1 Status & Plans DCS WS 10.3.03 L.Jirdén. 2 DCS Planning 20020304050607 FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
The Detector Control System – FERO related issues
1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
CBM slow controls CBM collaboration meeting DAQ work group CBM collaboration meeting DAQ work group Burkhard Kolb GSI1.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
1 Responsibilities & Cost ALICE DCS Review 14 Nov 05 For the DCS Team L.Jirden.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
DCS Software Installation computing, network, software guidelines, procedures Peter Rosinsky, Peter Chochula, ACC team ALICE DCS Workshop, CERN, 5-6 March.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
ALICE. 2 Experiment Size: 16 x 26 meters (some detectors >100m away from IP) Weight: 10,000 tons Detectors: 18 Magnets: 2 Dedicated to study of ultra.
Alice TPC DCS.
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

1 Status & Plans DCS WS L.Jirdén

2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE SUB-DET CONTR. INSTALL DETECTOR DCS INSTALL DCS INFRASTRUCTURE TEST WITH DETECTOR EQUIPMENT

3 Status URD’s March 03 DCS Detectors … FC TOF SPDSDDSSD TPCTRDZDCPMDHMP RO ITS PHO CPVCAL FMDV0T0 TRATRI MU COSEMC HV LV FEE GAS TMP COO subsystems LSR HV LV FEE GAS TMP TS HV LV FEE HV LV FEE GAS TMP HV LV FEE GAS TMP HV LV FEE TMP HV LV FEE TMP ROD HV LV GAS TMP HV LV FEE TMP HV LV TMP HV LV FEE TMP HV LV GAS TMP HV LV FEE HV LV GAS TMP HV LV FEE HV LV FEE HV LV FEE LIQ GAS HV LV GAS TMP ALITS COO TMP PLS 1 st draft URD exists Discussion started Not started

4 Detector DCS Milestones u User Requirements Document (URD)mid 2002 u Lab setupend 2002 u Individual sub-system u Connection to PVSS, some panels, limited logging and configuration facilities

5 Status Prototypes March 03 DCS Detectors … FC TOF SPDSDDSSD TPCTRDZDCPMDHMP RO ITS PHO CPVCAL FMDV0T0 TRATRI MU COSEMC HV LV FEE GAS TMP COO subsystems LSR HV LV FEE GAS TMP TS HV LV FEE HV LV FEE GAS TMP HV LV FEE GAS TMP HV LV FEE TMP HV LV FEE TMP ROD HV LV GAS TMP HV LV FEE TMP HV LV TMP HV LV FEE TMP HV LV GAS TMP HV LV FEE HV LV GAS TMP HV LV FEE HV LV FEE HV LV FEE LIQ GAS HV LV GAS TMP ALITS COO TMP PLS 1 st version exists started not started

6 Detector DCS Milestones u User Requirements Document (URD)mid 2002 u Lab setupend 2002 u Individual sub-system u Connection to PVSS, some panels, limited logging and configuration facilities u Intermediate detector tests & test beamsmid 2003 u A few sub-systems involved u Subsystem as finite state machine u Pre-installation testsmid 2004 u All sub-systems involved u Extended logging, configuration and alarm facilities u Detector as finite state machine u ECS and liaisons with DAQ, TRG u Final installationmid 2005 u Commissioningmid 2006

7 TPC test case PCI-CAN OPC server COMPUTER CAN contr. WIENER LV OPC client PVSS COMPUTER SUPERVISORY LAYER PROCESS LAYER FIELD LAYER DCS network CAN-bus LV CONTROL Functionality (FSM) Config. Logging Alarm handling Access handling PVSS Functionality (FSM) Config. Logging Alarm handling Device driver PVSS LV CU LV DU LV Physical Device

8 TPC test case PCI-CAN OPC server COMPUTER CAN contr. WIENER LV OPC clients PVSS COMPUTER SUPERVISORY LAYER PROCESS LAYER FIELD LAYER DCS network CAN-bus PCI-CAN OPC server COMPUTER CAN contr. ISEG HV CAN-bus Profibus PCI-Profib. DIM server COMPUTER Profib contr. FEE (RCU) PLC OPC server COMPUTER CAN contr. COOLING DEVICES CAN-bus

9 TPC test case LV CU LV DU LV Physical Device HV CU HV DU HV Physical Device FEE CU FEE DU FEE Physical Device COOL CU COOL DU COOLING Physical Device DCS TPC ECS DAQ

10 Needed today u URD’s u A 1 st version from all remaining detectors u A 2 nd version from all main detectors covering u All sub-systems u Operational requirements: state/transition diagrams u for sub-systems u Interlocks u Planning: milestones table for each sub-system u Budget: Central DCS and Detector DCS estimate u Prototyping u All detectors to start prototyping u Start using PVSS FW and one common solution u Make a “Lab Setup” u Central team to provide and support the necessary standard tools and components

11Tools USER APPLICATION Dbase FRAMEWORK: Back-end Tools and components DCS network Field-bus Process layer Field layer Supervisory layer USER APPLICATION DEV 1DEV 2 FRAMEWORK: Front-end Tools and components

12Tools Process layer Field layer Supervisory layer USER APPLICATION DB access ALARM PVSS CONFIG LOG ARCHIV WEB CONDIT ARCHIV COMMUNICATION FSM LOG PVSS CONFIG DET CONFIG FEE CONFIG FRAMEWORK DCS network Field-bus USER APPLICATION DEVICE DRIVERS DEV 1DEV 2 COMMUNICATION DBMS Standard: ACC resp. Specific: Detector resp. Detector resp. Standard: ACC resp. Specific: Detector resp. Detector resp. ACC resp. ALICE resp.

13 Needed mid 2003 u URD’s u Operational requirements: state/transition diagrams u for sub-detectors u Prototyping u sub-systems prototyped with FSM functionality