M. Brooks April ‘00 Core Week Muon Tracking Status Mechanics Chamber Building Magnet Mods Installation Plans Schedule FEE Preparations for octant test.

Slides:



Advertisements
Similar presentations
MuTr Shielding & Grounding Preliminary 10/6/99 (G. Hart) Additions 1/4/01 (REM)
Advertisements

Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Muon Tracking FEE R.E. Mischke Los Alamos 10 September, 1999 presentation to the PHENIX Muon Arm Technical Advisory Committee.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
South Arm FEE Performance Prior to Au run, all FEMs installed and working. Currently, 157 of 168 FEMs read out useful data. = 93.5% operational FEM losses:
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
U N C L A S S I F I E D 7 Feb 2005 Los Alamos RHIC Program David M. Lee Heavy Ion and Medium Energy 7 February 2005.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Status of NA62 straw electronics Webs Covers Services Readout.
M. Brooks, 29-Jan-02 P-25 Review South Arm: Hardware and Analysis Status Brief overview of muon arm Physics goals-->implied performance requirements Status.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
Drift Chamber Status Report Tokyo PHENIX Meeting.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
CLAS12 Drift Chamber Prototyping
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
PHENIX Timetable FY 2002 FY 2003 Prepare S  S  with Au-Au beams May 2001 March 2002 Jan 2001 June 2002 Sept st  physics (J/  suppression &
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Schedule Assume installation in 2002 shutdown, June-October(?), gives 1.5 years to complete pre-installation.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
17 Apr 2002 MCLARG Electronics Meeting News HEC Preshaper PRR passed on Thursday Apr 11 LECC02 (Workshop on LHC Electronics) will be held in Colmar, France.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Muon Tracking is still in the process of organizing our specialist & assistant shifts. Our strategy can be summarized as follows: A specialist should be.
LKr status R. Fantechi.
EMU Slice Test Run Plan a working document.
Regional Cal. Trigger Milestone: Production & Testing Complete
RPC FEE The discriminator boards TDC boards Cost schedule.
RPC Electronics Overall system diagram Current status At detector
Data Collection Module (DCM) (review, fabrication plan & chain test)
Presentation transcript:

M. Brooks April ‘00 Core Week Muon Tracking Status Mechanics Chamber Building Magnet Mods Installation Plans Schedule FEE Preparations for octant test Recent FEE Review Status of mechanical structures Schedule

M. Brooks April ‘00 Core Week Mechanics Status--Station 1 All chambers completed (some time ago) Expect to ship to BNL in May in preparation for installation Mechanical support structures on order Added tasks: All testing of Cathode Preamp Chips Design, prototyping, production of LV distribution system Presentation for upcoming FEE safety review Doug Fields Nicki Bruner Bernd Bassalleck Benji Lewis R. Fraga D. Koehler Tim Thomas John Behrendt

M. Brooks April ‘00 Core Week Mechanics Status--Station 2 All chambers completed Still undergoing various performance, leak tests Associated support structure under construction Dave Lee Rusty Towell Walter Sondheim Myung-Shin Chung Val Armijo Benny Montoya Greg Hart Matt Shaw Chris Kuberg Ray Savino Bill Sandhoff Korea Univ. WooYoung Jang MinJung Kweon Christos Velissaris

M. Brooks April ‘00 Core Week Mechanics Status--Station 3 Last assembly shipped from NMSU 5-Apr-00 Expect last chamber to be complete next week Still undergoing various performance, leak tests Dave Lee Rusty Towell Walter Sondheim Greg Hart Matt Shaw Chris Kuberg Ray Savino Bill Sandhoff Korea WooYoung Jang MinJung Kweon Steve Pate Christos Velissaris Vassili Papavassiliou Gary Kyle

M. Brooks April ‘00 Core Week Mechanics Status--Turning the muon magnet into Swiss Cheese Mounting holes required at: Station 1 teacup rib Station 2 rib Station 2, piston Backplate Reconfiguration of piston support fins For: Chamber mounting FEE Mounting Eyebrow mounting Scaffolding Expect holes, excluding scaffolding and eyebrow to be complete this week or next Expect all drilling to be completed first or second week of May Fins completed

M. Brooks April ‘00 Core Week Mechanics Status--Installation Plans Integration Meeting to discuss installation and alignment plans Installation scaffolding expected to be completed and shipped from NMSU May 1 Lifting fixtures in process Station 2 mounting fixture (“spider”) being built Installation Schedule: Install spider6/8 Install St. 36/15 Install St. 26/27 Install St. 17/7 Install Align.7/13 Trial fit Buss7/20 READY for FEE7/26

M. Brooks April ‘00 Core Week FEE--Octant Test Work September TAC recommended larger-scale test of FEE system before full production-- ergo, we now have an “octant test” LV Cal Pulse Dick Mischke Ming Liu Melynda Brooks Pat McGaughey Mike Leitch Maureen Cafferty Scott Robinson Glenn Thornton Manny Echave Jake Archuleta Bernie Archuleta Greg Hart Andrew Hoover Greg Moran, Steve Pate Jack Fried

M. Brooks April ‘00 Core Week FEE--Octant Test Work St. 2 Production Chamber 6 readout planes 960 channels 4 chassis, fully populated 8 Control Boards 16 Cathode Readout Cards 12 channels of HV, dist. system 10 channels of LV, dist. system

M. Brooks April ‘00 Core Week FEE--Octant Test Work Mechanical Structures: Chassis and cross-rib assemblies delivered to BNL some time ago. Assembly mostly complete, by Andrew, some plumbing still needs to be received. Board Status: First control board (3rd round) received (LANL) and checked out o.k.; Full order placed. First Readout Card (3rd round) expected this week; full order will follow Noise specs already achieved on large fraction of the channels; this latest version should have layout fixes required to meet specs on all channels Backplanes expected 17-April HV Initial hookup complete Will switch to latest version of distribution system over the next couple of weeks LV Distribution system design completed by LANL/UNM First production board expected this month, also real LV supplies DAQ Hookup to GTM, DCM, associated software completed by Ming, Jamie, Mickey ARCNet: Preamp, AMU/ADC, FPGA downloads available (Andrew). Also, board monitoring (T, I, V) Calibration System Already had gone through few rounds (Pat and Mike); final or nearly final system expected available for octant test

M. Brooks April ‘00 Core Week FEE--Other Work Ancillary Systems: Full review of system completed by Steve Pate, Andrew Hoover. Orders of necessary VME modules begun Mechanics NMSU, Jake and LANL) In-magnet mechanical structures to nearly complete Eyebrow (platform for racks) completed UNM: Preamp testing nearly complete, LV distribution sent out, much work for FEE safety review completed by Nicki FPGA: Download via ARCNet worked on by Andrew, full production FPGA code worked on by Jack Fried Rack Layout completed, cable layout begun (Jan B.)

M. Brooks April ‘00 Core Week FEE--Schedule Order full set of production partsO.K. given 5-April following FEE review Octant test completemid-May Order production boardsMay-Aug. (may be shorter) Install Mech. Support StructureAug. 2 Install Platform and RacksAug. 9 Test boardsAug Assemble chassis, CRAsAug-Nov Install chassis, CRAsAug-Nov FEE Installation completeNov. 10 Activities to follow FEE Installation: Roll-in Connections to counting house, plumbing, etc. Replacement of beam pipe Installation of “collar” Installation of Magnet Buss Central arm work