WECC TRD/NERC TADS Webinar

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
©2004 PJM 1 OASIS Phase II Approaching the Problem General Discussion on Strategy and Philosophy Andy Rodriquez - PJM Presented to the NAESB ESS and ITS.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
PCC Update Presentation to TEPPC June 2010 Dana Cabbell PCC Chair.
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
TRDTF Transmission Reliability Database Task Force Update & Approval Vote Brian Keel SRP
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Remedial Action Schemes Application and Implementation Requirements & Performance Assessment Measures Vahid Madani Pacific Gas and Electric Co. Chair -
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
The Western Electricity Coordinating Council Doug Tucker of WECC & Brian Keel of SRP November 16, TRD/TADS Webinar.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
The Western Electricity Coordinating Council Doug Tucker Associate Engineer September 22, TRD/TADS Webinar.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
WECC System Performance Criteria 1st Team Meeting Background
Underfrequency Load Shedding Report
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
1 NERC Update WECC OC Meeting June 19, Two Items Variable Generation Reliability Reports.
Plan My Care Brokerage Training Working in partnership with Improvement and Efficiency South East.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
EMS Checklist (ISO model)
Text 1 July, 2010 DCMS: Training Manual Campaign Management.
2009 Strategic Planning playbook
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
MARKETING INFORMATION AND RESEARCH
“The Honeywell Web-based Corrective Action Solution”
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
IS-700.A: National Incident Management System, An Introduction
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Doug Tucker of WECC & Milorad Papic of IPC 2012 TRD/TADS Webinar October 23, 2012.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
WECC Reliability Based Control Field Trial
School Census Summer 2011 Headlines Version Jim Haywood Product Manager for Statutory Returns.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
RPEWG Report Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014 RS Meeting 1.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Review of TADS Data for 2012 Voltage Class Name Metric AC Transmission Outages - Failed Protection System Equipment AC Transmission Outages - Human Error.
WECC 2013 TPL Coordination Analysis Report PCC Response Brian Keel.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
Reliability Assessment Committee Proposal TSS Meeting
CIIMS Proposal for TOP-003 Approach
Workshop Session 2: Forms
MIC Committee Discussion
Compliance Open Webinar
Workshop Session 1: Overview
Workshop Session 1: Overview
Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014
Compliance Open Webinar
MIC Committee Discussion
MAC Input on Section 4.9 Review
Presentation transcript:

WECC TRD/NERC TADS Webinar September, 2009

WECC TRD and NERC TADS Brian Keel, Salt River Project TRD and TADS Timelines How TRD and TADS fit together Review of Spreadsheets Differences in TRD – TADS, attributes Doug Tucker, WECC Data Gathering Discussion & Results WECC Data Handling

WECC Transmission Reliability Database Started as sub group of the Reliability Subcommittee Spring 2004 WECC PCC - OC 2005, re-tool for attributes Formed TRDTF Fall 2005 WECC PCC, OC and Board approved Fall of 2006 Purposes of TRD: WECC PCC Goal WECC PCC and OC presentations over 2005 Completed with added physical attributes

WECC Transmission Reliability Database Purpose of the TRD Development Transmission Outage Database PCUR, used with Performance Category Upgrade Requests Primary Use - RPEWG – monitor, evaluate and report performance to WECC, core charge of RPEWG WECC transmission line performance and tracking Facilitate probabilistic planning Provide common format for data collection, i.e., all of Western adopted for their use

Purpose of the TRD In a 1996 WSCC survey, 90%, criteria expanded to be more probabilistic based. PBRC Phase I development and implementation of event probabilities into Performance Table. Table S-1 Ultimate goal is to produce a more economically efficient system without sacrificing system reliability.

WECC TRD and NERC TADS WECC TRD Sheets Transmission Circuit Attribute Table Same as last year; Miles, Type, Voltage, Conductors per Phase, Overhead Ground Wires, Insulation Type, Cable Type, Structure Materials, Structure Types, Circuits per Structure, Terrain Exposure, Elevation Exposure. Transformer Attribute Table Same as last year; High and Low Side kV, Single or Multi, Rating.

WECC TRD and NERC TADS WECC TRD Documents User’s Manual for Reporting WECC Common Transmission Outage Data Forced Outage Performance of 200kV and above Transmission Lines, Cables and Transformers Input Data Sheets formed Costs of WECC Members and cost to WECC developed, presented and budgeted

WECC Table W-1

WECC TRD and NERC TADS RPEWG Members of the RPEWG (includes WECC Staff as Members of RPEWG) only have access to raw outage data RPEWG Members listed on the WECC website Access to data governed by RPIC, Approved Exhibit C Raw outage performance compared to criteria of WECC Performance Criteria Table W-1

WECC TRD and NERC TADS TADS (TRD) overview NERC wide data collection AC circuits >= 200kV Transformers Low Side >= 200kV AC/DC Back to Back Converters >= 200kV AC Voltage DC Circuits >= +/-200kV

WECC TRD and NERC TADS TADS Forms 1.1 Non – Reporting TO Statement 1.2 Reporting TO Statement 2.1 Tie Lines and Jointly Owned AC & DC 2.2 Jointly Owned AC/DC BTB Converters 3.1 AC & DC Circuit Inventory Data 3.2 Transformer Inventory Data 3.3 AC/DC BTB Converter Inverter Data 3.4 Summary Automatic Outage Data 4.1 AC Circuit Detailed Outage Data 4.2 DC Circuit Detailed Outage Data 4.3 Transformer Detailed Outage Data 4.4 AC/DC BTB Converter Detailed Outage Data 5.0 Event Code Data Indicates WECC Members fill in these NERC TADS Forms Indicates NERC data to be supplied by WECC from TRD Sheets

WECC TRD and NERC TADS Form 1.1 Non – Reporting TO Statement TOS who do not own TRD/TADS Elements Continuous submittal, “Once is Not Enough” Form 1.2 Reporting TO Information Business Contact List of which Forms completed NERC confidentiality default status of TO data

WECC TRD and NERC TADS Form 2.1 Tie Lines and Jointly Owned Each Tie Line (s) TO has ownership Mutual agreement and discussion between TOs

TRD Sheet Review Go to Each Individual Sheet for Discussion of individual column:

Transmission Availability Database - TADS TADS Metrics Calculated: Inventory of AC & DC Equipment Circuit & Transformer Outage F & D per outage initiation code Circuit Sustained and Momentary Outage Metrics, Element or Other Initiated

TRD and TADS Differences TRD Data Differences: Focus to Common Corridor Outages (RPEWG) Physical Attribute Data Inputs Circuits; Outage Rates per Conductors per Phase Number of Ground Wires Insulator Type Structure Material Structure Type Terrain Exposure Elevation Range

Phase II Design Phase II TADS designed to expand the collection of Phase I outage data to: Planned Outage Operational Outage – non automatic outage for purpose of avoiding emergency Data collection will commence in 2011 for CY2010 data Metrics Calculated: Non – automatic outage frequency per element Outage Duration per Element Mean Element outage time Median Element outage time Percent of Elements without outage Max percent of simultaneous outage

Phase II Design Phase II: Non – automatic Outage data will compliment Phase I data Complete outage information may influence Standards May allow bridging the gap between Planning and Operating environments U.S. – avoids duplicative reporting for EIA non – automatic outage reporting Care used in evaluation or using data: Live line maintenance Region to region comparisons are not recommended

TRD & TADS Timelines SEP 1st 2009 Forms 1.1, 1.2 & 2.1 FEB 1st 2010 Reporting & Non – Reporting Transmission Owner Sheets Jointly-Owned AC & DC Circuits FEB 1st 2010 All 2009 Automatic Outage Data to WECC MAR 1st 2010 WECC Data Submittal to NERC

WECC TRD and NERC TADS New Items for 2009: Sustained Outage Cause Code “Unavailable” was removed Initiating and Sustained will both need entered Each TO must keep 5 years of supporting data for auto outage submittals Phase II starts 1.01.10 Training will be held late 2009, either WECC or NERC giving this training, 1 to 1 translation (WECC)

Role of Regional Entities The process involves a coordinated effort between NERC and the Regional Entities. This coordination is critical to the success of TADS. Regional Entities are responsible for the following tasks: Request data from TOs. Review tie lines and jointly-owned facilities to ensure that a single TO is responsible for TADS reporting. Review inventory and outage data for consistency and completeness (but do not review a TO’s source data). Assign common Event ID Codes for Events affecting more than one TO in their region. Evaluate AC Circuit outages on common structures when the circuits are owned by different TOs.

Data Submittal & Review

NERC and WECC Databases Conclusion WECC Specific to design Structure in place and working NERC Displace EIA General Outage Information Not design specific First year in 2008