A rapidly developed control system for WITCH A. Lindroth, V. Kozlov.

Slides:



Advertisements
Similar presentations
How to Set Up, Secure and Manage A Network
Advertisements

Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
ITE PC v4.0 Chapter 1 1 Operating Systems Computer Networks– 2.
LSV2 Autonomous Chargers Design Team: (from the left) Branden Carpenter Wayne Romine Jon Stoker Dr. Hess (Advisor) Maggie Richardson.
CROSSBAR LAN TEAM 8 CURTIS PETE D. ERIC ANDERSON DANIEL HYINK JOHN MUFARRIGE.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
The Components of a PC (By Lewis Barrett)
 Main Components:  Sensors  Micro controller  Motor drivers  Chasis.
PLC: Programmable Logical Controller
–Streamline / organize Improve readability of code Decrease code volume/line count Simplify mechanisms Improve maintainability & clarity Decrease development.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
LabView Users Group Meeting June 20 th, 2006 Process Control Using Compact Field Point/Labview Real-time Michael Tockstein Microelectronics Technology.
ADAM-5000/TCP- Distributed Ethernet I/O
Magnetic Lab Hall Probe Measurement System 8/26/2003 Key System Requirements Motion Control: SmartMotor via RS axis: x(0-400mm), y(0-400mm), z(0-6000mm),
Introduction to the CS framework Definition of a framework Requirements Example Idea Cooking recipe Some statements Dietrich Beck,
XP Practical PC, 3e Chapter 17 1 Upgrading and Expanding your PC.
Fundamentals of Networking Discovery 1, Chapter 2 Operating Systems.
Hall Probe Calibration System
Chapter 20 Networks. 4 Questions that need to be answered concerning networks? –How will each computer be identified? –What kind of wire should you run.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Page 1 ADAM-6000 Web-enabled Smart I/O Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
AKR Sales Training For KOMAF Exhibition Kunyu Lee Product Manager
Christophe Martin / DQLPU Test Bench MPE-TM of 24/10/ DQLPU Functional Test Bench Front view Rear view.
USB DAQ Product USB DAQ Product Κώστας Γρηγορίου Sales Engineer Ιούνιος 26, 2007.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
WITCH Control System Michaël Tandecki & The WITCH collaboration S. Van Gorp, E. Traykov, V. De Leebeeck, G. Soti, F. Wauters, N. Severijns (K.U.Leuven),
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
Running EPICS on NI CompactRIO Initial Experience Eric Björklund (LA-UR )
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Chapter 19 Upgrading and Expanding Your PC. 2Practical PC 5 th Edition Chapter 19 Getting Started In this Chapter, you will learn: − If you can upgrade.
FAIR Accelerator Controls Strategy
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
CPAC May 2005 John Mosher – Honeywell Sensing & Control Sensor Actuator Manager (SAM) Controller Considerations And Specification Identification.
Processes Introduction to Operating Systems: Module 3.
Report on data acquisition and control systems of trap facilities Dietrich Beck, DVEE/GSI, 23 th of May 2002
The Control System (not only) for SHIPTRAP Dietrich Beck, DVEE/GSI, Motivation Requirements {The ISOLTRAP Control System SHIPTRAP and EU-Networks}
OPERA TT MEETING BRUSSELS, April 11, 2003 Status of the OPERA DAQ Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien, C.Girerd,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Software development Control system of the new IGBT EE switch.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
Guirao - Frascati 2002Read-out of high-speed S-LINK data via a buffered PCI card 1 Read-out of High Speed S-LINK Data Via a Buffered PCI Card A. Guirao.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
SIDE SCAN HARDWARE CONFIGURATION
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Buying Computer Hardware   A state agency added office space for new employees. To connect the employees to its network, the agency purchased 25 desktop.
2: Operating Systems Networking for Home & Small Business.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
SIDE SCAN HARDWARE CONFIGURATION HYPACK Connection Block Diagram GPS, single beam and tide data go into HYPACK ® SURVEY. Sidescan (with optional.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
SMOOTHWALL FIREWALL By Nitheish Kumarr. INTRODUCTION  Smooth wall Express is a Linux based firewall produced by the Smooth wall Open Source Project Team.
Chapter 1 : Computer Networks. Lecture 1. Introduction to computer networks: Network definition : A network is a collection of computers and other devices.
Logging and Alarms Apparatus monitored through GPIB – LakeShore temperatures – Agilent power supplies – AMI liquid level monitor Apparatus monitored through.
Chapter Objectives In this chapter, you will learn:
Intro to USB-6009 DAQ.
ProtoDUNE SP – Slow control temperature readout setup test
Read-out of High Speed S-LINK Data Via a Buffered PCI Card
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Networking for Home and Small Businesses – Chapter 2
Networking for Home and Small Businesses – Chapter 2
University of Illinois (UIUC)
University of Illinois (UIUC)
WITCH: Status & Outlook
Presentation transcript:

A rapidly developed control system for WITCH A. Lindroth, V. Kozlov

Contents Requirements Design choices Architecture Status Future improvements: next shutdown

Requirements Ready simultaneously with experiment!! Easy to develop further Control everything in the experimental set-up Scans & other things needed for trap experiments Cheap

Control System ”definition” Physical system Experimental hardware Electronics Computer control Control SystemExperiment

Order of decisions Buy this or that piece of experimental hardware Buy/design a Controller unit What type of connection between controller and PC? Include the relevant code in the Control System The physical side allways must come first  flexibility needed System ready fast  less flexibility possible, but one should not ”paint oneself into a corner”: commit only to few decisions System ready fast  not complete functionality at first

Design choices: Software Commitments Use LabView: Save time Use DSC, not replaceble: Save time, NI is big  this dependence is not likely to cause problems Make some minimal architecture choices, that can be kept even when the system keeps developing, thus not constraining the possibilities –Communiction architecture: Queued TCP/IP –Possible to hook on new programs to communication architecture

DSC WriteDatasocket SMC GUI main Analysis Communication DSC GPIBCANRS-232CYCLE Vacuum GUI HV GUI Config-GUIs GPIB Config CAN Config RS232 Config LOOP? Config? DIO Config Physical-Parameter namemap CaDAQ Gate CaDAQ Heart FILE Process BI Process QueueVariables which are used in the VIs, and loaded from files at start-up. Or simply files. Computer Diagnostics GUI Traps Cycle GUI Scans GUI SCANSISOBUS INTERLOCKS ANALOG OUT Communication TCP/IP Software architecture

Design Choices: Computer Hardware One powerful I/O PC (but making sure the software allows addition of further I/O PCs) –Passive backplane: many PCI and ISA slots –GPIB, 18ch RS232, CAN, DIO, AIO, ISOBUS, PPG100 all on one PC –Many National Instruments cards Cadaq Heart GPIB Card USB--> RS-232 box MIO24 Card DIO96 Card PPG100 Card CAN Card 1 RU Screw panel 2 RU LEMO panel Screw Panel Long cables (~15m)To devices

Design Choices: Controllers/Electronics Many controllers are built by our electronics department: cheaper, we get exactly what we want, they can repair/upgrade it, some things are not available commersially, we decide how to pack different functionality into separate modules,... DELAY BOX 10 ns jitter 100 ns precision 0 ns to ~20s (+50ns allways) 20 ch 2 outputs/ch: delay/gate rs-232

Design Choices: Network Our own, independent network, with a gateway to the ISOLDE network. The gateway will allow control of WITCH via the Web. We are now learning how to get the appropriate permissions from the CERN Network Security guys. An ISOLDE network PC for ISOLDE control. ”Cadaqgate” ”Cadaqheart” To ISOLDE network ”Cadaqgate” In light building ”Cadaqheart” In ISOLDE hall TCP/IP To ISOLDE network Repeater?

Recent developments: Vacuum system Gauge Controller Valve Valve Control box RS232 Relay Vacuum Interlock box DIO card on CaDAQheart

Recent developments: Trap Electronics COMPONENTS PPG100 Delay box 52 ch static voltage supply/switcher +/-20V 24 ch rf splitter+static offset box Temporary solution! PPG100 Delay Box Switchable Static Voltage supply Rf splitter, inverter, offset adder rf func. gen

Recent Developments: Software Status SMC Communication DSC GPIBRS-232CYCLE Vacuum GUI GPIB Config RS232 Config LOOP? Config? DIO Config Physical-Parameter namemap CaDAQ Gate CaDAQ Heart Diagnostics GUI Traps Cycle GUI Communication

Outlook Near-future work Fill the software functionality gaps Secure quality of code Software Documentation Implement capacity enhancements based on test experiments this summer Upgrade to LabView 6.1 Software control of Voltages Get new, computer controllable trap electronics Get, install detector electronics Long-term work (starting in 6-12 months) Readback of electrode voltages: fieldbus Change so all PCs are of in-rack type Major upgrade of software functionality – where needs are found Focus on DAQ: separate computer with (highly) optimized readout speed