ECAL silicon- tungsten status

Slides:



Advertisements
Similar presentations
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
CALICE – 12/07/07 – Rémi CORNAT (LPC) 1 ASU and standalone test setup for ECAL MAIA BEE project Overview DAQ dedicated Sensor test In situ debug and maintenance.
Taikan Suehara, 13 May 2014 page 1 Status of SiW-ECAL development for ILD Taikan Suehara (Kyushu University) on behalf of ILD SiW-ECAL development.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
KEK meeting – September 2006 J.-C. Brient (LLR) 1 Jean-Claude BRIENT LLR – Ecole Polytechnique LLR – Ecole Polytechnique CALICE status and Plans.
1 Status of ECAL Mechanical and thermal R&D in Grenoble FJPPL’08 Denis Grondin Julien Giraud
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
FEV Boards status N. Seguin-Moreau on behalf of
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Thursday Sept 17, 2009CALICE week IPN Lyon1 EUDET Module Plans of integration and assembly Julien Bonis SLAB assembly : Process phases.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
CALICE SiW EcalAboud Falou/ LAL-Orsay Detector SLAB Integration EUDET Prototype Slab cross section, thickness budget Space Frame Ladder {Step.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
– EUDET module – Report from Mechanics Brainstorming Marc Anduze – 30/06/2009 Laboratoire Leprince Ringuet Ecole polytechnique - Palaiseau.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Monday June 8, 2009CALICE SiW ECAL Meeting ULC London EUDET prototype Thermal drain and plans for module assembly Julien Bonis CAD model.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
CALICE calorimeters Power Issues Kieffer Robert IPN Lyon « Linear Collider Power Distribution and Pulsing workshop » May 2011, LAL
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Mickael Frotin– 05/07/2010 EUDET MECHANICAL R&D EUDET news - 1.
FKPPL, Febuary , Rémi Cornat 1 FKPPL technical activities CALICE Si-W ECAL Rémi CORNAT
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Understanding of SKIROC performance T. Frisson (LAL) On behalf of the SiW ECAL team Special thanks to the electronic and DAQ experts: Stéphane Callier,
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
EUDET France – 05/04/07 – Rémi CORNAT (LPC) 1 CALICE instrumental chain looking (not so) forward to EUDET Overview Wafer characterization Sensor test In.
AIDA st annual meeting DESY, 27/01/2016
CALICE Silicon ECal Sensors Status and prospects
ECAL EUDET MODULE Summary talk
Status of Ecal(s) for ILD
ECAL SLAB Interconnect by FFC: Intro
ECAL project in the future 2-3 years
C. de La Taille IN2P3/LAL Orsay
CALICE Collaboration Meeting at UT Arlington
CALICE Collaboration Meeting KEK/Japan – April 2015
prototype PCB for on detector chip integration
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
STATUS OF SKIROC and ECAL FE PCB
Ecal Front End Electronics
Stéphane Callier, Dominique Cuisy, Julien Fleury
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

ECAL silicon- tungsten status Jean-Claude Brient ( for ECAL group) OUTLINE ■ Wafers ■ PCB FEV7..8.. see Stephane Callier (LAL-Omega) ■ ASU ( Active System Unit) ■ Integration ■ Mechanics see Julien Giraud (LPSC) ■ VFE see Stephane Callier (LAL-Omega) ■ DAQ see Remi Cornat (LLR) CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

Wafers : ■ 40(-1) wafers 9x9 cm² from HPK , > Larger wafer give better ratio Active/dead zone > ALAS, continuous guardring !!! (not as announced by HPK-France) ■ R&D for wafers with discontinuous guardring at LLR proposals for common R&D with Czech , India, Korea ■ R&D on wafers design to reduce the cost has just not started !! (CERN ) CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

Wafer from INDIA Guard rings protect Silicon sensors against breakdown “Square events” when shower energy deposited in guard ring Coupling between continuous ring and edge pixels Studies underway to reduce effect with segmented guard rings But what is the effect on surface leakage current ??? Wafer from INDIA CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

Test with wafer from BARC-India (Mumbai Atomic Research Center is member of CALICE) Injection of signal 1 2 3 4 Set of guardrings CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

ASU : ● Gluing silicon wafer on ASU ● Validation of ASU before integration : >>>> Connection at the end of the layer ● Connection between ASU CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

Gluing silicon wafers on ASU : - Controlled glue dot deposition on the PCB - The (four) Si Wafers are picked up, aligned and placed on the PCB - Accurate thickness and planarity control via vacuum jigs - The assembled ASU is allowed to cure Test board with Dispenser Robot BGA Workstation for Wafer Placement “Gluing” rate 0.4 Hz Precise Wafer Placement by Split Field Optics CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

Solderless connector (@LLR) ASU VALIDATION (quality test ) Solderless connector (@LLR) Ready Start tests with ASU ‘CIP’ version soon Mickael FROTIN Patch cables to be added CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

Assembly procedure @LAL, Cambridge Rehearsal of the assembly of a slab Some experience acquired thanks to the assembly of specific slabs for thermal test A procedure has been established including the calibration of the exposure time to the heating lamp CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

INTEGRATION : first test Thermal Layer – Developping the Techniques for Layer Construction DIF and Adapter Card Region Proof-of-principle to build long layers CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

of ASU Line established Example for Assembly Tools – Handling of fragile layers Handling by vacuum lifter Line of ASU Positioning of Vacuum Lifter on ASU Line Vacuum Lifter Vacuum Lifter Line of ASU (Careful) handling of ASU Line established CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

MECHANICS : Assembling the structure next september Assembly mould is designed, the procedure for the call of offer has being launched. The production of the first single layers will start very soon. Assembling the structure next september (with prior , a test in autoclave with only the mould) CALICE at Arlington - ECAL SiW status

Foreseen next is the destructive test of the demonstrator (after use for Thermal R&D) If you want to test something there … contact us ASAP CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

Summary and conclusions - 1 ● First test with ASU , SPIROC and new generation DAQ in fall 2010 (with SKIROC ??) ● Feed the structure with one SLAB (not all silicon equipped, but all the ASU) 1/2011 ● Feed with scintillator SLAB 2/2011 ● Test with a 24X0 tower in test beam ?? May be end of 2011 or start of 2012 ?? (with power pulsing, new silicon wafers, etc…) CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

Summary and conclusions - 2 ● Essentials R&D on silicon are on stand-by (low resource both on material and Manpower) ● Funding will be a problem to proceed with the mandatory R&D (silicon, slab integration, mechanics, etc…) i.e. the budget 2010 from CNRS for material has been reduce by 2/3 But remember, when including the manpower salaries, the budget is still above 1Meuro/year ● Travel budget will not allows FNAL Test Beam (except if laboratories will use their own resource…) ● Where are the ECAL contributions from Russia, Czech group , EWHA ? Cambridge in UK is alone, very low resource in France LLR/LAL/LPSC …. New contribution possible in future from Korea, etc… but today , the situation is critical Therefore , We decide with Japanese groups to have only ONE ECAL project European contract AIDA is the only possible way to continue on silicon sensors !! (if negotiation don’t reduce too much and if the repartition allows ECAL to do something) CLIC never speak about ECAL …. May be they will have to do it, one these days !!! CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

Common design for silicon or scintillator : ECAL W/Scin ECAL W/Si Heat shield: 100+400 µm (copper) PCB: 1200 µm (with FE) « X » Strip : 2000 µm PCB: 1200 µm (with FE embedded) wafer: 325 µm glue: 75 µm « Y » Strip : 2000 µm HV Kapton® film: 100 µm CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)

CALICE at Arlington - ECAL SiW status Granularity is beautiful CALICE at Arlington - ECAL SiW status

SPARES

ASUs to SLAB The joint between two boards - Joint by halogen lamp heating up tin-bismuth soldering paste (Method developed by U. Cambridge)‏ - Heating Temperature ~200o C Delicate Process for Demonstrator – Easier for EUDET Module CALICE at Arlington - ECAL SiW status - Jean-Claude Brient (Laboratoire Leprince-Ringuet)