1 2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule

2 2/4/2001Ludovico Pontecorvo INFN Roma2 H8: System Test One should not forget that at the end, all the chambers has to fit and work together. For this reason, the integration workshop next week is of utmost importance, to ensure that we have a first test before it is too late to make changes. George Mikenberg In H8 we should have a setup able to test all the aspects of our spectrometer from individual chambers to system aspects. Therefore we need: A Test station ( Individual chambers from BIS to BOS on rot.support): Provide R-T relation by autocalibration, measure resolution and chamber mechanical precision etc. A Barrel and End Cap Sectors Study system aspects: alignement and DCS, DAQ, installation, groundings, common behaviour of Trigger and Tracking chambers etc.

3 2/4/2001Ludovico Pontecorvo INFN Roma3 Interested groups: MPI: Will Send and set up one BOS chamber, will partecipate in the data taking. Will partecipate in the 2002 tests Roma-Pavia: Will provide and set up one BIL chamber, Large effort on DAQ-1, Set up small area trigger and Tracker, will partecipate in the data taking. LMU: Will provide Hodo trigger, but for this year will not partecipate in the tests. Will be interested in the 2002 tests. NIKHEF : Will Provide chambers this year and the following year. They are also interested in the alignement. Frascati: Interested in testing one chamber this year, expressed interest also on electronics and DAQ-1. Greeks: Interested in the test, probably will provide a chamber but will contribute less in the data taking. Dubna: No chamber testing in 2001, could provide some help for the running of the 2001 test. In 2002 interest in testing one chamber in H8

4 2/4/2001Ludovico Pontecorvo INFN Roma4 Beam Layout Barrel Sector Test Stand Old Counting Room New Counting room End Cap Sector

5 2/4/2001Ludovico Pontecorvo INFN Roma5 Test station Goals for 2001 å First Tests with beam tracks for the new Chambers complementary to cosmic set up. åCheck of the chamber performances (tracking resolution, efficiency, strobed noise level, Gas Distribution….) åCheck of the mechanical construction (wire position with respect with X-Tomo Results) åCheck of the new electronics åCheck of the new DAQ-1 å Trigger :10*10 and Hodoscope (large area) å External Tracker å Different beam angles for autocalibration (rotating Support) Experimental requirements

6 2/4/2001Ludovico Pontecorvo INFN Roma6 Measurements ResolutionTime spectra for all tubes Displacement of wire from nominal position vs tube # Lay 2 Lay 3 Lay 4 Lay 5 Lay 6 Autocalibration

7 2/4/2001Ludovico Pontecorvo INFN Roma7 Test station Layout Tracker: 2 coordinates angular resolution ~ 2 mrad Modified Calypso Rotating Support: Can accommodate BIS, BIL, BOS chambers Dimensions: Width= 400 cm Height=475 cm Length=180 cm Trigger Hodoscope 60*100 cm 2 Small area trigger 10*10 cm 2

8 2/4/2001Ludovico Pontecorvo INFN Roma8 Rotating Support Maximum weight:450 Kg Former Calypso Support Enlarged support Rotation is possible for all chambers 475 180 400 BIS BIL BOS 180 355 320

9 2/4/2001Ludovico Pontecorvo INFN Roma9 BOS Test F The BOS chamber will be mounted on the rotating support. F It should provide the RT-Relation to the Barrel Sector Chamber. F Together with the Tracker should provide tracking to the other chambers. F There will be a significative portion of the chamber equipped with electronics. F The chamber could be set up in the H8 Area during August by MPI people and could be tested in the first week of September. Typical test: Autocalibration: Angular scan  ~10 0 small area trigger 30 KEvts/run Autocalibration at large angles: Angular scan  ~20 0 @ 30 0 small area trigger 30 KEvts/run T0, Noise, Chamber uniformity, Mechanical precision: Large Area trigger 2 MEvts

10 2/4/2001Ludovico Pontecorvo INFN Roma10 BIS Test FThe BIS chamber will be mounted on the rotating support. FThe chamber could be set up in the H8 Area in the second week of September by the Greek groups and could be tested in the third week of September. Typical test: Autocalibration: Angular scan  ~10 0 small area trigger 30 KEvts/run Autocalibration at large angles: Angular scan  ~20 0 @ 30 0 small area trigger 30 KEvts/run T0, Noise, Chamber uniformity, Mechanical precision: Large Area trigger 2 MEvts

11 2/4/2001Ludovico Pontecorvo INFN Roma11 Barrel Sector Datcha Rails The main aim of the test of the barrel sector for this year will be to have three chambers mounted on the rails connected to gas system equipped with few electronic channels. Study of the installation issues, perform tracking within the sector and compare with the tracks given by the BOS- Tracker system.

12 2/4/2001Ludovico Pontecorvo INFN Roma12 Barrel sector (2) BIL chamber: Rome Pavia Groups BML Frascati Group BOL NIKHEF Group Assume the chambers arrive at CERN fully equipped with Gas distribution, faraday cage and few mezanine boards installed. Install the chambers on the DATCHA Rails during August, set up gas connections, set up HV and LV connections, study the grounding and noise conditions on few read out channels. During September perform Data Taking together with the test station chambers.

13 2/4/2001Ludovico Pontecorvo INFN Roma13 Work to be Done: 2001 F Infrastruct.: Move counting room, Install new Gas system, Install DATCHA Rails, Modify Calypso rotating support, study interfaces between detectors and supports F Detectors: Install small area trigger, Recable Hodo Trigger, Recable and set up Tracker, Install Autocalibration Chambers, Install Sector chambers. F DAQ:Install DAQ-1 Hardware and Software F Monitoring: Implement monitoring task on DAQ-1 system F DCS:Implement at least the DCS ambient parameters reading. F Offline:Implement the new data format decoding, and use data to test the calibration and tracking programs (e.g. CALIB).

14 2/4/2001Ludovico Pontecorvo INFN Roma14 Work Schedule

15 2/4/2001Ludovico Pontecorvo INFN Roma15 Goals for the Barrel Sector in 2002 F Install a full Barrel Sector: 2 BIL, 2 BML and 2 BOL chambers on DATCHA Rails, equippe the chambers with electronics. F Install new Gas Sysytem with recirculation F Install the full chamber DCS. F Install alignement system and test it with tracks F Install trigger stations together with BML and BOL, Study installation issues, working condition and interferences between the detectors. F Install first level trigger prototype and test with tracks F Complete the DAQ -1, RPC Read-Out, test of the first and high level triggers.

16 2/4/2001Ludovico Pontecorvo INFN Roma16 Possible Beam Layout:2002 Full Barrel sector Magnet 20 GeV 50 GeV

17 2/4/2001Ludovico Pontecorvo INFN Roma17 Possibility to replace the test station with a Magnet: Beam angular spread for Autocalibration. Test the alignement system with different tracks angle needed to test alignement in 3 dimensions. Need to use low momentum beams… Low rates? Why a Magnet?


Download ppt "2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule."

Similar presentations


Ads by Google