UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Introduction to Performance Contracting. What Is an ESCO? An Energy Services Company helps customers: –Upgrade facilities, including both: Energy efficiency.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Contractor Safety Management
Building Commissioning
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
Project Close Out CTC-470.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
1 Construction Planning and Management: Tanya Vartivarian Director of School Services IFF June 2010.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Genesis Solar Module Brochure ™
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
UESC Project Identification The Utility Audit ä Preliminary issues ä Arranging the audit ä Kickoff meeting ä The audit ä The audit results Establish Terms.
Phoenix Convention Center Phoenix, Arizona Introduction to UESC Webinar Project Financing UESC Basics: Project Financing Through your Utility Julia Kelley.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
1-7 Contract Financing Don Shannon. What is Contract Financing … “the means of obtaining the funds necessary to perform the contract including – Payment.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Module 12 Session 12.1 Visual 1 Module 12 Terminating the Project Session 12.1: Terminating the Project.
Creating A Cleaner Energy Future For the Commonwealth Renewable Closed Landfills Eileen McHugh Municipal Energy Programs Coordinator July 26,
Scheduled Inspections
Contract Training Class I
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Agency Construction Management :CM NOT AT-RISK
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Energy Project M&V: Reports that Add Value October 27, 2015.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Energy and Environmental Solutions Company Confidential—Siemens Building Technologies 2008 SLS 242/342: Performance Contracting - Proposing Opportunities.
Gary Nower – Wilfrid Laurier University Edward Ng – EY
PROJECT MANAGEMENT 2 Chu Eu Ho
(Additional materials)
9/18/2018 Bids CONTRACTING Khamis…..
Engineering Project Tendering.
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Financial and Administrative presentation on PARTICULATES project
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
Presentation transcript:

UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package ä Commissioning Stop and $ Engineering & Design Package ä CO issues TO ä Review E&D Package ä CO negotiates final price proposal Decision Go/ No go The Payment Period ä Invoices ä Payments ä Periodic Performance Verification ä Follow-on projects

Engineering and Design ä CO issues TO ä Review E&D Package ä CO negotiates final price proposal Decision Go/ No go

Initiating the Engineering and Design Package  Issue your task order for engineering and design –Include agency and site specific requirements  The utility will respond with a full set of plans and detailed specifications App. 4

When You Review the Package  Look for consistency with the feasibility study in engineering drawings and design specifications –This should be 100%, you shouldn’t see any new design in the construction phase  Use FEMP for assistance –They have specialized expertise in advanced engineering technologies and can offer cautions and advice in areas like photovoltaics, systems controls and others

Reviewing the E&D Package  The design package should include at least the following for each ECM: –Installation drawings –100% of plans and specs Commissioning, M&V, O&M (if required)Commissioning, M&V, O&M (if required) –Final price proposal –Estimated construction schedule Planned service interruptionsPlanned service interruptions Environmental complianceEnvironmental compliance Quality controlQuality control ECM installation sequenceECM installation sequence

Payments & Performance Bonds  Within a specified time frame after approval of ECM installation plans, the utility shall submit –Acceptable payment and performance bonds or –Letter of credit

Start Planning for Installation  Make sure that site inspection personnel are available  Provide for a site individual to assist project implementation You’ll want to have this set up so you can move once you see the final construction schedule You’ll want to have this set up so you can move once you see the final construction schedule

Commissioning and the Design Phase  Develop design and operating intent  Perform commissioning-focused design reviews  Develop Commissioning Plan & Specifications for construction –Should include specifics on commissioning during construction, acceptance and post acceptance

Negotiating the Final Price Proposal  Price proposal includes –Construction cost –Financing cost over the term of the loan –Optional item cost (non-required costs) –Project management costs –Interest rate

Structure the Interest  Interest payments during the construction period and the post-acceptance period: –Option 1: Structure the financing so that the cost of interest during the construction period is added to the total project cost resulting in one amount to be financed. This is the most common optionThis is the most common option –Option 2: Structure the financing to include separate interest rates during construction (short term) and post-acceptance (long term).

Total Interest Rate Base rate (SWAP rate*) 6.00% Adder 1.40% Hedge+ 0.36% Total 7.76% *Rates can be found at

Components of the Interest Rate  Base rate –Historically based on the Treasury Note rate for payment term of contract –Currently based on SWAP rate

Adders  Basis points added as a result of financiers perception of project’s risk –Basis point = 1/100% or.01%  Contributing elements: –Utility’s credit rating –Loan amount –Loan term –Project’s technical risk

Adder Example  Given: a major utility company with a good balance sheet, a $1 million project with a 10 year term and proven relatively simple technologies –Adder should be on the low side, basis points A less appealing project would have a higher adderA less appealing project would have a higher adder

Hedge  Basis points that protect the financier’s risk of interest rate fluctuations during project implementation –A typical hedge is 3-5 basis points per month 12 3 basis points per = 36 basis points or.36%12 3 basis points per = 36 basis points or.36%

Sources of Financing  Utility: internal financing is not usually competitive due to internal rate of return requirement (>10%)  Consider some form of “competition” for third part financiers

Project Management  Projects are partnerships but the utility is a business and must make a profit for shareholders –Utility profit (IRR) is typically 10-14% on services provided  You will be charged for project management and overhead (OH) fees –OH fees are ~ 15-20% on services portion –Project management fee is ~ 3-5% depending on complexity

Go or No Go?  Will you continue the process? –No? Pay for the E&DS. –Yes. CO finalizes the contract, move to construction and installation

Construction and Installation ä Issue TO ä The pre- construction meeting ä Final construction package ä Commissioning

Initiate Project Construction and Installation  CO issues Task order for Construction and Installation Phase  Arrange a pre-construction meeting

Pre-construction Meeting  The COTR and other facilities or engineering staff and utility reps must review and coordinate the project schedule and installation & inspection  Approve the final construction schedule –Bring in your designated inspection and implementation site personnel (identified during D&E)  Check to see that appropriate permits have been acquired

Construction  The agency monitors the utility’s and subcontractor’s progress throughout the installation period to assure work is proceeding as planned

Project Documents (Deliverables)  O&M manuals for installed ECMs  Inventory of spare parts (lamps, ballasts)  As-built drawings or revisions/updates to existing as-builts  Training  Warranties

Commissioning and Acceptance  Commission each ECM as you go  The utility must notify the agency when the ECM is ready for testing and performance verification  The government must verify that new equipment was installed properly, then test equipment to ensure that it is performing to spec.

Commissioning and the Construction Phase  Building systems including architectural, structural, mechanical, electrical, and controls are installed, undergo pre- functional performance tests, and are placed into operation.

Project Completion and Acceptance  Per contract requirements, the utility notifies the agency of project completion  Agency deems –Substantial completion/beneficial occupancy –Final completion and acceptance –Completion of punchlist  The agency notifies the utility of project acceptance

The Payment Period ä Invoices ä Payments ä Periodic Performance Verification ä Follow-on projects

Invoices  Invoices are only accepted and processed after ECM installation and government signature on a Certificate of Completion (or whatever is required by the contract)

Payments  CO must notify the utility that the installation has been accepted and that it complies with the terms of the contract  Utility bill paid from funding account determined during acquisition planning

Post-Installation  Conduct periodic performance verification –Receive M&V regular interval reports (if required)  Verify and document the performance and actual energy savings progressing in sequence, from individual equipment through subsystem operation to complete systems and finally whole building.

Include Training  Hands-on operation of the equipment including start-up, operation in normal and emergency modes, shutdown procedures, seasonal changeover, and manual/automatic control  Requirements and schedules for routine maintenance  Energy Management and Control System sequencing, strategies, operation and programming  Health and safety issues and concerns  When and how to re-commission

Performance Acceptance Phase  Operations are proven under partial and full load, in all seasons, and under abnormal or emergency conditions.  Some commissioning contracts require an effort to fine-tune and optimize system operation, comfort control, control parameters, sequences and energy efficiency.

Performance Acceptance  Important in ensuring the effective, ongoing functioning of a facility’s architectural, structural and other systems.  As use and function of facilities change, the building systems need to be adapted to the changing requirements of occupancy and utilization.

Follow-on Projects  Any additional ECMs or services proposed must be within the contract scope  If desired, CO will issue a task order and utility will submit a technical and price proposal.

Wrap Up Question and Answers