles Department of Water & Power
Progress Report for the May 26th 17:31 Event
WECC Operating Committee Operations Training Subcommittee Report
Steven F. Bartlett, Ph.D. P.E Associate Professor
Kenneth Silver Los Angeles Department of Water & Power
West Jordan Garage Door Repair
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
خطة التحول الاستراتيجي للهيئة
2018 Loads and Resources Data Request Part 2
NASPI PMU Data Application Classification
Anitha Neve Operations and Interchange Specialist
Elena Melloni Associate Engineer
Anitha Neve Operations and Interchange Specialist
WECC Performance Analysis
ERS Forward Looking Measures 1, 2 & 4
Planning Coordinator Function Task Force
2018 State of the Interconnection Overview
NASPI PMU Data Application Classification
Donald Davies Chief Senior Engineer
Kenneth Silver Los Angeles Department of Water & Power
Variable Generation Subcommittee Update to PCC
Planning Coordinator Function Task Force
2018 Loads and Resources Data Request Part 2
Generator Operator Work Group (GOWG)
ERS Forward Looking Measures 1, 2 & 4
Presentation transcript:

Western Electricity Coordinating Council Frequency Responsive Reserve Workshop Kenneth J. Wilson Staff Engineer Frequency Responsive Reserve Standard Drafting Team February 12, 2009

Western Electricity Coordinating Council Limiting Condition 2

Western Electricity Coordinating Council Load Response 3

Western Electricity Coordinating Council Typical Frequency Excursion 4

Western Electricity Coordinating Council 5 Sensitivities to FRR Amount Case A (baseline) – June event validation case Case B – current UFLS settings are maintained base-loaded generating capacity is increased until frequency for 2 PV outage drops to 59.5 Hz Case C – current UFLS settings are maintained base-loaded generating capacity is increased until frequency for 2 DCNG outage drops to Hz Comment: Diablo Canyon NG outage is the next worst G-2 after 2 PV Case D – UFLS is blocked base-loaded generating capacity is increased until frequency for 2 PV outage drops to approximately 59.5 Hz

Western Electricity Coordinating Council 6

7

8 Frequency Responsive Reserve Questions Kenneth J. Wilson Staff Engineer Western Electricity Coordinating Council 615 Arapeen Drive, Suite 210 Salt Lake City, Utah